scholarly journals Influence of large scale topography on gravitational rock mass movements: New insights from physical modeling

2006 ◽  
Vol 33 (21) ◽  
Author(s):  
D. Bachmann ◽  
S. Bouissou ◽  
A. Chemenda
2004 ◽  
Vol 261-263 ◽  
pp. 1097-1102 ◽  
Author(s):  
Jian Liu ◽  
Xia Ting Feng ◽  
Xiu Li Ding ◽  
Huo Ming Zhou

The time-dependent behavior of rock mass, which is generally governed by joints and shearing zones, is of great significance for engineering design and prediction of long-term deformation and stability. In situ creep test is a more effective method than laboratory test in characterizing the creep behavior of rock mass with joint or shearing zone due to the complexity of field conditions. A series of in situ creep tests on granite with joint at the shiplock area of the Three-Gorges Project and basalt with shearing zone at the right abutment of the Xiluodu Project were performed in this study. Based on the test results, the stress-displacement-time responses of the joints and basalt are analyzed, and their time-dependent constitutive model and model coefficients are given, which is crucial for the design to prevent the creep deformations of rock masses from causing the failure of the operation of the shiplock gate at the Three-Gorges Project and long-term stability of the Xiluodu arc dam.


2013 ◽  
Vol 838-841 ◽  
pp. 705-709
Author(s):  
Yun Hao Yang ◽  
Ren Kun Wang

Large scale underground caverns are under construction in high in-situ stress field at Houziyan hydropower station. To investigate deformation and damage of surrounding rock mass, a elastoplastic orthotropic damage model capable of describing induced orthotropic damage and post-peak behavior of hard rock is used, together with a effective approach accounting for the presence of weak planes. Then a displacement based back analysis was conducted by using the measured deformation data from extensometers. The computed displacements are in good agreement with the measured ones at most of measurement points, which confirm the validities of constitutive model and numerical simulation model. The result of simulation shows that damage of surrounding rock mass is mainly dominated by the high in-situ stress rather than the weak planes and heavy damage occur at the cavern shoulders and side walls.


2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Piotr MAŁKOWSKI ◽  
Zbigniew NIEDBALSKI ◽  
Łukasz BEDNAREK

Ensuring the stability of mining excavations is a crucial aspect of underground mining. For thispurpose, appropriate shapes, dimensions, and support of workings are designed for the given mining andgeological conditions. However, for the proper assessment of the adequacy of the used technical solutions,and the calibration of the models used in the support design, it is necessary to monitor the behavior of theexcavation. It should apply to the rock mass and the support. The paper presents the automatic systemdesigned for underground workings monitoring, and the example of its use in the heading. Electronicdevices that measure the rock mass movements in the roof, the load on the standing support, and on bolts,the stress in the rock mass, are connected to the datalogger and can collect data for a long of time withoutany maintenance, also in hard-to-reach places. This feature enables the system to be widely used, inparticular, in excavations in the vicinity of exploitation, goafs, or in the area of a liquidated exploitationfield.


2004 ◽  
Vol 63 (1) ◽  
pp. 71-75 ◽  
Author(s):  
J. Rohn ◽  
M. Resch ◽  
H. Schneider ◽  
T. M. Fernandez-Steeger ◽  
K. Czurda

2017 ◽  
Vol 26 (1) ◽  
pp. 30-49 ◽  
Author(s):  
Gregory A. Houseman

Istanbul and Bucharest are major European cities that face a continuing threat of large earthquakes. The geological contexts for these two case studies enable us to understand the nature of the threat and to predict more precisely the consequences of future earthquakes, although we remain unable to predict the time of those events with any precision better than multi-decadal. These two cities face contrasting threats: Istanbul is located on a major geological boundary, the North Anatolian Fault, which separates a westward moving Anatolia from the stable European landmass. Bucharest is located within the stable European continent, but large-scale mass movements in the upper mantle beneath the lithosphere cause relatively frequent large earthquakes that represent a serious threat to the city and surrounding regions.


Author(s):  
Arash Gobal ◽  
Bahram Ravani

The process of selective laser sintering (SLS) involves selective heating and fusion of powdered material using a moving laser beam. Because of its complicated manufacturing process, physical modeling of the transformation from powder to final product in the SLS process is currently a challenge. Existing simulations of transient temperatures during this process are performed either using finite-element (FE) or discrete-element (DE) methods which are either inaccurate in representing the heat-affected zone (HAZ) or computationally expensive to be practical in large-scale industrial applications. In this work, a new computational model for physical modeling of the transient temperature of the powder bed during the SLS process is developed that combines the FE and the DE methods and accounts for the dynamic changes of particle contact areas in the HAZ. The results show significant improvements in computational efficiency over traditional DE simulations while maintaining the same level of accuracy.


