scholarly journals Adaptation of migratory Tibetan antelope to infrastructure development

Author(s):  
Tong Wu ◽  
Xinming Lian ◽  
Hongqi Li ◽  
Dong Wang ◽  
Jiaping Chen ◽  
...  
2019 ◽  
pp. 134-157 ◽  
Author(s):  
G. A. Borshchevskiy

The article examines the institutional process in a regional economy connected with the infrastructure development. We use the neoinstitutional approach to study factors that influence the behavior of government and business in their interaction in the economy. We also use statistical methods to analyze the dynamics of socio-economic development indicators of the subjects of the Russian Federation as well as the results of measures to attract private investment into infrastructure, including the PPP. We chose the city of Moscow and the Yamalo-Nenets Autonomous District as two empirical case studies which differ in economic and geographic conditions, but both demonstrate success in attracting private investment and implementing infrastructure projects. Our conclusions are consistent with a theory that asserts the primacy of institutional environment in relation to project implementation. We make also some practical recommendations for the development of the institutional environment which are acceptable for all regions solving similar problems of infrastructure development.


2020 ◽  
Vol 1 (1) ◽  
pp. 45-60
Author(s):  
Lina Kumala Dewi ◽  
Bambang Triono ◽  
Dian Suluh Kusuma Dewi

The construction of public participation has paid his dues. This is that in realizing development projects readily undergoing a failure that empowers people. Related in all process that deals with planning, implementation, the use of results and development monitoring. The rural infrastructure development program (PPIP) is development programs community empowerment. Where people have got to dive headlong in village development, especially physical development he purposes of this research is to find how the participation of the community in the Rural infrastructure development program (PPIP), Ngranget Village, Dagangan District, Madiun Regency. The kind of research is qualitative descriptive. In research, this is the population is the number of household heads involved in the delivery rabat concrete development in Ngranget village which consisted of 95 KK. The majority of informants interviewed in this research was 12 people. Was used in the study data collection method that is Technical Documentation interviews and data available for analysis namely described the results of research or data with a form of what is he got writer whether it is the results of the interviews, or result in appreciating documentation then investigated and the studies of the issue and. The result that the community participation in development in the village of rabat concrete Ngranget mind (planning), low participation in the form of energy high, participation in the form of expertise, quite low in the form of goods low, the form of money and participation is very low.


2019 ◽  
Vol 2 (2) ◽  
pp. 161
Author(s):  
Wisudanto Mas Suroto ◽  
Bagus Mohamad Ramadhan ◽  
Tika Widiastuti ◽  
Irfan Andi ◽  
Muhammad Ubaidillah Al Mustofa

The main principle of the strategy for the complex improvement of the functioning of northern cities in winter, including their infrastructure development, is a comprehensive solution of the problem of industrial-scale snow-mass collection, removal and utilization at different areas of urban roadway networks. For its implementation in the capital of Russia, “MosvodokanalNIIproject” JSC developed in 2002 the Snow Removal Master Plan for the city of Moscow. The meteorological conditions in the city, which have changed considerably in the recent years, including the changes in the snow-cover depth and in the road-surface areas to be cleaned, as well as emerging of new technologies for the cleaning of urban streets, yards and sidewalks and some new types of deicing agents, resulted in the necessity to update the above-mentioned Snow Removal Master Plan developed for the city of Moscow. Efficient application of deicing agents is of special importance for its updating in the context of the environmental safety of the city in a winter period. The article considers the results of the implementation of the updated Snow Removal Master Plan and contains some proposals concerning snow removal under the conditions of extreme snowfalls.


2019 ◽  
Vol 15 (2) ◽  
pp. 125-135
Author(s):  
Tatiana S. Minaeva ◽  
Sergey S. Gulyaev

Introduction. The organization of transport links and the bridge building in cities located on the banks of wide rivers has always been one of the most important tasks of the local administration. The study of the history of bridge building allows not only to trace the process of modernization of different regions of the country, but also to help in solving similar problems of our time. Nevertheless, the history of Russian bridge building is poorly studied. The purpose of the article is to determine the characteristics and features of the organization of bridge building in big cities of the European North of Russia as a way to solve one of the problems of urban infrastructure in the early XX century. Materials and Methods. The sources for this study are the documents of the State archive of the Arkhangelsk region, published documents on the history of Vologda, articles in the local periodicals of the early XX century. The analysis of the studied problem used a systematic approach, the method of economic analysis, historical and historical-comparative methods. Results and Discussion. The building of permanent bridges was a need for the development of Arkhangelsk and Vologda. In Vologda the two wooden bridges were built in the middle of XIX century on city funds and in the future these bridges were repaired or rebuilt. The Arkhangelsk city authorities did not hurry to solve a problem of city infrastructure by own efforts and a long time they used the floating bridge. The lack of experience in the building of large bridges and the desire to save money led to the rapid destruction of the first permanent bridge in Arkhangelsk. Conclusion. The Development of trade and industry in cities of the European North of Russia, such as Arkhangelsk and Vologda, led to the expansion of their territory and the emergence over time, the so-called third parts of the cities. Despite the comparable size of the population of the districts located across the river, the process of connecting them with bridges to the rest of the city went at different rates, which depended on the attitude of the local administration to the problem of urban infrastructure.


