Evaluating key risk factors for PPP water projects in Ghana: a Delphi study

2015 ◽  
Vol 13 (2) ◽  
pp. 133-155 ◽  
Author(s):  
Ernest Effah Ameyaw ◽  
Albert P.C. Chan

Purpose – This paper aims to report on the partial findings of a research project on risk allocation in public–private partnership (PPP) water projects. It identifies risk factors encountered in PPP water infrastructure projects, evaluates their associated risk levels and presents an authoritative risk factor list to assist the sector institutions to understand the important risks associated with such projects in Ghana. Design/methodology/approach – A ranking-type Delphi survey was conducted to develop a rank-order list of critical risk factors. Findings – Twenty critical risk factors with high impact on water PPPs were established. The top-five risks relate to foreign exchange rate, corruption, water theft, non-payment of bills and political interference. Originality/value – Being the pioneering study, it holds implications for practitioners. By prioritising the risks according to their relative impacts on the success of water PPP projects, public and private participants will become more aware of and leverage efforts and scarce resources to address those significant factors with serious consequences on projects objectives. The paper adopts a research approach that can be used by future researchers in similar environments where PPP is novel and experts are hard to find.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Bamidele Temitope Arijeloye ◽  
Isaac Olaniyi Aje ◽  
Ayodeji Emmanuel Oke

Purpose The purpose of the study is to elicit risk factors that are peculiar to public-private partnership (PPP)-procured mass housing in Nigeria from the expert perspectives in ensuring the success of the scheme thereby reducing housing deficit in the country. Design/methodology/approach The risk inherent in construction projects had been established through literature in general. The risk in PPP projects is emerging because of the recent acceptance of the procurement option by governments all over the globe. The Nigerian Government has also adopted the procurement option in bridging the housing deficit in the country. This study, therefore, conducts a Delphi survey on the probability of risk occurrence peculiar to PPP mass housing projects (MHPs) in Nigeria. Pragmatic research approach through the mixed method of both quantitative and qualitative methods was adopted for this study. The quantitative method adopts the administration of questionnaires through the Delphi survey, whereas the qualitative method used interviews with the respondents. A two-stage Delphi questionnaire was administered to construction practitioners that cut across academics, the public and the private sectors by adopting convenient sampling techniques and following the Delphi principles and procedures. A total of 63 risk factors were submitted to the expert to rank on a Likert scale of 7 and any risk factors that the mean item score (MIS) falls below the grading scale of the five-point benchmark is deemed not necessary a risk factor associated with PPP MHPs and thereby expunged from the second round of the Delphi Survey. The interview was subsequently applied to the respondents to substantiate the risk factors that are peculiar to PPP-procured mass housing in the study area. Findings The findings show that risk factors such as maintenance frequent than expected, life of facility shorter than anticipated and maintenance cost higher than expected fall below 5.0 benchmark with MIS of 4.64 and 4.55 indicating that the risk factors are not peculiar to PPP mass housing in Nigeria. Research limitations/implications The implication for practise of this research is that these risk factors provide the PPP stakeholders with the comprehensive checklists that can aid in developing PPP risk assessment guidelines in the sector though both partners should be aware of the dynamic nature of risk because new ones might be emerging. Originality/value The authors hereby declare that the research findings are a product of a thorough research conducted in the study area and have not to be submitted or published by another person or publisher and due acknowledgement was made where necessary.


2015 ◽  
Vol 13 (1) ◽  
pp. 165-194 ◽  
Author(s):  
Abdulaziz M. Jarkas ◽  
Theodore C. Haupt

Purpose – The purpose of this paper is to identify, explore, rank the relative importance and determine the prevalent allocation response trends of the major construction risk factors considered by general contractors operating in the State of Qatar. Design/methodology/approach – A structured questionnaire survey comprising 37 potential risk factors was distributed to a statistically representative sample of contractors. The influence ranks of the factors explored were determined using the “Relative Importance Index (RII)” technique, whereas the prevalent trend of contractors’ attitudes toward risk allocation of each factor investigated was quantified and expressed as a percentage, based on the number of respondents who selected a specific option, in relation to the total number of respondents. Findings – The results obtained indicate that risks related to the “client” group are perceived as most critical, followed by the “consultant”, “contractor” and “exogenous” group-related factors, respectively. The outcomes further show that the “transfer” option is the contractors’ prevalent response to “client” and “consultant”-related risks, while the “retention” decision is the principal pattern linked to “contractor” and “exogenous” group-related risk factors. Research limitations/implications – The dominant respondents’ perception that the crucial construction risks are related to clients and consultants suggests that these two parties have an essential role in controlling the negative ramifications of the associated factors. Practical implications – The findings suggest that increasing designers’ awareness of the significant effect of applying the constructability concept can considerably help reducing the risks concomitant of the construction operation. Policy makers may contribute, moreover, in alleviating the risk of incompetent technical staff and operatives’ employment by controlling the migration of inexperienced and unskilled construction workforce into the State. Originality/value – Given the knowledge gap for the major construction risk factors considered by general contractors in Qatar, the results reported in this study can provide clients, industry practitioners and policy makers with guidance to effectively manage the significant risks determined, which can further assist in achieving a reasonable level of competitiveness and cost-effective operation.


