Purpose Harnessing the power of knowledge management is important for minimizing accidents occurring at construction projects. Yet, knowledge management is a neglected dimension when developing safety culture in the construction industry. Therefore, the purpose of this paper is to develop a knowledge-based safety culture questionnaire and examine its validity and reliability in the Indian context. Design/methodology/approach A questionnaire survey was formulated after identifying 69 influencing factors from a thorough literature review. In total, 210 valid responses were obtained from key stakeholders operating in Indian construction industry. Reliability and validity of the measurement scale were examined by factor analysis and inter-item correlation test. Comparison of knowledge-based safety culture scores across several demographic profiles of the respondents was utilized for testing discriminant validity. Findings Results suggest that the new instrument appears to be a reliable, valid and sensitive instrument that will contribute in examining the effect of key factors that influence the importance of the knowledge dimension toward developing safety culture in the construction industry. Originality/value The measurement tool developed in this study focuses on considering the importance of knowledge management in enhancing safety culture of the construction industry. This instrument can be utilized to compare the level of safety culture among key stakeholders of construction projects. This paper can contribute to the promotion of safety theory in Indian construction industry and provide practical implications for construction enterprises when they engage in improving safety conditions in their organizations.

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Deepak MD ◽  
Gangadhar Mahesh

PurposeSafety in construction projects is essential and requires more attention towards minimizing the accident rate. Problems concerning awareness of safety risks, procedures and practices still exist in the industry, which indicate a shortfall in diffusion of safety-related knowledge in construction industry. Also, there is dearth of studies on knowledge management strategies to prevent reoccurrence of accidents and thereby improve safety culture in construction industry. This study attempts to unveil aspects of knowledge management that are ignored in considering safety culture and discern the differences in the perception of key stakeholders of construction industry. Therefore, the objective of this study is to identify and measure knowledge-based safety culture elements.Design/methodology/approachIn this paper, the focus is on the application of a reliable, valid and sensitive knowledge-based safety culture assessment tool on key stakeholders operational in construction industry. Research method adopted is a questionnaire-based survey to seek responses from industry professionals. A total of 199 responses were obtained from 106 different companies operational in Indian construction industry. Statistical analyses including ranking analysis, t-test, correlation analysis, and ANOVA test are utilized for comparing and identifying the differences in view of stakeholder's perceptions concerning workplace safety.FindingsThis study helps to identify and rank critical knowledge-based safety culture elements from the perspective of key stakeholders of construction industry. This contributes in identifying the most critical and neglected variables among the key stakeholders regarding aspects of safety culture. Also, the study shows the importance of knowledge dimension in developing overall safety culture in construction industry.Originality/valueResults of this study offer valuable insight in enabling key stakeholders of construction industry to examine and enhance their safety performance. The implications of this study contribute new knowledge in assessing conditions that will improve worker safety in the construction industry. The paper should be of interest to researchers and practitioners in the area of occupational health and safety management.


2017 ◽  
Vol 15 (6) ◽  
pp. 803-825 ◽  
Author(s):  
Jeffrey Boon Hui Yap ◽  
Anna Lock

Purpose Knowledge management (KM) is the central know how for the construction industry. However, the delivery of construction projects is often plagued by schedule delays and cost overruns due to lack of working knowledge of project personnel. Hence, the need to appraise the practices of knowledge management in the construction industry has become all the more germane. This paper aims to determine the awareness of KM practices in Malaysia-based construction small and medium enterprises, and to investigate the benefits, tools and techniques, and challenges associated with knowledge management implementation so that effective measures can be devised to address them. Design/methodology/approach The research data were gathered using a structured questionnaire survey disseminated in the Klang Valley region in Malaysia. Responses were collected from 107 industry practitioners. The quantitative data are subjected to descriptive statistics, and the ranking with category of significance of the hypothesised variables is determined using the relative importance index (RII) technique. Findings The key benefits of KM practices are predominantly raising efficiency, quality, productivity and decision-making. The most preferred KM techniques are “face-to-face interaction”, “mentoring” and “documents and reports”. The highly significant tools are “groupware” and “telephone”. The major organisational issue hampering the implementation of knowledge management practices is “lack of motivation” while the critical cultural issue is relating to “bureaucracy and hierarchical”, and the vital people issue concerns “lack of trust”. Research limitations/implications The respondents were limited to only small and medium construction enterprises located in the Klang Valley region in Malaysia, which makes generalisation challenging. Practical implications KM provides not only a pragmatic but also a proactive approach to raising the competitive edge and capabilities of a construction company. Identification of the critical attributes of KM provides the basis for project managers in formulating KM strategies to enhance the chances of successful delivery of future projects. Originality/value The study contributes to the debate on the knowledge agenda in the construction industry, particularly from a fast developing economy’s perspective, where an effective KM can further contribute to realising a reasonable level of competitiveness operation.


