Development of risk factors taxonomy in ramp operations for corporate sustainability

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ebru Yazgan ◽  
Vildan Durmaz ◽  
Ayse Kucuk Yilmaz

Purpose This research has the potential to contribute to the understanding of the sustainable ground handling operations framework. Ramp operations as the main system of ground handling include critical services for aircraft/airlines. The purpose of this study is to identify the risk factors in ramp operations for all related stakeholders’ awareness to enhance flight safety. Classifying risk factors, the four main performance fields under risk taxonomy is determined. Thus, managers may allocate resources effectively to handle related threats for corporate sustainability. Design/methodology/approach New taxonomy with human performance value indicators, which sources from the environment is developed. New developed taxonomy is entitled as “environmental value approach,” which represents environmental value-based approach. The developed new risk factors taxonomy is divided into groups such as ramp personnel, organizational, sustainability-based risk factors: triple view and ergonomics obtained from an extensive literature review and experts’ opinions in the field of human performance. Findings The findings of this research show that managers need a risk management-oriented approach to manage the human factor affecting performance and sustainability. The newly developed taxonomy offers not only identifying the sources of unsafe operational risk factors but also using as a decision-support tool to manage risks for achieving their sustainability goals. When managerial decisions are made according to risk taxonomy and managing these risks, then corporate performance and individual performance may improve. Originality/value The new taxonomy presents the performance-based management of the human factor with a holistic and systematic risk management-based approach. There is no risk taxonomy study designed considering ramp operations and sustainability-based human factor performance.

2018 ◽  
Vol 90 (6) ◽  
pp. 1012-1022 ◽  
Author(s):  
Ebru Yazgan

PurposeContemporary management and strategy mean optimization of ingredient factors such as human factors, systems, operations and equipment. With system approach in management and strategy, human risk factor as input has considerable potential to change results as airworthiness in aviation management. The managers of aviation business also optimize their functions to act safe while making contribution to development in triple of sustainability as economic development and its sustainability; social development and its sustainability; and environmental development and its sustainability. Corporate sustainability can be accomplished via supporting workforce which is the human risk factor. To support (empowerment) workforce, researchers should identify human risk or error factors which are important to this research. The purpose of this study is to suggest holistic framework for working environment system of aircraft maintenance technicians (AMTs) within two respects such as human performance (ergonomics) and corporate performance (sustainability). The secondary purpose of this system is to develop human risk taxonomy by determining the factors affecting both human and work by taking ergonomic aspects in aviation.Design/methodology/approachIn this study, a taxonomy of human risk factors for AMTs is developed. These human factors divided into groups and subfactors are obtained from an extensive literature review and experts’ opinions in the field of human performance in aviation. Taxonomy developed will be useful to both sharing and using corporate sources in sustainable way.FindingsHuman risk factors can be considered or accepted as factors that cause human error. This may result in the optimum way to managing human risk factor via minimizing human-based error. Personality, hazardous attitudes, individual characteristics, physical/psychological condition of AMTs and corporate social responsibility factors are human-related risk variables in this study. The risks and error can be reduced by recognizing these factors and revealing their relation to ergonomic design.Originality/valueThe results of this study are intended to constitute a guide for managers to manage risk factors and to take corrective and preventive actions for their maintenance operations. It is believed that this study is highly important for the aviation sector in terms of raising awareness or providing awareness for similar practices. As taxonomy of the risk factors contributes to the managing human error, corrective actions related to these factors must be taken by managers.


Kybernetes ◽  
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Yu Zhang ◽  
Lan Xu

PurposeThis study establishes a risk management system for medical and health care integration projects to address the problem of high-risk potential and a strong correlation between risk factors.Design/methodology/approachA new fuzzy WINGS-G1 model for identifying key risk factors in medical and health care integration projects is proposed by introducing the fuzzy theory and the concept of risk incidence into the Weighted Influence Non-linear Gauge System (WINGS) method.FindingsThe authors analyze the fluidity of project risk factors through complex networks to control direct risks and cut off risk transmission paths to provide a reference for risk control and prevention of medical and health care integration projects.Originality/value(1) The integration of fuzzy theory into the WINGS method solves the problem of strong subjectivity of expert scoring in the traditional WINGS method; (2) By the different probabilities of risk factors, the concept of risk incidence is introduced in the WINGS model, which is more conducive to the identification of the critical risk factors and the rational allocation and utilization of organizational resources; (3) The use of the complex network for risk interactivity analysis fully reflects the dynamic nature of risk factors in medical and health care integration projects.