IMP Journal ◽  
2018 ◽  
Vol 12 (2) ◽  
pp. 313-332 ◽  
Author(s):  
Jörgen Elbe ◽  
Sabine Gebert Persson ◽  
Fredrik Sjöstrand ◽  
Karin Ågren

Purpose This paper explores a type of organizing that can be found in tourist destinations that are administratively bound to a specific geographic area in the intersection of public and private context. The purpose of this paper is to contribute to the understanding of the organizing of activities within destinations and also to contribute theoretically and conceptually to how place dependency and public/private can be understood from an industrial marketing and purchasing (IMP) network perspective. Design/methodology/approach The research approach has its origin in an ongoing multi-disciplinary and longitudinal case study. Findings By applying a network approach to the organizing of destinations, where interaction of relationships, resources, actors and activities play an essential role, a number of propositions have been put forth so as to provide for a better understanding of place-specific organizing, in the intersection between public and private interests. Research limitations/implications The paper is conceptual and more empirical studies are needed to test the findings. One implication to consider in future empirical studies is the tensions between created and organic networks that exist in public and private place partnerships. Practical implications The paper provides insights into factors affecting destination management. Social implications With an emphasis on a socio-political context, the opportunities and limitations that exist between public and private sectors are discussed. Originality/value The paper sheds light on a neglected aspect of a contemporary phenomenon where the IMP network approach could contribute to the understanding of destination marketing or management organization that are bound to a specific place in the intersection between the public and private context. The area of public-private organizing is a topic that may also add new aspects to the IMP community.


Facilities ◽  
2014 ◽  
Vol 32 (11/12) ◽  
pp. 624-646 ◽  
Author(s):  
Daniel W.M. Chan ◽  
Joseph H.L. Chan ◽  
Tony Ma

Purpose – This paper aims to develop a fuzzy risk assessment model for construction projects procured with target cost contracts and guaranteed maximum price contracts (TCC/GMP) using the fuzzy synthetic evaluation method, based on an empirical questionnaire survey with relevant industrial practitioners in South Australia. Design/methodology/approach – A total of 34 major risk factors inherent with TCC/GMP contracts were identified through an extensive literature review and a series of structured interviews. A questionnaire survey was then launched to solicit the opinions of industrial practitioners on risk assessment of such risk factors. Findings – The most important 14 key risk factors after the computation of normalised values were selected for undertaking fuzzy evaluation analysis. Five key risk groups (KRGs) were then generated in descending order of importance as: physical risks, lack of experience of contracting parties throughout TCC/GMP procurement process, design risks, contractual risks and delayed payment on contracts. These survey findings also revealed that physical risks may be the major hurdle to the success of TCC/GMP projects in South Australia. Practical implications – Although the fuzzy risk assessment model was developed for those new-build construction projects procured by TCC/GMP contracts in this paper, the same research methodology may be applied to other contracts within the wide spectrum of facilities management or building maintenance services under the target cost-based model. Therefore, the contribution from this paper could be extended to the discipline of facilities management as well. Originality/value – An overall risk index associated with TCC/GMP construction projects and the risk indices of individual KRGs can be generated from the model for reference. An objective and a holistic assessment can be achieved. The model has provided a solid platform to measure, evaluate and reduce the risk levels of TCC/GMP projects based on objective evidence instead of subjective judgements. The research methodology could be replicated in other countries or regions to produce similar models for international comparisons, and the assessment of risk levels for different types of TCC/GMP projects (including new-build or maintenance) worldwide.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Christopher Amoah ◽  
Linda Bikitsha