2019 ◽  
Vol 9 (5) ◽  
pp. 597-615 ◽  
Author(s):  
Sadi Assaf ◽  
Mohammad A. Hassanain ◽  
Abdullatif Abdallah ◽  
Ahmed M.Z. Sayed ◽  
Abdulrahman Alshahrani

Purpose Projects in the construction industry have been confronted with an unprecedented volume of claims, which negatively impact the construction business environment. The purpose of this paper is to identify and assess the major causes of claims and disputes, from the perspectives of three key stakeholders. Design/methodology/approach An online and paper-based questionnaire was distributed to a random sample of 250 professionals. Responses from 86 construction professionals were obtained. The significance index was employed to rank the factors and hence assess their relative significance. Results were analyzed from both the individual stakeholder, and collective perspectives. Test of agreement was also conducted. Findings The research found the following causes to be the most significant contributors to claims and disputes in Saudi Arabia: “change or variation orders due to new requirements from client” (78 percent), “variations in quantities due to new requirements from client” (74 percent), “delay caused by contractor” (74 percent), “design errors or omissions” (72 percent) and “inconsistencies in the drawings and specifications” (70 percent). Originality/value The research provides an in-depth assessment of the causes of claims and disputes, in the setting of a fast growing industry, in which strong performance is essential to continued success. Unlike several of the reviewed studies which reported “delay caused by the owner” or “delayed in payment” as a major cause of claims and/or disputes, the findings of the current study indicated that this cause was not the most significant. Instead, it was determined that the top causes of claims and disputes were attributed to all parties, including consultants, contractors and clients.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Lekan Damilola Ojo ◽  
Deji Rufus Ogunsemi ◽  
Olusola Ogunsina

Purpose The Nigerian construction industry is bedeviled with poor project performance and outcomes which value management (VM) could address if applied. The application of VM on Nigerian construction projects is very minimal due to certain obstacles, namely, lack of VM experts, paucity of knowledge on the techniques, etc., which inhibits the adoption into the construction industry. Therefore, this study aims to develop a conceptual framework of the adoption of VM on construction projects in a typical developing economy. Design/methodology/approach This study engaged 15 selected VM experts in two rounds of Delphi survey to develop a conceptual framework of VM adoption. The method of data analysis includes mean score, standard deviation, Kendall’s coefficient of concordance, chi-square (χ2) test, interrater agreement analysis and significant level analysis. The developed conceptual framework was sent to a team of local and international VM experts for validation. Findings This study reveals that the adoption of VM requires the collective effort of relevant stakeholders in the construction industry. The framework developed presents individual and collective activities to be undertaken by the stakeholders. The activities include training, legislation, government-funded research, etc. Thus, the adoption of innovative management methodology like VM requires the collaboration of academics, construction professional bodies and government parastatals. This will assist in the judicious use of limited construction resources and boost the relevance of the Nigerian construction industry among developing nations and in the global construction market. Originality/value This study used the opinions of few construction professionals that can be regarded as VM experts in Nigeria, as against engaging a pool of construction professionals who may not be knowledgeable in VM process. Engaging the few VM experts in the Nigerian construction industry is important to have a valid basis for drawing conclusion, as large questionnaire survey could be possibly filled by inexperienced or unqualified respondents if stringent criteria are not considered at the outset of this study.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Osama ◽  
Aly Sherif ◽  
Mohamed Badawy

Purpose This paper aims to enlighten the importance of the risk management process which is considered as a major procedure to effectively handle the potential inherent risks in the construction industry. However, most traditional risk analysis techniques are based on theories that deal with each risk factor as an independent, which does not take into consideration the causal relationships between risk factors. Design/methodology/approach This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using Bayesian belief networks (BBN). Through a review of the literature, 27 risk factors were identified and categorized as the most common risk factors in the construction industry. A structured questionnaire was performed to estimate the probability and severity of these risks. Through site visits and interviews with experts in the construction field, 200 valid questionnaires were collected. A risk analysis model was developed using BBNs, then the applicability of this model was verified using a case study in Egypt. Findings However, the outcome showed that critical risks that manipulate administrative construction projects in Egypt were corruption and bribery, contractor financial difficulties, force majeure, damage to the structure and defective material installation. Practical implications The proposed study presents the possibilities available to the project parties to obtain a better forecast of the project objectives, including the project duration, total project cost and the target quality by examining the causal relationships between project risks and project objectives. Originality/value This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using BBNs.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Chipozya Kosta Tembo ◽  
Franco Muleya ◽  
Emmanuellie Phiri

PurposeThis research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance.Design/methodology/approachThe approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients.FindingsFindings revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations.Originality/valueForeign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.


