Research on risk management of medical and health care integration projects based on fuzzy WINGS-G1

Kybernetes ◽  
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Yu Zhang ◽  
Lan Xu

PurposeThis study establishes a risk management system for medical and health care integration projects to address the problem of high-risk potential and a strong correlation between risk factors.Design/methodology/approachA new fuzzy WINGS-G1 model for identifying key risk factors in medical and health care integration projects is proposed by introducing the fuzzy theory and the concept of risk incidence into the Weighted Influence Non-linear Gauge System (WINGS) method.FindingsThe authors analyze the fluidity of project risk factors through complex networks to control direct risks and cut off risk transmission paths to provide a reference for risk control and prevention of medical and health care integration projects.Originality/value(1) The integration of fuzzy theory into the WINGS method solves the problem of strong subjectivity of expert scoring in the traditional WINGS method; (2) By the different probabilities of risk factors, the concept of risk incidence is introduced in the WINGS model, which is more conducive to the identification of the critical risk factors and the rational allocation and utilization of organizational resources; (3) The use of the complex network for risk interactivity analysis fully reflects the dynamic nature of risk factors in medical and health care integration projects.

2015 ◽  
Vol 59 (4) ◽  
pp. 1962-1968 ◽  
Author(s):  
Sun Hee Park ◽  
Su-Mi Choi ◽  
Dong-Gun Lee ◽  
Sung-Yeon Cho ◽  
Hyo-Jin Lee ◽  
...  

ABSTRACTExtended-spectrum β-lactamase-producingEscherichia coli(ESBL-EC) is increasingly identified as a cause of acute pyelonephritis (APN) among patients without recent health care contact, i.e., community-associated APN. This case-control study compared 75 cases of community-associated ESBL-EC APN (CA-ESBL) to 225 controls of community-associated non-ESBL-EC APN (CA-non-ESBL) to identify the risk factors for ESBL-EC acquisition and investigate the impact of ESBL on the treatment outcomes of community-associated APN (CA-APN) caused byE. coliat a Korean hospital during 2007 to 2013. The baseline characteristics were similar between the cases and controls; the risk factors for ESBL-EC were age (>55 years), antibiotic use within the previous year, and diabetes with recurrent APN. The severity of illness did not differ between CA-ESBL and CA-non-ESBL (Acute Physiology and Chronic Health Evaluation [APACHE] II scores [mean ± standard deviation], 7.7 ± 5.9 versus 6.4 ± 5.3;P= 0.071). The proportions of clinical (odds ratio [OR], 1.76; 95% confidence interval [CI], 0.57 to 5.38;P= 0.323) and microbiological (OR, 1.16; 95% CI, 0.51 to 2.65;P= 0.730) cures were similar, although the CA-ESBL APN patients were less likely to receive appropriate antibiotics within 48 h. A multivariable Cox proportional hazards analysis of the prognostic factors for CA-APN caused byE. colishowed that ESBL production was not a significant factor for clinical (hazard ratio [HR], 0.39; 95% CI, 0.12 to 1.30;P= 0.126) or microbiological (HR, 0.49; 95% CI, 0.21 to 1.12;P= 0.091) failure. The estimates did not change after incorporating weights calculated using propensity scores for acquiring ESBL-EC. Therefore, ESBL production did not negatively affect treatment outcomes among patients with community-associatedE. coliAPN.


mBio ◽  
2019 ◽  
Vol 10 (6) ◽  
Author(s):  
Natalia Malachowa ◽  
Scott D. Kobayashi ◽  
Adeline R. Porter ◽  
Brett Freedman ◽  
Patrick W. Hanley ◽  
...  

