Experiences with computer simulation at two large wastewater treatment plants in northern Poland

2002 ◽  
Vol 45 (6) ◽  
pp. 209-218 ◽  
Author(s):  
J. Makinia ◽  
M. Swinarski ◽  
E. Dobiegala

Mathematical modelling and computer simulation have became a useful tool in evaluating the operation of wastewater treatment plants (WWTPs) in terms of nutrient removal capability. In this study, steady-state simulation results for two large biological nutrient removal WWTPs are presented. The plants are located in two neighbouring cities Gdansk and Gdynia in northern Poland. Simulations were performed using a pre-compiled model and layouts (MUCT and Johannesburg processes) implemented in the GPS-X simulation package. The monthly average values of conventional parameters, such as COD, Total Suspended Solids, total N, N-NH4+, P-PO4− were used as input data. The measured effluent concentrations of COD, N-NH4+, N-NO3− and P-PO4− as well as reactor MLSS were compared with model predictions. During calibration, performed from the process engineering perspective, default values of only five model parameters were changed. The opportunities for further applications of such models in municipal WWTPs are discussed.

1997 ◽  
Vol 36 (1) ◽  
pp. 129-137 ◽  
Author(s):  
Vibeke R. Borregaard

In the upgrade of wastewater treatment plants to include biological nutrient removal the space available is often a limiting facor. It may be difficult to use conventional suspended growth processes (i.e. activated sludge) owing to the relatively large surface area required for these processes. Recent years have therefore seen a revived interest in treatment technologies using various types of attached growth processes. The “new” attached growth processes, like the Biostyr process, utilise various kinds of manufactured media, e.g. polystyrene granules, which offer a high specific surface area, and are therefore very compact. The Biostyr plants allow a combination of nitrification-denitrification and filtration in one and the same unit. The results obtained are 8 mg total N/l and an SS content normally below 10 mg/l. The plants in Denmark which have been extended with a Biostyr unit have various levels of PLC control and on-line instrumentation.


2019 ◽  
Vol 79 (11) ◽  
pp. 2211-2220 ◽  
Author(s):  
M. Maktabifard ◽  
E. Zaborowska ◽  
J. Makinia

Abstract Nowadays, low greenhouse gas (GHG) emission is expected at wastewater treatment plants (WWTPs). However, emission quantification and evaluation still faces difficulties related to data availability and uncertainty. The objective of this study was to perform carbon footprint (CF) analysis for two municipal WWTPs located in northern Poland. Slupsk WWTP is a large biological nutrient removal (BNR) facility (250,000 PE) which benefits from on-site electricity production from biogas. The other studied plant is a medium-size BNR facility in Starogard (60,000 PE). In this WWTP, all the required electricity was provided from the grid. Both wastewater systems were composed of activated sludge, with differences in the nutrient removal efficiency and sludge treatment line. The CF calculations were based on empirical models considering various categories of input parameters, afterwards summing up the emissions expressed in CO2 equivalents (CO2e). After sensitivity analysis, significant contributors to GHG emissions were identified. The total specific CF of the Slupsk and the Starogard WWTP was 17.3 and 38.8 CO2e per population equivalent (PE), respectively. In both cases, sludge management, electricity consumption and direct emissions from wastewater treatment were found to significantly influence the CF. A substantial share of the total CF originated from indirect emissions, primarily caused by the energy consumption. This negative impact can be partially overcome by increasing the share of renewable energy sources. Reduction of over 30% in the total CF could be achieved while applying energy recovery from biogas by combined heat and power plants. Farmland and farmland after composting were found to be the most appropriate strategies for sludge management. They could create a CF credit (8% of the total CF) as a result of substituting a synthetic fertilizer. Reliable full-scale measurements of N2O emissions from wastewater treatment are recommended due to high uncertainty in CF estimation based on fixed emission factors (EFs). While applying the lowest and the highest N2O EFs reported in the literature, the total CF would change even by 2–3 times.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 53-60 ◽  
Author(s):  
B. Rabinowitz ◽  
T. D. Vassos ◽  
R. N. Dawson ◽  
W. K. Oldham

A brief review of recent developments in biological nitrogen and phosphorus removal technology is presented. Guidelines are outlined of how current understanding of these two removal mechanisms can be applied in the upgrading of existing wastewater treatment plants for biological nutrient removal. A case history dealing with the upgrading of the conventional activated sludge process located at Penticton, British Columbia, to a biological nutrient removal facility with a design flow of 18,200 m3/day (4.0 IMGD) is presented as a design example. Process components requiring major modification were the headworks, bioreactors and sludge handling facilities.


2013 ◽  
Vol 67 (7) ◽  
pp. 1481-1489 ◽  
Author(s):  
R. Barat ◽  
J. Serralta ◽  
M. V. Ruano ◽  
E. Jiménez ◽  
J. Ribes ◽  
...  