Author(s):  
Habeeb Kusimo ◽  
Lukumon Oyedele ◽  
Olugbenga Akinade ◽  
Ahmed Oyedele ◽  
Sofiat Abioye ◽  
...  

Purpose The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach Based on a qualitative research methodology, 14 experts from the UK construction industry were chosen to be participants in the study. The participants were equally divided into two focus groups to discuss resource management using five projects as case studies. Thematic analysis of the discussion reveals seven key factors that affect resource management. Findings The results show that most of the problems identified are due to poor data management processes and the practice of having data in silos. Overcoming this challenge requires the adoption of big data approaches for resource management to allow the integration of large and different forms of data. Originality/value This study seeks to bring to the fore challenges faced in resource management by the UK construction industry and to outline some solutions to address them.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Abdullah Al-Yami ◽  
Muizz O. Sanni-Anibire

Purpose Although there is a boom in the construction industry in the Kingdom of Saudi Arabia (KSA), it is yet to fully adopt building information modeling (BIM), which has received a lot of attention in the US, UK and Australian construction industries. Thus, the purpose of this paper is to provide the current state of the art in BIM implementation in Saudi Arabia, as well as perceived benefits and barriers through a case study. Design/methodology/approach A broad overview of BIM, the construction industry in KSA and the research and implementation of BIM in KSA was presented in this study. The research further established the perceived benefits and barriers of BIM implementation through a case study of a local AEC firm. A questionnaire survey was used to obtain lessons learned from the BIM team of the pilot project and was further analyzed using the RII approach. Findings The study’s findings include the lack of policy initiatives in KSA to enforce BIM in the construction industry, as well as the lack of sufficient research in the domain of BIM in KSA. Furthermore, the case study also revealed that the most important benefit of BIM adoption is “detection of inter-disciplinary conflicts in the drawings to reduce error, maintain design intent, control quality and speed up communication,” whereas the most important barrier is “the need for re-engineering many construction projects for successful transition towards BIM.” Originality/value The study provides a background for enhanced research towards the implementation of BIM in Saudi Arabia and also demonstrates the potential benefits and barriers in BIM implementation.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aliyeh Kazemi ◽  
Eun-Seok Kim ◽  
Mohammad-Hossein Kazemi

Purpose Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects. Design/methodology/approach In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized. Findings The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects. Research limitations/implications These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts. Originality/value The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.


Kybernetes ◽  
2018 ◽  
Vol 47 (9) ◽  
pp. 1778-1800 ◽  
Author(s):  
Vipula Sisirakumara Gunasekera ◽  
Siong-Choy Chong

PurposeThis paper aims to review the knowledge management (KM) processes, knowledge conversion modes and critical success factors (CSFs) and contextualise them to the construction setting to guide effective KM implementation.Design/methodology/approachThis paper is conceptual in nature. It begins with a review of issues faced by construction organisations, which led them to consider implementing KM. This is followed by a comprehensive review of KM processes, knowledge conversion modes, KM CSFs and their application to the construction industry.FindingsBased on the socialisation, externalisation, combination and internalisation (SECI) model, the knowledge conversion modes are discussed, linking them to the KM processes of knowledge creation, sharing, storage and application. The KM CSFs identified from construction literature suggest that they can be categorised into two groups, namely, factors within organisational control (managerial influence, technological influence and resource influence) and factors beyond organisational control (social influence, political influence, environmental influence, economic influence, industry influence and construction technology influence). The resulting review is discussed in terms of how construction organisations can implement KM effectively to achieve the desired project performance outcomes in terms of time, cost and quality.Research limitations/implicationsAlthough this paper has made some theoretical contributions, a quantitative analysis will further reinforce its value both in theory and practice, particularly in terms of applying the KM processes and CSFs to different organisational, industry and country settings. A quantitative research is being carried out in the major construction sector in Sri Lanka to establish the relationships between the KM processes, knowledge conversion modes and KM CSFs with project performance outcomes, which will be reported in a subsequent publication.Practical implicationsAs the construction industry uses a considerable number of knowledge workers, implementing KM for project planning and execution is the key to sustaining the growth of construction organisations and industry, particularly when KM implementation is linked to project performance outcomes. Practical implications are provided in terms of what successful KM implementation entails.Social implicationsEffective KM implementation can serve as a conduit for construction organisations to build capacity and develop the ability to react quickly to social challenges brought about by different stakeholders, even before the project commences, so that the project performance outcomes will not be affected. Another social implication is the role played by project team members, in which efforts have to be put in place to facilitate the use of KM processes, so that teams can align project activities to the general good of their organisations.Originality/valueA comprehensive KM framework that guides the construction industry on KM implementation is long overdue. This research represents the first of such attempts to view KM from a wider perspective, both in terms of internal and external influences affecting construction organisations. Once the conceptual framework developed is validated, it is expected to bring enormous benefits to different stakeholders.