ABSTRACT Klebsiella pneumoniae is a human gut communal organism and notorious opportunistic pathogen. The relative high burden of asymptomatic colonization by K. pneumoniae is often compounded by multidrug resistance—a potential problem for individuals with significant comorbidities or other risk factors for infection. A carbapenem-resistant K. pneumoniae strain classified as multilocus sequence type 258 (ST258) is widespread in the United States and is usually multidrug resistant. Thus, treatment of ST258 infections is often difficult. Inasmuch as new preventive and/or therapeutic measures are needed for treatment of such infections, we developed an ST258 pneumonia model in cynomolgus macaques and tested the ability of an ST258 capsule polysaccharide type 2 (CPS2) vaccine to moderate disease severity. Compared with sham-vaccinated animals, those vaccinated with ST258 CPS2 had significantly less disease as assessed by radiography 24 h after intrabronchial installation of 108 CFU of ST258. All macaques vaccinated with CPS2 ultimately developed ST258-specific antibodies that significantly enhanced serum bactericidal activity and killing of ST258 by macaque neutrophils ex vivo. Consistent with a protective immune response to CPS2, transcripts encoding inflammatory mediators were increased in infected lung tissues obtained from CPS-vaccinated animals compared with control, sham-vaccinated macaques. Taken together, our data provide support for the idea that vaccination with ST258 CPS can be used to prevent or moderate infections caused by ST258. As with studies performed decades earlier, we propose that this prime-boost vaccination approach can be extended to include multiple capsule types. IMPORTANCE Multidrug-resistant bacteria continue to be a major problem worldwide, especially among individuals with significant comorbidities and other risk factors for infection. K. pneumoniae is among the leading causes of health care-associated infections, and the organism is often resistant to multiple classes of antibiotics. A carbapenem-resistant K. pneumoniae strain known as multilocus sequence type 258 (ST258) is the predominant carbapenem-resistant Enterobacteriaceae in the health care setting in the United States. Infections caused by ST258 are often difficult to treat and new prophylactic measures and therapeutic approaches are needed. To that end, we developed a lower respiratory tract infection model in cynomolgus macaques in which to test the ability of ST258 CPS to protect against severe ST258 infection.


2020 ◽  
Vol 58 (7) ◽  
pp. 1449-1474 ◽  
Author(s):  
Hamidreza Panjehfouladgaran ◽  
Stanley Frederick W.T. Lim

PurposeReverse logistics (RL), an inseparable aspect of supply chain management, returns used products to recovery processes with the aim of reducing waste generation. Enterprises, however, seem reluctant to apply RL due to various types of risks which are perceived as posing an economic threat to businesses. This paper draws on a synthesis of supply chain and risk management literature to identify and cluster RL risk factors and to recommend risk mitigation strategies for reducing the negative impact of risks on RL implementation.Design/methodology/approachThe authors identify and cluster risk factors in RL by using risk management theory. Experts in RL and supply chain risk management validated the risk factors via a questionnaire. An unsupervised data mining method, self-organising map, is utilised to cluster RL risk factors into homogeneous categories.FindingsA total of 41 risk factors in the context of RL were identified and clustered into three different groups: strategic, tactical and operational. Risk mitigation strategies are recommended to mitigate the RL risk factors by drawing on supply chain risk management approaches.Originality/valueThis paper studies risks in RL and recommends risk management strategies to control and mitigate risk factors to implement RL successfully.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Marc Wiedenmann ◽  
Andreas Größler

PurposeManaging supply risk is gaining in importance in the tightly interconnected global economy. Identifying the relevant risks is the foundation of any risk management process. Therefore, the purpose of this paper first is to provide a short introduction to supply risk management, before focussing on the identification of such risks in more detail. A holistic framework of the identified supply risks, which distinguishes between risk dimensions and risk factors in manufacturing upstream supply networks, is proposed.Design/methodology/approachThis study applies a mixed methods research approach. Data are collected based on a structured literature review in combination with the analysis of company-specific documents and semi-structured expert interviews. Subsequently, a deductive content analysis is carried out to derive a holistic framework of supply risks, adapted to the manufacturing industry. For the external validation of the conceptual supply risk framework, additional experts from several manufacturing companies were consulted.FindingsBased on the definition and delimitation of supply risk, a categorization of supply risks is developed. The relevant literature, as well as expert interviews, lead to the distinction of six supply risk dimensions: quality, delivery, collaboration, economic, ambience and compliance. A total of 27 risk factors can be assigned to these dimensions. A holistic foundation for the management of supply risk is thus created.Originality/valueThis study provides a holistic framework of relevant supply risks in the context of the manufacturing industry. This overview of identified risks offers a novel perspective on risk in manufacturing supply networks that can be helpful in researching assessment and mitigation strategies. Despite the high relevance and popularity of this field of research, such an overview with a focus on manufacturing had not yet been made available in the literature. Building thereon, management approaches can now be developed to handle the risk arising from the upstream of the supply network.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tao Wang ◽  
Shangde Gao ◽  
Pinchao Liao ◽  
Tsenguun Ganbat ◽  
Junhua Chen

