scholarly journals A decision modelling approach for selection of biological nutrient removal systems for wastewater

2018 ◽  
Vol 156 ◽  
pp. 03013
Author(s):  
Carla Mae Pausta ◽  
Ramon Christian Eusebio ◽  
Arnel Beltran ◽  
Aileen Huelgas-Orbecido ◽  
Michael Angelo Promentilla

This paper proposes a decision model built on a hierarchical network for optimal selection of biological nutrient removal systems (BNR) in wastewater treatment plants. BNR is an important component of a sustainable wastewater management wherein resource recovery from wastewater becomes an integral part of the municipal wastewater treatment plants (WTP). However, selection of the most appropriate technology or systems requires a multiple criteria analysis. This study focuses on the following criteria namely 1) Economic aspect; 2) Technical aspect; 3) Environmental Aspect; and 4) Space Requirement. The following alternatives were then evaluated: 1) 3 Stage Pho-redox (A2O); 2) 5 Stage Bardenpho (5BP); 3) University of Cape Town (UCT); 4) Virginia Initiative Plant; 5) Sequencing Batch Reactor (SBR); 6) Membrane Bioreactor (MBR). A fuzzy ANP approach with Monte Carlo simulation was used to derive the overall priorities of these alternatives. This decision modelling approach addresses the uncertainty and complexity involved in the selection of appropriate BNR in Metro Manila’s WTP.

1990 ◽  
Vol 22 (7-8) ◽  
pp. 53-60 ◽  
Author(s):  
B. Rabinowitz ◽  
T. D. Vassos ◽  
R. N. Dawson ◽  
W. K. Oldham

A brief review of recent developments in biological nitrogen and phosphorus removal technology is presented. Guidelines are outlined of how current understanding of these two removal mechanisms can be applied in the upgrading of existing wastewater treatment plants for biological nutrient removal. A case history dealing with the upgrading of the conventional activated sludge process located at Penticton, British Columbia, to a biological nutrient removal facility with a design flow of 18,200 m3/day (4.0 IMGD) is presented as a design example. Process components requiring major modification were the headworks, bioreactors and sludge handling facilities.


1997 ◽  
Vol 36 (1) ◽  
pp. 129-137 ◽  
Author(s):  
Vibeke R. Borregaard

In the upgrade of wastewater treatment plants to include biological nutrient removal the space available is often a limiting facor. It may be difficult to use conventional suspended growth processes (i.e. activated sludge) owing to the relatively large surface area required for these processes. Recent years have therefore seen a revived interest in treatment technologies using various types of attached growth processes. The “new” attached growth processes, like the Biostyr process, utilise various kinds of manufactured media, e.g. polystyrene granules, which offer a high specific surface area, and are therefore very compact. The Biostyr plants allow a combination of nitrification-denitrification and filtration in one and the same unit. The results obtained are 8 mg total N/l and an SS content normally below 10 mg/l. The plants in Denmark which have been extended with a Biostyr unit have various levels of PLC control and on-line instrumentation.


2013 ◽  
Vol 67 (7) ◽  
pp. 1481-1489 ◽  
Author(s):  
R. Barat ◽  
J. Serralta ◽  
M. V. Ruano ◽  
E. Jiménez ◽  
J. Ribes ◽  
...  

This paper presents the plant-wide model Biological Nutrient Removal Model No. 2 (BNRM2). Since nitrite was not considered in the BNRM1, and this previous model also failed to accurately simulate the anaerobic digestion because precipitation processes were not considered, an extension of BNRM1 has been developed. This extension comprises all the components and processes required to simulate nitrogen removal via nitrite and the formation of the solids most likely to precipitate in anaerobic digesters. The solids considered in BNRM2 are: struvite, amorphous calcium phosphate, hidroxyapatite, newberite, vivianite, strengite, variscite, and calcium carbonate. With regard to nitrogen removal via nitrite, apart from nitrite oxidizing bacteria two groups of ammonium oxidizing organisms (AOO) have been considered since different sets of kinetic parameters have been reported for the AOO present in activated sludge systems and SHARON (Single reactor system for High activity Ammonium Removal Over Nitrite) reactors. Due to the new processes considered, BNRM2 allows an accurate prediction of wastewater treatment plant performance in wider environmental and operating conditions.


2002 ◽  
Vol 45 (6) ◽  
pp. 209-218 ◽  
Author(s):  
J. Makinia ◽  
M. Swinarski ◽  
E. Dobiegala

Mathematical modelling and computer simulation have became a useful tool in evaluating the operation of wastewater treatment plants (WWTPs) in terms of nutrient removal capability. In this study, steady-state simulation results for two large biological nutrient removal WWTPs are presented. The plants are located in two neighbouring cities Gdansk and Gdynia in northern Poland. Simulations were performed using a pre-compiled model and layouts (MUCT and Johannesburg processes) implemented in the GPS-X simulation package. The monthly average values of conventional parameters, such as COD, Total Suspended Solids, total N, N-NH4+, P-PO4− were used as input data. The measured effluent concentrations of COD, N-NH4+, N-NO3− and P-PO4− as well as reactor MLSS were compared with model predictions. During calibration, performed from the process engineering perspective, default values of only five model parameters were changed. The opportunities for further applications of such models in municipal WWTPs are discussed.


2004 ◽  
Vol 49 (5-6) ◽  
pp. 39-46 ◽  
Author(s):  
K.-I. Gil ◽  
E. Choi

The recycle water from sludge processing in municipal wastewater treatment plants causes many serious problems in the efficiency and stability of the mainstream process. Thus, the design approach for recycle water is an important part of any biological nutrient removal system design when a retrofit technology is required for upgrading an existing plant. Moreover, the application of nitrogen removal from recycle water using the nitritation process has recently increased due to economic reasons associated with an effective carbon allocation as well as the minimization of aeration costs. However, for the actual application of recycle water nitritation, it has not been fully examined whether or not additional volume would be required in an existing plant. In this paper, the addition of recycle water nitritation to an existing plant was evaluated based on a volume analysis and estimation of final effluent quality. It was expected that using the reserve volume of the aeration tank in existing plants, recycle water nitritation could be applied to a plant without any enlargement. With the addition of recycle water nitritation, it was estimated that the final effluent quality would be improved and stabilized, especially in the winter season.


2001 ◽  
Vol 44 (1) ◽  
pp. 105-112 ◽  
Author(s):  
M. Burde ◽  
F. Rolf ◽  
F. Grabowski

The absence of large rivers with rather high niveau of self purifying effect in parts of east Germany leads to a discharging of the effluent of wastewater treatment plants into the groundwater in many cases. One useful consequence is the idea of realisation of decentralised measures and concepts in urban water resources management concerning municipal wastewater as well as rainfall, precipitation. At the same time, only the upper soil zone - a few decimetres - is water - saturated and thus discharge effective, even when extreme rainfall takes place. Underneath, however, there generally exists an unsaturated soil zone, which is up to now a rather unexplored retardation element of the hydrologic- and substrate-cycle. Nutrient removal in small wastewater treatment plants that are emptying into ground waters is often beneficial. The presented studies optimised an inexpensive method of subsequent enhanced wastewater treatment. The developed reactor is similar to a concentrated subsoil passage. The fixed bed reactor is divided in two sections to achieve aerobic and anoxic conditions for nitrification/denitrification processes. To enhance phosphorus removal, ferrous particles are put into the aerobic zone. Two series of column tests were carried out and a technical pilot plant was built to verify the efficiency of the process. The results show that this method can be implemented successfully.


Sign in / Sign up

Export Citation Format

Share Document