PurposeEmerging construction companies often liquidate due to their inability to institute strategies to handle their business risks. This study investigated the skills and strategies adopted by emerging contractors to overcome business risk factors to make their businesses sustainable.Design/methodology/approachA qualitative research approach was adopted for the study. Semi-structured interview questions were used to solicit information from emerging contractors within the Construction Industry Development Board (CIDB) Grade one (1) to four (4) in the Gauteng Province of South Africa. The data gathered were analysed using qualitative content analysis to identify the main themes.FindingsThe study's findings indicate that emerging contractors face business risk factors that impact their project execution hugely. Thus to overcome these risk factors, they implement various strategies to curtail the risk they encounter in their businesses. These strategies include; human resource management (employing experienced and skilled labour and training of staff); communication management (with other employees about set goals); financial management (effective pricing of tender documents); procurement management (ensuring materials are available as and when necessary in their projects) and quality management (ensuring effective work supervision); among others.Research limitations/implicationsAlthough the study concentrated on the emerging construction firms in the Gauteng Province of South Africa, the findings may be applicable in other provinces and beyond South Africa.Practical implicationsIn order for emerging contractors to prevent the collapse of their businesses, there is the need to be educated on effective project risk management to identify potential business risk, the mirage associated with the notion of the construction business profitability, effective tender pricing and strategic business partnership. These strategies, if well thought, will help sustain their businesses and growth in the construction industry.Originality/valueThe study has identified the management strategies used by emerging contractors to sustain their businesses in the construction industry. Thus, the finding will guide both emerging contractors who are already in the construction business and those planning to enter the construction market.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Awinaba Amoah Adongo ◽  
Jonathan Mensah Dapaah ◽  
Francess Dufie Azumah ◽  
John Onzaberigu Nachinaab

PurposeSeveral studies have described health-seeking behaviour within the context of various diseases, the health status and age group. However, knowledge on patient health-seeking behaviour in the use of public and private hospitals and socio-demographic characteristics in developing countries is still scarce. This paper examines the influence of socio-demographic behavioural variables on health-seeking behaviour and the use of public and private health facilities in Ghana.Design/methodology/approachQuantitative research approach uses the modified SERVQUAL dimension as a data collection tool. Descriptive statistics with Pearson's chi-square test were conducted to determine the relationship between socio-demographic behavioural variables and health-seeking behaviour of patients using public and private hospitals.FindingsThe results showed that there is a significant relationship between the socio-demographic characteristics (sex, marital status, education, level of income) and the health-seeking behaviour of patients in regard to the utilisation of public and private health facilities (p < 0.000).Originality/valueThere is a significant relationship between patients' socio-demographic variables and their choice and utilisation of public and private healthcare services. This information is of value to policy makers so that they have an idea on the socio-demographic behavioural variables that influence patients' health-seeking behaviour.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Douglas Aghimien ◽  
Clinton Aigbavboa ◽  
Tsholofelo Meno ◽  
Matthew Ikuabe

Purpose This study aims to present the result of an assessment of the risk of construction digitalisation with a view to sensitising and preparing construction organisations for unforeseen issues that might arise in the course of their digital transformation. Design/methodology/approach The study took a post-positivist stance through a quantitative research approach. A survey of construction professionals actively involved in construction projects in South Africa was conducted using a structured questionnaire. The analysis of the data gathered was done using mean item scores, Kruskal–Wallis H test, exploratory factor analysis (EFA) and structural equation modelling (SEM). Findings EFA revealed five principal risk factors (human and financial, technological, legal and security, operations and socioeconomic risk factors) associated with the digitalisation of construction organisations. However, SEM revealed that four out of these risk components have significant direct relationships with some selected digitalisation outcomes. These significant risk factors are technology, legal and security issues, operations and socioeconomic issues. Originality/value This study provides practical insight into the risk inherent in construction digitalisation, and its result can help organisations seeking to be digitally transformed make informed decisions. Theoretically, the study reveals the risks associated with construction digitalisation – an aspect that has not gained significant attention in the current fourth industrial revolution discourse. Therefore, its findings can form a basis for future studies on the risk of digitalising construction organisations.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Amr Metwally El-Kholy ◽  
Ahmed Yousry Akal