This paper presents the plant-wide model Biological Nutrient Removal Model No. 2 (BNRM2). Since nitrite was not considered in the BNRM1, and this previous model also failed to accurately simulate the anaerobic digestion because precipitation processes were not considered, an extension of BNRM1 has been developed. This extension comprises all the components and processes required to simulate nitrogen removal via nitrite and the formation of the solids most likely to precipitate in anaerobic digesters. The solids considered in BNRM2 are: struvite, amorphous calcium phosphate, hidroxyapatite, newberite, vivianite, strengite, variscite, and calcium carbonate. With regard to nitrogen removal via nitrite, apart from nitrite oxidizing bacteria two groups of ammonium oxidizing organisms (AOO) have been considered since different sets of kinetic parameters have been reported for the AOO present in activated sludge systems and SHARON (Single reactor system for High activity Ammonium Removal Over Nitrite) reactors. Due to the new processes considered, BNRM2 allows an accurate prediction of wastewater treatment plant performance in wider environmental and operating conditions.


2004 ◽  
Vol 50 (6) ◽  
pp. 69-70 ◽  
Author(s):  
A. Seco ◽  
J. Ribes ◽  
J. Serralta ◽  
J. Ferrer

This paper presents the results of the work carried out by the CALAGUA Group on Mathematical Modelling of Biological Treatment Processes: the Biological Nutrient Removal Model No.1. This model is based on a new concept for dynamic simulation of wastewater treatment plants: a unique model can be used to design, simulate and optimize the whole plant, as it includes most of the biological and physico-chemical processes taking place in all treatment operations. The physical processes included are: settling and clarification processes (flocculated settling, hindered settling and thickening), volatile fatty acids elutriation and gasÐliquid transfer. The chemical interactions included comprise acidÐbase processes, where equilibrium conditions are assumed. The biological processes included are: organic matter, nitrogen and phosphorus removal; acidogenesis, acetogenesis and methanogenesis. Environmental conditions in each operation unit (aerobic, anoxic or anaerobic) will determine which bacterial groups can grow. Thus, only the model parameters related to bacterial groups able to grow in any of the operation units of a specific WWTP will require calibration. One of the most important advantages of this model is that no additional analysis with respect to ASM2d is required for wastewater characterization. Some applications of this model have also been briefly explained in this paper.


2003 ◽  
Vol 47 (11) ◽  
pp. 101-107 ◽  
Author(s):  
I.D.R. Mackinnon ◽  
K. Barr ◽  
E. Miller ◽  
S. Hunter ◽  
T. Pinel

Return side streams from anaerobic digesters and dewatering facilities at wastewater treatment plants (WWTPs) contribute a significant proportion of the total nitrogen load on a mainstream process. Similarly, significant phosphate loads are also recirculated in biological nutrient removal (BNR) wastewater treatment plants. Ion exchange using a new material, known by the name MesoLite, shows strong potential for the removal of ammonia from these side streams and an opportunity to concurrently reduce phosphate levels. A pilot plant was designed and operated for several months on an ammonia rich centrate from a dewatering centrifuge at the Oxley Creek WWTP, Brisbane, Australia. The system operated with a detention time in the order of one hour and was operated for between 12 and 24 hours prior to regeneration with a sodium rich solution. The same pilot plant was used to demonstrate removal of phosphate from an abattoir wastewater stream at similar flow rates. Using MesoLite materials, >90% reduction of ammonia was achieved in the centrate side stream. A full-scale process would reduce the total nitrogen load at the Oxley Creek WWTP by at least 18%. This reduction in nitrogen load consequently improves the TKN/COD ratio of the influent and enhances the nitrogen removal performance of the biological nutrient removal process.


2011 ◽  
Vol 13 (4) ◽  
pp. 575-595 ◽  
Author(s):  
Giorgio Mannina ◽  
Alida Cosenza ◽  
Peter A. Vanrolleghem ◽  
Gaspare Viviani

Activated sludge models can be very useful for designing and managing wastewater treatment plants (WWTPs). However, as with every model, they need to be calibrated for correct and reliable application. Activated sludge model calibration is still a crucial point that needs appropriate guidance. Indeed, although calibration protocols have been developed, the model calibration still represents the main bottleneck to modelling. This paper presents a procedure for the calibration of an activated sludge model based on a comprehensive sensitivity analysis and a novel step-wise Monte Carlo-based calibration of the subset of influential parameters. In the proposed procedure the complex calibration issue is tackled both by making a prior screening of the most influential model parameters and by simplifying the problem of finding the optimal parameter set by splitting the estimation task into steps. The key point of the proposed step-wise procedure is that calibration is undertaken for sub-groups of variables instead of solving a complex multi-objective function. Moreover, even with this step-wise approach parameter identifiability issues may occur, but this is dealt with by using the general likelihood uncertainty estimation (GLUE) method, that so far has rarely been used in the field of wastewater modelling. An example from a real case study illustrates the effectiveness of the proposed methodology. Particularly, a model was built for the simulation of the nutrient removal in a Bardenpho scheme plant. The model was successfully and efficiently calibrated to a large WWTP in Sicily.


2006 ◽  
Vol 2006 (2) ◽  
pp. 591-607
Author(s):  
Grzegorz Bujoczek ◽  
Jan A. Oleszkiewicz ◽  
James L. Barnard ◽  
Patrick Coleman ◽  
Kenneth Abraham

Sign in / Sign up

Export Citation Format

Share Document