2020 ◽  
Vol 58 (7) ◽  
pp. 1449-1474 ◽  
Author(s):  
Hamidreza Panjehfouladgaran ◽  
Stanley Frederick W.T. Lim

PurposeReverse logistics (RL), an inseparable aspect of supply chain management, returns used products to recovery processes with the aim of reducing waste generation. Enterprises, however, seem reluctant to apply RL due to various types of risks which are perceived as posing an economic threat to businesses. This paper draws on a synthesis of supply chain and risk management literature to identify and cluster RL risk factors and to recommend risk mitigation strategies for reducing the negative impact of risks on RL implementation.Design/methodology/approachThe authors identify and cluster risk factors in RL by using risk management theory. Experts in RL and supply chain risk management validated the risk factors via a questionnaire. An unsupervised data mining method, self-organising map, is utilised to cluster RL risk factors into homogeneous categories.FindingsA total of 41 risk factors in the context of RL were identified and clustered into three different groups: strategic, tactical and operational. Risk mitigation strategies are recommended to mitigate the RL risk factors by drawing on supply chain risk management approaches.Originality/valueThis paper studies risks in RL and recommends risk management strategies to control and mitigate risk factors to implement RL successfully.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Marc Wiedenmann ◽  
Andreas Größler

PurposeManaging supply risk is gaining in importance in the tightly interconnected global economy. Identifying the relevant risks is the foundation of any risk management process. Therefore, the purpose of this paper first is to provide a short introduction to supply risk management, before focussing on the identification of such risks in more detail. A holistic framework of the identified supply risks, which distinguishes between risk dimensions and risk factors in manufacturing upstream supply networks, is proposed.Design/methodology/approachThis study applies a mixed methods research approach. Data are collected based on a structured literature review in combination with the analysis of company-specific documents and semi-structured expert interviews. Subsequently, a deductive content analysis is carried out to derive a holistic framework of supply risks, adapted to the manufacturing industry. For the external validation of the conceptual supply risk framework, additional experts from several manufacturing companies were consulted.FindingsBased on the definition and delimitation of supply risk, a categorization of supply risks is developed. The relevant literature, as well as expert interviews, lead to the distinction of six supply risk dimensions: quality, delivery, collaboration, economic, ambience and compliance. A total of 27 risk factors can be assigned to these dimensions. A holistic foundation for the management of supply risk is thus created.Originality/valueThis study provides a holistic framework of relevant supply risks in the context of the manufacturing industry. This overview of identified risks offers a novel perspective on risk in manufacturing supply networks that can be helpful in researching assessment and mitigation strategies. Despite the high relevance and popularity of this field of research, such an overview with a focus on manufacturing had not yet been made available in the literature. Building thereon, management approaches can now be developed to handle the risk arising from the upstream of the supply network.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tao Wang ◽  
Shangde Gao ◽  
Pinchao Liao ◽  
Tsenguun Ganbat ◽  
Junhua Chen

Purpose The purpose of this paper is to construct a two-stage risk management framework for international construction projects based on the meta-network analysis (MNA) approach. A plethora of international construction studies seems to assume risks as independent and therefore, risk intervention strategies are usually critiqued as ineffective. Design/methodology/approach In the risk assessment stage, a multi-tiered risk network structure was developed with the project objectives, risk events, risk factors and stakeholders, and critical risk factors were selected based on a series of calculations. In the risk intervention stage, targeted risk intervention strategies were proposed for stakeholders based on the results of the first stage. A highway construction project in Eastern Europe was selected as a case study. Findings The results showed that 17 risk factors in three categories – external, stakeholder-related and internal – are critical, and the project manager, construction management department, supplier and contract department are the most critical stakeholders that affect the entire project performance. Based on the critical risk factors and project stakeholders, targeted risk intervention strategies were proposed. The risk assessment results of MNA were found to be more reliable and consistent with the project conditions than the risk matrix method; the risk intervention strategies of MNA can effectively address project objectives. Originality/value This study modeled risk priorities based on risk associations and put forward a new method for risk management, supplementing the body of knowledge of international construction. The results of this study are of critical importance in management practices.