PurposeThis research investigates the financial viability risk factors that threaten the private investor's economic scheme in the public private partnership (PPP) wastewater treatment plant (WWTP) projects in Egypt. The aims of this study are to: (1) illustrate and cluster the financial viability risk factors in accordance with the PPP WWTP projects' nature, (2) assess the risk factors' criticality degrees according to their severity and frequency levels of the financial viability, and (3) pinpoint the suited allocation of the financial viability risk factors between the public and private parties.Design/methodology/approachRelying on the previous analysts' endeavors, the questionnaire method, the fuzzy synthetic evaluation approach and the hypothetical normal distribution curve model; the severity, frequency, criticality and allocation preference of 32 financial viability risk factors were assessed from 12 Egyptian PPP experts.FindingsThe data analysis yielded that foreign exchange risk, currency risk/inflation, license risk, construction cost-overrun and late site handover are the key factors in arising the financial viability risk issue in the PPP WWTP projects. Considering the discussion of these key risks, the study summarized that the financial viability's key risk factors are notably be affected by the economic, political and administrative circumstances of the host county. Additionally, the inflation lesion was found to be the core reason of most of the key risk factors.Originality/valueThis research originality stems from its contribution to address the gab in the PPP risk assessment literature of the concessionaire's financial viability in the WWTP projects in a country of developing economy as Egypt. This, first, enriches the scholarly based knowledge of the PPP projects' risk analysts of the developing countries. Accordingly, it moves the current PPP risk assessment research further to deeply apprehend these markets' risks. Second, it equips the policymakers in the public and private sectors of such projects with a map that clarifies their assigned risk factors and the responsibilities that each party should bear to generate a mutual stable investment environment for achieving their aims successfully. This, indeed, paves the way for more private investments to be involved in the developing markets' PPP projects with a profitable satisfactory level for the private concessionaire. In the same vein, more WWTP projects, which are highly needed for the public sector and its people, are executed.


Facilities ◽  
2015 ◽  
Vol 33 (7/8) ◽  
pp. 428-453 ◽  
Author(s):  
Ernest Effah Ameyaw ◽  
Albert P.C Chan

Purpose – This paper aims to identify and evaluate the most significant risk factors that strongly affect the implementation of public–private partnership (PPP) water supply projects. PPP for water supply infrastructure services has seen continued growth over the past two decades, following public sector’s budgetary constraints and inability to provide infrastructure-based water services efficiently and cost effectively. However, these projects are often subjected to major risks leading to failures. Design/methodology/approach – Following extensive literature review and case study analyses, an international questionnaire survey was conducted with practicing and experienced PPP experts to establish the significant risks in PPP water projects. Both the probability of occurrence and severity of 40 risks were evaluated by the expert panel to determine their significance and impact on water projects procured under the PPP arrangement. Findings – The paper presents a derived risk factor list, ranks the factors and describes the “top-ranked” risk factors as: poor contract design, water pricing and tariff review uncertainty, political interference, public resistance to PPP, construction time and cost overrun, non-payment of bills, lack of PPP experience, financing risk, faulty demand forecasting, high operational costs and conflict between partners. Originality/value – This factor list broadens PPP stakeholders’ view of important project risks, rather than relying on culture-dependent studies – an area that has received less attention in PPP risk management research. The identified risk factors would provide governments and investors a useful tool in implementing constructive water PPPs by facilitating the development of risk mitigation strategies, particularly for developing countries with poor risk management practices.


2015 ◽  
Vol 13 (1) ◽  
pp. 45-69 ◽  
Author(s):  
Ernest Effah Ameyaw ◽  
Albert P.C. Chan ◽  
De-Graft Owusu-Manu ◽  
Ekow Coleman

Purpose – The purpose of this paper is to identify and then evaluate perceived risk factors influencing variability between contract sum and final count, and to develop a fuzzy risk assessment model for evaluating the overall impact of established critical risk factors impacting on variability between contract sum and final account in government-funded construction projects. Construction projects are characterised by risk factors that significantly impact on variability between the contract sum and final account. Design/methodology/approach – A research approach integrating questionnaire survey, mean scoring ranking and principal component factor analysis (PCFA) methods was adopted to evaluate and classify the critical risk factors. A fuzzy synthetic evaluation method was sequentially applied to compute the overall risk impact (ORI) of eight critical risk factors’ impact on variability between contract sum and final account. Findings – Initial results showed that eight critical risk factors have high impact on variations between contract sum and final account, namely (in order): project funding problems, underestimation of quantities, variations by client, change in scope of works, inadequate specification, change in design by client, defects in design and unexpected site (ground) conditions. PCFA produced two factor solutions: “professional-related factors” and “client factors”. The fuzzy model further showed that the ORI is 5.48, indicating that these risk factors have a high impact on variability between contract sum and final account in public construction projects. The client factors have a very high impact (5.59), while the professional-related factors indicated a high impact (5.41) on project cost variability. Originality/value – A practical model is proposed to evaluate the key risks associated with cost overruns in public projects. By giving effective and sustained attention to these factors, variability between contract sum and final account, a common situation in Ghana, can be controlled to achieve cost savings in public infrastructure projects.