2021 ◽  
Author(s):  
Yang An ◽  
E-chuan Yan ◽  
Xing-ming Li ◽  
Shao-ping Huang

Abstract As a main method of petroleum strategic reserve in China, underground water-sealed storage cavern owns lots of outstanding advantages, such as low operating costs, high safety, and land resource conservation. Main caverns are important structure in underground project and the layout parameters and excavation scheme will have significant impact on overall project quality. The optimization method of main cavern layout and excavation scheme was put forward by a proposed large-scale underground water-sealed cavern project in China. First, based on field survey results, the Hoek-Brown strength criterion combined with rock mass quality Q classification system was used to estimate the equivalent mechanical parameters of rock mass. Second, the numerical experiments were carried out by relying on 3 Dimensions Distinct Element Code (3DEC). The discontinuous medium model was adopted, and displacements of key points, maximum displacement values and volume of the plastic zone were used as evaluation indicators. Axial direction, buried depth, spacing and excavation scheme of main caverns have been optimized. Results showed that axial direction should adopt NW325°, buried depth of cavern roof should locate at -100m, and distance between adjacent main caverns should be 1.5 times the span (36m). The “jump excavation” mode was recommended in construction. That is, the caverns on both sides should be excavated first, and the middle cavern should be excavated later. This mode could effectively reduce the interaction effect between caverns. This method has the characteristics of easy data acquisition and strong operability. It could be used to guide design and construction of similar projects . As a main method of petroleum strategic reserve in China, underground water-sealed storage cavern owns lots of outstanding advantages, such as low operating costs, high safety, and land resource conservation. Main caverns are important structure in underground project and the layout parameters and excavation scheme will have significant impact on overall project quality. The optimization method of main cavern layout and excavation scheme was put forward by a proposed large-scale underground water-sealed cavern project in China. First, based on field survey results, the Hoek-Brown strength criterion combined with rock mass quality Q classification system was used to estimate the equivalent mechanical parameters of rock mass. Second, the numerical experiments were carried out by relying on 3 Dimensions Distinct Element Code (3DEC). The discontinuous medium model was adopted, and displacements of key points, maximum displacement values and volume of the plastic zone were used as evaluation indicators. Axial direction, buried depth, spacing and excavation scheme of main caverns have been optimized. Results showed that axial direction should adopt NW325°, buried depth of cavern roof should locate at -100m, and distance between adjacent main caverns should be 1.5 times the span (36m). The “jump excavation” mode was recommended in construction. That is, the caverns on both sides should be excavated first, and the middle cavern should be excavated later. This mode could effectively reduce the interaction effect between caverns. This method has the characteristics of easy data acquisition and strong operability. It could be used to guide design and construction of similar projects .


Author(s):  
L.K. Miroshnikova ◽  
A.Yu. Mezentsev ◽  
G.A. Kadyralieva ◽  
M.A. Perepelkin

The Zhdanovskoe copper-nickel sulfide ores deposit is located in the north-west of the Murmansk region and is a mineral raw material source for JSC «Kola MMC». The main mining method used is sublevel caving. In some areas, due to the complex shape of the ore bodies, the open stoping mining method is used which requires determining stable parameters of stopes and pillars. It is necessary to study the stress-strain state of the deposit to ensure safe mining conditions. One of the possible solutions is the modeling of the stress-strain state of rock mass using the finite element method, for example, CAE Fidesys, which is FEMbased software. The use of CAE Fidesys for solving geomechanics tasks allows creating models of individual excavation units to determine the stability of stopes and pillars, and large-scale models that include several ore bodies and areas of the host rock mass. The article considers solutions of both types of geomechanic tasks using CAE Fidesys for conditions of the Zhdanovskoe deposit.


Author(s):  
V.N. Tyupin ◽  

At present, to ensure seismic safety in massive explosions, the analytical dependence of the determination of the vibration velocity of M.A. Sadovsky rock mass is mainly used. This dependence is widely used in the creation of seismic-safe technologies for mineral deposits open-pit and underground mining. However, scientific research and production experience showed that the rate of oscillation depends on the energy parameters of the explosive, the diameter and length of its charges, the number of simultaneously exploded charges, the number of deceleration stages, the deceleration interval, etc. The purpose of this article is to predict the speed fluctuations of the massif on the earth surface when conducting the underground explosions depending on the parameters of large-scale explosions and physical-technical properties of the rock masses in the areas of explosion of the protected object. The formulas for calculating the velocity of rock mass on the earth surface during large-scale explosions in the underground conditions are substantiated and presented. The formulas were used for calculating the vibration velocities of the rock mass on the earth surface in accordance with the parameters of drilling and blasting operations during large-scale explosions in the mines of GK VostGOK. Comparison of theoretical (calculated) data and the results of actual measurements indicates their convergence. By changing the controlled parameters in the calculation formulas, it is possible to quantitatively reduce the seismic effect of a large-scale explosions on the protected objects. Further research will be aimed at studying the influence of tectonic faults, artificial contour crevices, filling massif or mined-out space on the rate of seismic-explosive vibrations during blasting operations in the mines. The research results can be used in the preparation of rules for conducting large-scale explosions at the underground mining.