Microwave spectroscopic dielectric model of moist soils using physical and hydrological characteristics as input parameters

Author(s):  
P.P. Bobrov ◽  
V.L. Mironov ◽  
O.A. Ivchenko ◽  
V.N. Krasnoukhova
2019 ◽  
Vol 329 (6) ◽  
pp. 30-32 ◽  
Author(s):  
D.R. Bazarov ◽  
◽  
B.C. Nikolov ◽  
G.U. Zhumabayev ◽  
F.K. Artikberova ◽  
...  

2005 ◽  
Vol 10 (1) ◽  
pp. 65-75 ◽  
Author(s):  
Z. Kala

The load-carrying capacity of the member with imperfections under axial compression is analysed in the present paper. The study is divided into two parts: (i) in the first one, the input parameters are considered to be random numbers (with distribution of probability functions obtained from experimental results and/or tolerance standard), while (ii) in the other one, the input parameters are considered to be fuzzy numbers (with membership functions). The load-carrying capacity was calculated by geometrical nonlinear solution of a beam by means of the finite element method. In the case (ii), the membership function was determined by applying the fuzzy sets, whereas in the case (i), the distribution probability function of load-carrying capacity was determined. For (i) stochastic solution, the numerical simulation Monte Carlo method was applied, whereas for (ii) fuzzy solution, the method of the so-called α cuts was applied. The design load-carrying capacity was determined according to the EC3 and EN1990 standards. The results of the fuzzy, stochastic and deterministic analyses are compared in the concluding part of the paper.


1995 ◽  
Vol 31 (8) ◽  
pp. 197-205 ◽  
Author(s):  
L. L. Bijlmakers ◽  
E. O. A. M. de Swart

For the area of the Ronde Venen a plan for large-scale wetland-restoration and improvement of the water quality was developed. Major elements of the developed spatial strategy are the optimal use of the specific hydrological and ecological characteristics of the area. Based on regional hydrological characteristics within the study area hydrological sub-units were distinguished by connecting discharge and recharge areas. In this way the intake of polluted surface water from outside the area could be minimized, with an optimal use of specific local differences in water quality. Two scenarios were developed and evaluated using hydrological, hydrochemical and ecological models. The scenarios differed in spatial composition and the way the water level was manipulated. In order to optimize water quality, natural and artificial pollution control mechanisms were implemented as well. An important criterion for the evaluation was the extent to which the scenarios succeeded in optimizing conditions for the realization of the ecological goals. The most promising and acceptable scenario has been worked out in further detail.


2021 ◽  
Vol 13 (10) ◽  
pp. 1880
Author(s):  
Marek Siranec ◽  
Marek Höger ◽  
Alena Otcenasova

The advance in remote sensing techniques, especially the development of LiDAR scanning systems, allowed the development of new methods for power line corridor surveys using a digital model of the powerline and its surroundings. The advanced diagnostic techniques based on the acquired conductor geometry recalculation to extreme operating and climatic conditions were proposed using this digital model. Although the recalculation process is relatively easy and straightforward, the uncertainties of input parameters used for the recalculation can significantly compromise such recalculation accuracy. This paper presents a systematic analysis of the accuracy of the recalculation affected by the inaccuracies of the conductor state equation input variables. The sensitivity of the recalculation to the inaccuracy of five basic input parameters was tested (initial temperature and mechanical tension, elasticity modulus, specific gravity load and tower span) by comparing the conductor sag values when input parameters were affected by a specific inaccuracy with an ideal sag-tension table. The presented tests clearly showed that the sag recalculation inaccuracy must be taken into account during the safety assessment process, as the sag deviation can, in some cases, reach values comparable to the minimal clearance distances specified in the technical standards.


1986 ◽  
Vol 9 (3) ◽  
pp. 323-342
Author(s):  
Joseph Y.-T. Leung ◽  
Burkhard Monien

We consider the computational complexity of finding an optimal deadlock recovery. It is known that for an arbitrary number of resource types the problem is NP-hard even when the total cost of deadlocked jobs and the total number of resource units are “small” relative to the number of deadlocked jobs. It is also known that for one resource type the problem is NP-hard when the total cost of deadlocked jobs and the total number of resource units are “large” relative to the number of deadlocked jobs. In this paper we show that for one resource type the problem is solvable in polynomial time when the total cost of deadlocked jobs or the total number of resource units is “small” relative to the number of deadlocked jobs. For fixed m ⩾ 2 resource types, we show that the problem is solvable in polynomial time when the total number of resource units is “small” relative to the number of deadlocked jobs. On the other hand, when the total number of resource units is “large”, the problem becomes NP-hard even when the total cost of deadlocked jobs is “small” relative to the number of deadlocked jobs. The results in the paper, together with previous known ones, give a complete delineation of the complexity of this problem under various assumptions of the input parameters.


Energies ◽  
2021 ◽  
Vol 14 (4) ◽  
pp. 1052
Author(s):  
Baozhong Wang ◽  
Jyotsna Sharma ◽  
Jianhua Chen ◽  
Patricia Persaud

Estimation of fluid saturation is an important step in dynamic reservoir characterization. Machine learning techniques have been increasingly used in recent years for reservoir saturation prediction workflows. However, most of these studies require input parameters derived from cores, petrophysical logs, or seismic data, which may not always be readily available. Additionally, very few studies incorporate the production data, which is an important reflection of the dynamic reservoir properties and also typically the most frequently and reliably measured quantity throughout the life of a field. In this research, the random forest ensemble machine learning algorithm is implemented that uses the field-wide production and injection data (both measured at the surface) as the only input parameters to predict the time-lapse oil saturation profiles at well locations. The algorithm is optimized using feature selection based on feature importance score and Pearson correlation coefficient, in combination with geophysical domain-knowledge. The workflow is demonstrated using the actual field data from a structurally complex, heterogeneous, and heavily faulted offshore reservoir. The random forest model captures the trends from three and a half years of historical field production, injection, and simulated saturation data to predict future time-lapse oil saturation profiles at four deviated well locations with over 90% R-square, less than 6% Root Mean Square Error, and less than 7% Mean Absolute Percentage Error, in each case.


Sign in / Sign up

Export Citation Format

Share Document