2018 ◽  
Vol 23 (4) ◽  
pp. 336-350 ◽  
Author(s):  
Christian A. Rudolf ◽  
Stefan Spinler

Purpose Large-scale projects are the typical delivery model in the engineering and construction industry, with their very own characteristics. Even though well established, only 1 in 1,000 large-scale projects is successful (Flyvbjerg, 2011). A lack of effective supply chain risk management (SCRM) has repeatedly been identified as one of the main causes. While the SCRM body of knowledge seems increasingly well established, a lack of effective methods meeting the specific requirements of large-scale projects can be observed. Design/methodology/approach This paper presents a structured and prioritized view on the supply chain risk portfolio in this sector: first, the authors identified and categorized the key supply chain risks in the recent literature. Next, the authors surveyed large-scale project managers across multiple industries, mainly coming from the domains of supply chain management and project management. Finally, the authors provide a contextualized risk taxonomy for engineering, procurement and construction (EPC) projects. Findings The identified risk portfolio deviates from generic projects significantly and shows a very high inherent risk exposure of large-scale projects. In particular, behavioral risks are identified as crucial. Additionally, a bias to considerably underestimate risks at project beginning is found. Originality/value The contextualized SCRM taxonomy offers a systematic and structured view on the key supply chain risks in EPC large-scale projects. The identified risks are considerably different in their characteristics compared to generic projects or classical SCRM approaches. The authors thus provide a new perspective on SCRM in this specific setting and complement traditional risk and project risk management techniques.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tahir Ali ◽  
Aurangzeab Butt ◽  
Ahmad Arslan ◽  
Shlomo Yedidia Tarba ◽  
Sniazhana Ana Sniazhko ◽  
...  

PurposeThis study investigates an under-researched yet fundamental question of how a developed country multinational enterprises (DMNE) perceives and manages political risks when undertaking infrastructure projects in the emerging markets (EMs).Design/methodology/approachThe authors use an abduction-based qualitative research approach to analyze six international project operations of a multinational enterprise originating from Finland in five EMs.FindingsThe findings suggest that the overall nature of political risks in EMs is not the same, except few political risk factors that are visible in most EMs. Consequently, the applied risk management mechanisms vary between EMs, except with few common mechanisms. The authors develop an integrative analytical framework of political risk management based on the findings.Originality/valueThis paper is one of the first studies to identify political risk factors for western MNEs while undertaking international project operations and link them to reduction mechanisms used by them. The authors go beyond the notion of risk being conceptualized at a general level and evaluate 20 specific political risk factors referred to in extant literature. The authors further link these political risk factors with both social exchange and transaction cost theories conceptually as well as empirically. Finally, the authors develop a relatively comprehensive analytical framework of political risk management based on the case projects' findings that combine several strands of literature, including the social exchange theory, transaction cost theory, international market entry, project management and finance literature streams.


2019 ◽  
Vol 91 (4) ◽  
pp. 654-668 ◽  
Author(s):  
Ayse Kucuk Yilmaz

Purpose Aviation has multi-cultural business environment in all aspects as operational and management. Managing aviation requires high awareness on human factor risk which includes organizational behavior-related topics. The greatest risk to an enterprise’s ability to achieve its strategic goals and objectives is the human factor. Both organizational behavior and corporate culture behavior with social psychology are the most vital aspects of management and strategy in terms of human resources. Related risks, including organizational behavior and culture, have the potential to directly impact on both business performance and corporate sustainability. Therefore, in this paper, the most prominent risks were determined in accordance with social psychology, and after identification of human factor-based risks, these have prioritized and prepared risk mapping with fresh approach. For this reason, this study aims to develop risk mapping model for human factors that takes into account interrelations among risk factors three dimensional based new approach. This approach includes both identification of human factor based risks, prioritization them and setting risk mapping according to corporate based qualifications via tailoring risk list. Developed risk map in this paper will help to manage corporate risks to achieve improved performance and sustainability. Design/methodology/approach This new organizational behavior- and culture-focused risk mapping model developed in this study has the potential to make significant contribution to the management of the human factor for modern management and strategy. In enterprise risk management system, risk mapping is both strong and effective strategic methodology to manage ergonomics issue with strategic approach. Human factor is both determinative and also strategic element to both continuity and performance of business operations with safely and sound. In view of management and strategy, vitally, the human factor determines the outcome in both every business and every decision-making. Findings It is assumed that, if managers manage human risk you may get advantages to achieving corporate strategies in timely manner. Aviation is sensitive sector for its ingredients: airports, airlines, air traffic management, aircraft maintenance, pilotage and ground handling. Aim of this paper is to present risk management approach to optimize human performance while minimizing both failures and errors by aircraft maintenance technician (AMT). This model may apply all human factors in other departments of aviation such as pilots and traffic controllers. AMT is key component of aircraft maintenance. Thus, errors made by AMTs will cause aircraft accidents or incidents or near miss incidents. In this study, new taxonomy model for human risk factors in aircraft maintenance organizations has been designed, and also new qualitative risk assessment as three dimensions is carried out by considering the factors affecting the AMT’s error obtained from extensive literature review and expert opinions in the field of aviation. Human error risks are first categorized into two main groups and sub three groups and then prioritized using the risk matrix via triple dimension as probability, severity and interrelations ratio between risks. Practical implications Risk mapping is established to decide which risk management option they will apply for managers when they will look at this map. Managers may use risk map to both identify their managerial priorities and share sources to managing risks, and make decisions on risk handling options. This new model may be a useful new tool to manage ergonomic human factor-based risks in developing strategy in aviation business management. In addition, this paper will contribute to department of management and strategy and related literature. Originality/value This study has originality via new modeling of risk matrix. In this study, dimension of risk analysis has been improved as three dimensions. This study has new approach and new assessment of risk with likelihood (probability), impact (severity) and interrelations ratio. This new model may be a useful new tool to both assess and prioritize mapping of ergonomic-based risks in business management. In addition, this research will contribute to aviation management and strategy literature and also enterprise risk management literature.