2015 ◽  
Vol 3 (2) ◽  
pp. 55
Author(s):  
Norol Hamiza Zamzuri ◽  
Khairil Wahidin Awang ◽  
Yuhanis Abdul Aziz ◽  
Zaiton Samdin

The growth of the event sector is underpinned by the demand of organizing a business event.  Thus, it leads to an increase in economic and social impact. However, the problems from the growth of this sector potentially results from the use of several event materials, transportation and infrastructure development.  Organizing a green event is seen as one of the strategies to reduce the environmental impact.  Therefore, the aim of this paper is to explore the issues involved throughout the process of greening an event by applying Mair and Jago Model.  Semi-structured interviews were conducted with event managers from six Malaysia business event companies that encourage green practices during their event.  Findings suggest that impact, initiative, support and performance motivates event organizers in organizing a green event.  It has also been found that knowledge, resources and behaviour are the barriers faced by event organizers throughout the process of organizing a green event.  Based on the findings it appears that two important factors have emerged from the data collection and analysis that showed a deviation from the Mair and Jago Model, namely “impact” for the motivation element and “support” for the barrier element.  The main limitation of this study was the scope of the study; as it only focuses on business events.  However, as the main purpose of this study is to explore the issues of organizing a green event, it has been found that there are other issues need to be explored in other contexts and geographical area.  Apart from this, as this is a case study, it can only replicate according to the circumstances of this case study. However, this study can be generalized in terms of the theory that has emerged from it.  It is suggested that further research should explore more issues in other contexts and geographical areas. 


2012 ◽  
Vol 1 (1) ◽  
pp. 51-56
Author(s):  
Katarzyna Pukowiec

Abstract The activities in name of tourist development in Wodzislaw poviat are the reason to evaluate the tourist land development. The evaluation was prepared on the basis of selected indexes characterizing the level of tourist infrastructure development. It considered: the number of lodgings per km2, the number of restaurants per km2, the amount of additional attractions per km2 and the density of tourist tracks. This database was analyzed by the use of GIS tools. Using GIS software allowed working with large databases and provided the possibility to create a graphic representation of the results. The level of tourist land development is diversified and depends on it function. The cities with the best developed tourist infrastructure are Wodzislaw Slaski, Radlin, Pszow, Rydultowy and town in Odra Valley: Olza, Bukow and Nieboczowy. Pszow, Gorzyce and Godow commons have the biggest density of tourist tracks.


2020 ◽  
Vol 26 (7) ◽  
pp. 1469-1495
Author(s):  
A.L. Sabinina ◽  
V.V. Sokolovskii ◽  
N.A. Shul'zhenko ◽  
N.A. Sychova

Subject. The article describes the findings of the authors of fundamental strategic decisions on the formation of multifunctional urban complexes, using the housing demand and supply criterion. Objectives. We undertake a comprehensive study aimed at perfecting the methodology for evaluating the options for city infrastructure development at two stages, i.e. strategic, when general targets of feasible commissioning are determined, and current, when parameters of demand for facilities are taken into account. Methods. The study employs methods of expert survey, statistical data processing, predictive and investigative analysis. Results. We explored factors of creating amenities and comfort in residential construction areas, developed an algorithm to calculate the volume of new living space commissioning on the basis of evaluating demands in the Smart City paradigm. Conclusions. The study shows the cost increase depending on the built-up area, number of floors, and the balance between the type of capacity and the number of residents in the quarter (linear relationship).


2020 ◽  
Vol 18 (4) ◽  
pp. 765-779
Author(s):  
E.V. Popov ◽  
K.A. Semyachkov ◽  
K.V. Zhunusova

Subject. This article explores the basic elements of the engineering infrastructure of smart cities. Objectives. The article aims to systematize theoretical descriptions of the engineering infrastructure of a smart city. Methods. For the study, we used a logical analysis and systematization. Results. The article highlights the main areas of infrastructure development of smart cities. Conclusions. Improving process management mechanisms, optimizing urban infrastructure, increasing the use of digital technologies, and developing socio-economic innovation improve the quality of the urban environment in a digitalized environment. And improving the efficiency of urban planning and security, studying its properties and characteristics, and forming an effective urban information system lead to its functional transformations.


Sign in / Sign up

Export Citation Format

Share Document