Purpose The purpose of this paper is to construct a two-stage risk management framework for international construction projects based on the meta-network analysis (MNA) approach. A plethora of international construction studies seems to assume risks as independent and therefore, risk intervention strategies are usually critiqued as ineffective. Design/methodology/approach In the risk assessment stage, a multi-tiered risk network structure was developed with the project objectives, risk events, risk factors and stakeholders, and critical risk factors were selected based on a series of calculations. In the risk intervention stage, targeted risk intervention strategies were proposed for stakeholders based on the results of the first stage. A highway construction project in Eastern Europe was selected as a case study. Findings The results showed that 17 risk factors in three categories – external, stakeholder-related and internal – are critical, and the project manager, construction management department, supplier and contract department are the most critical stakeholders that affect the entire project performance. Based on the critical risk factors and project stakeholders, targeted risk intervention strategies were proposed. The risk assessment results of MNA were found to be more reliable and consistent with the project conditions than the risk matrix method; the risk intervention strategies of MNA can effectively address project objectives. Originality/value This study modeled risk priorities based on risk associations and put forward a new method for risk management, supplementing the body of knowledge of international construction. The results of this study are of critical importance in management practices.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tahir Ali ◽  
Aurangzeab Butt ◽  
Ahmad Arslan ◽  
Shlomo Yedidia Tarba ◽  
Sniazhana Ana Sniazhko ◽  
...  

PurposeThis study investigates an under-researched yet fundamental question of how a developed country multinational enterprises (DMNE) perceives and manages political risks when undertaking infrastructure projects in the emerging markets (EMs).Design/methodology/approachThe authors use an abduction-based qualitative research approach to analyze six international project operations of a multinational enterprise originating from Finland in five EMs.FindingsThe findings suggest that the overall nature of political risks in EMs is not the same, except few political risk factors that are visible in most EMs. Consequently, the applied risk management mechanisms vary between EMs, except with few common mechanisms. The authors develop an integrative analytical framework of political risk management based on the findings.Originality/valueThis paper is one of the first studies to identify political risk factors for western MNEs while undertaking international project operations and link them to reduction mechanisms used by them. The authors go beyond the notion of risk being conceptualized at a general level and evaluate 20 specific political risk factors referred to in extant literature. The authors further link these political risk factors with both social exchange and transaction cost theories conceptually as well as empirically. Finally, the authors develop a relatively comprehensive analytical framework of political risk management based on the case projects' findings that combine several strands of literature, including the social exchange theory, transaction cost theory, international market entry, project management and finance literature streams.


2020 ◽  
Vol 16 (4) ◽  
pp. 549-555
Author(s):  
Irvine Lapsley

Purpose The purpose of this paper is to study the pandemic from the perspective of the UK health-care system and risk management. Design/methodology/approach This paper follows a storytelling perspective. The author reflects on his experiences through the lens of research on health care and risk management. Findings The impact of the pandemic has been so massive that it has challenged the capacity of the UKs National Health Service. The political influences at work have not always promoted best practice in risk management and indicate blame-avoidance strategies by politicians. Research limitations/implications A single country experience of COVID-19. Practical implications There are major issues of asset management, of delays in decision-making, of supply chain problems and the need to reform processes of handling of crisis management. Originality/value This is an individual account of experiences of the pandemic.