2020 ◽  
Vol 31 (4) ◽  
pp. 777-799
Author(s):  
Jiwat Ram ◽  
Zeyang Zhang

PurposeBelt and road initiative (BRI) is a transcontinental endeavor strategically connecting supply chains (SCs) and economic infrastructures to ignite business activities and achieve trade benefits. However, the rising global SC failure costs and risks associated with this initiative (owing to unique geopolitical, economic and mega-connectivity involving over 70 countries) necessitate examining BRI SC risks. Yet, research on the subject remains limited, and the purpose of this paper is to address this gap in knowledge.Design/methodology/approachA two-pronged approach was taken. First, a data sample of 554 articles was analyzed and 178 articles found relevant were used to present a systematic, structured framework of risk factors along operational, economic, financial, social and security dimensions. Then informed by the theory of risk management and supplemented by literature evidence, we have built a BRI SC risk model.FindingsThe results presented through the model show that BRI SCs face a combination of risks triggered by operational processes, informational and environmental (PIE) deficiencies. Findings show that lack of risk and liability management, unbalanced risk-sharing partnerships, lack of transparency, inadequate project evaluation, incompatible corporate governance structures and cyber security all pose threats to BRI SCs specifically and SCs in general.Research limitations/implicationsAcademically, the results facilitate theory development by identifying and proposing seven risk factors and modeling relationship among them and BRI SC risks outcome. The results also extend application of theory of risk management to SC context.Practical implicationsThe findings provide a decision-making tool for managers to assess risk factors in their SCs, thus enabling improved decision making to avoid, mitigate, transfer or accept risks.Originality/valueIdentifies and proposes a set of seven risk factors that drive BRI SC risks. Develops a model of BRI SC risks which help build theory of SC risk management.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Liping Ding ◽  
Jiangshan Li ◽  
Yuqing Wang ◽  
Jing Shuai ◽  
Xinxin Xu

Purpose Under the pressure of environment degradation and energy consumption rises, solar photovoltaic power generation (SPPG) has been seen as a strategic emerging industry in China. However, the SPPG projects have many uncertain factors in the process of the life cycle. The purpose of this paper is to evaluate the investment risk comprehensively. Design/methodology/approach Specifically, this paper firstly identified the risk factors and consequences of SPPG project investment and constructed the investment risk factor evaluation index system. Secondly, the factor analysis method was used to reveal the key investment risk factors and risk consequences. Then, the research hypotheses and conceptual model were proposed, and the empirical analysis was conducted based on the structural equation model (SEM). Findings The results showed that the six key risk factors (political, economic, technological, management, market and natural) have a significant impact on the risks during the whole period. The influence degree of risk factors in the operational period is such that market factor > political factor > economic factor > management factor > natural factor > technical factor. In addition, the risk of constructional period has a significant impact during the risk of operational period. Except for natural factors, all risk factors are correlated among the mutual influence relationship of risk factors. Finally, this paper puts forward management implications based on the above conclusions: effectively identify investment risk factors and comprehensively improve risk management ability; (refine the risk factors of SPPG project investment and develop targeted risk prevention and control strategies; define risk management objectives and make relevant strategic plans. Research limitations/implications Because of the chosen research approach, the research results may lack generalisability. Therefore, researchers are encouraged to test the proposed propositions further. Practical implications It can also help stakeholders propose risk prevention strategies throughout the entire process, to promote the sustainable development of SPPG projects. Originality/value This study focuses on the investment risk of SPPG projects, by building an evaluation index system to identify key risk factors, and then establishes a SEM covering constructional period risks and operational period risks to better explore SPPG project risks, in an effort to reveal the mutual influence relationship and influence path of investment risk factors of the projects.