2020 ◽  
Vol 31 (4) ◽  
pp. 777-799
Author(s):  
Jiwat Ram ◽  
Zeyang Zhang

PurposeBelt and road initiative (BRI) is a transcontinental endeavor strategically connecting supply chains (SCs) and economic infrastructures to ignite business activities and achieve trade benefits. However, the rising global SC failure costs and risks associated with this initiative (owing to unique geopolitical, economic and mega-connectivity involving over 70 countries) necessitate examining BRI SC risks. Yet, research on the subject remains limited, and the purpose of this paper is to address this gap in knowledge.Design/methodology/approachA two-pronged approach was taken. First, a data sample of 554 articles was analyzed and 178 articles found relevant were used to present a systematic, structured framework of risk factors along operational, economic, financial, social and security dimensions. Then informed by the theory of risk management and supplemented by literature evidence, we have built a BRI SC risk model.FindingsThe results presented through the model show that BRI SCs face a combination of risks triggered by operational processes, informational and environmental (PIE) deficiencies. Findings show that lack of risk and liability management, unbalanced risk-sharing partnerships, lack of transparency, inadequate project evaluation, incompatible corporate governance structures and cyber security all pose threats to BRI SCs specifically and SCs in general.Research limitations/implicationsAcademically, the results facilitate theory development by identifying and proposing seven risk factors and modeling relationship among them and BRI SC risks outcome. The results also extend application of theory of risk management to SC context.Practical implicationsThe findings provide a decision-making tool for managers to assess risk factors in their SCs, thus enabling improved decision making to avoid, mitigate, transfer or accept risks.Originality/valueIdentifies and proposes a set of seven risk factors that drive BRI SC risks. Develops a model of BRI SC risks which help build theory of SC risk management.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Liping Ding ◽  
Jiangshan Li ◽  
Yuqing Wang ◽  
Jing Shuai ◽  
Xinxin Xu

Purpose Under the pressure of environment degradation and energy consumption rises, solar photovoltaic power generation (SPPG) has been seen as a strategic emerging industry in China. However, the SPPG projects have many uncertain factors in the process of the life cycle. The purpose of this paper is to evaluate the investment risk comprehensively. Design/methodology/approach Specifically, this paper firstly identified the risk factors and consequences of SPPG project investment and constructed the investment risk factor evaluation index system. Secondly, the factor analysis method was used to reveal the key investment risk factors and risk consequences. Then, the research hypotheses and conceptual model were proposed, and the empirical analysis was conducted based on the structural equation model (SEM). Findings The results showed that the six key risk factors (political, economic, technological, management, market and natural) have a significant impact on the risks during the whole period. The influence degree of risk factors in the operational period is such that market factor > political factor > economic factor > management factor > natural factor > technical factor. In addition, the risk of constructional period has a significant impact during the risk of operational period. Except for natural factors, all risk factors are correlated among the mutual influence relationship of risk factors. Finally, this paper puts forward management implications based on the above conclusions: effectively identify investment risk factors and comprehensively improve risk management ability; (refine the risk factors of SPPG project investment and develop targeted risk prevention and control strategies; define risk management objectives and make relevant strategic plans. Research limitations/implications Because of the chosen research approach, the research results may lack generalisability. Therefore, researchers are encouraged to test the proposed propositions further. Practical implications It can also help stakeholders propose risk prevention strategies throughout the entire process, to promote the sustainable development of SPPG projects. Originality/value This study focuses on the investment risk of SPPG projects, by building an evaluation index system to identify key risk factors, and then establishes a SEM covering constructional period risks and operational period risks to better explore SPPG project risks, in an effort to reveal the mutual influence relationship and influence path of investment risk factors of the projects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Cdr S. Navaneetha Krishnan (Retd.) ◽  
L.S. Ganesh ◽  
C. Rajendran

Purpose This paper aims to analyse various failures that Indian innovative start-ups (ISs) are exposed to and proposes interventions from management accounting tools (MATs) that can tackle their failure-causing risks. This paper justifies the applicability of contingency theory (CT) for applying MATs for failure prevention and risk management. Design/methodology/approach This paper uses multimethod research while undertaking two sequential studies. The methods include a Survey via semi-structured interviews of 51 specialists and media reports and the Delphi method. Findings Reasons for the failures of Indian ISs have been identified and grouped based on eight broad underlying risk factors. Appropriate MATs relevant to ISs have been identified and examined by relating them with the risk factors underlying failure. Applicability of CT is shown while using the MATs for failure prevention and risk management of ISs. Research limitations/implications This study is limited to the Indian context. Empirical validation of the applicability of MATs for each type of failure along the lifecycle stages of ISs needs to be undertaken. Practical implications Founders/owners of ISs can use this conceptual framework to tackle the risks underlying the failure of their firms. Policymakers can introduce appropriate policies to enhance the survival of ISs. Researchers can further explore the application of CT for failure prevention and risk management of ISs. Originality/value A conceptual framework has been developed relating failure-causing risk factors relevant to ISs and appropriate MATs, which justifies the applicability of CT.