The search for power plant sustainability options continues as regulating agencies exert more stringent industrial gas turbine emission requirements on operators. Purchasing power for resale, de-comissioning current capabilities altogether and repowering by replacing or converting existing equipment to comply with emissions standards are economic-driven options contemplated by many mature gas turbine operators. One Las Vegas Nevada, USA operator, NV Energy, with four (4) natural gas fired W501B6 Combined Cycle units at their Edward W. Clark Generating Station, was in this situation in 2006. The units, originally configured with diffusion flame combustion systems, were permitted at 103 ppm NOx with regulatory mandates to significantly reduce NOx emissions to below 5ppm by the end of 2009. Studies were conducted by the operator to evaluate the economic viability of using a Selective Catalytic Reduction (SCR) system, which would have forced significant modifications to the exhaust system and heat recovery steam generator (HRSG), or convert the turbines to operate with dry low-emissions combustion systems. Based on life cycle cost and installation complexity, the ultra-low emission combustion system was selected. This technical paper focuses on a short summary of the end user considerations in downselecting options, the ultra low emissions technology and key features employed to achieve these low emissions, an overview of the conversion scope and a review and description of the control technology employed. Finally, a technical discussion of the low emissions operational flexibility will be provided including performance results of the converted units.

Author(s):  
Jeffrey A. Benoit ◽  
Charles Ellis ◽  
Joseph Cook

The search for power plant sustainability options continues as regulating agencies exert more stringent industrial gas turbine emission requirements on operators. Purchasing power for resale, decomissioning current capabilities altogether, and repowering by replacing or converting existing equipment to comply with emission standards are economic-driven options contemplated by many mature gas turbine operators. One Las Vegas, NV operator, NV Energy, with four natural gas-fired W501B6 combined cycle units at their Edward W. Clark Generating Station, was in this situation in 2006. The units, originally configured with diffusion flame combustion systems, were permitted at 103 ppm NOx with regulatory mandates to significantly reduce NOx emissions to below 5 ppm by the end of 2009. Studies were conducted by the operator to evaluate the economic viability of using a selective catalytic reduction system, which would have forced significant modifications to the exhaust system and heat recovery steam generator, or convert the turbines to operate with dry low-emission combustion systems. Based on life cycle cost and installation complexity, the ultralow-emission combustion system was selected. This technical paper focuses on a short summary of the end user considerations in downselecting options, the ultralow emissions technology, and key features employed to achieve these low emissions, an overview of the conversion scope and a review and description of the control technology employed. Finally, a technical discussion of the low-emission operational flexibility will be provided including performance results of the converted units.


2011 ◽  
Vol 133 (05) ◽  
pp. 30-33 ◽  
Author(s):  
Lee S. Langston

This article explores the increasing use of natural gas in different turbine industries and in turn creating an efficient electrical system. All indications are that the aviation market will be good for gas turbine production as airlines and the military replace old equipment and expanding economies such as China and India increase their air travel. Gas turbines now account for some 22% of the electricity produced in the United States and 46% of the electricity generated in the United Kingdom. In spite of this market share, electrical power gas turbines have kept a much lower profile than competing technologies, such as coal-fired thermal plants and nuclear power. Gas turbines are also the primary device behind the modern combined power plant, about the most fuel-efficient technology we have. Mitsubishi Heavy Industries is developing a new J series gas turbine for the combined cycle power plant market that could achieve thermal efficiencies of 61%. The researchers believe that if wind turbines and gas turbines team up, they can create a cleaner, more efficient electrical power system.


Author(s):  
Edgar Vicente Torres González ◽  
Raúl Lugo Leyte ◽  
Martín Salazar Pereyra ◽  
Helen Denise Lugo Méndez ◽  
Miguel Toledo Velázquez ◽  
...  

In this paper is carried out a comparison between a gas turbine power plant and a combined cycle power plant through exergetic and environmental indices in order to determine performance and sustainability aspects of a gas turbine and combined cycle plant. First of all, an exergetic analysis of the gas turbine and the combined is carried out then the exergetic and environmental indices are calculated for the gas turbine (case A) and the combined cycle (case B). The exergetic indices are exergetic efficiency, waste exergy ratio, exergy destruction factor, recoverable exergy ratio, environmental effect factor and exergetic sustainability. Besides, the environmental indices are global warming, smog formation and acid rain indices. In the case A, the two gas turbines generate 278.4 MW; whereas 415.19 MW of electricity power is generated by the combined cycle (case B). The results show that exergetic sustainability index for cases A and B are 0.02888 and 0.1058 respectively. The steam turbine cycle improves the overall efficiency, as well as, the reviewed exergetic indexes. Besides, the environmental indices of the gas turbines (case A) are lower than the combined cycle environmental indices (case B), since the combustion gases are only generated in the combustion chamber.


Author(s):  
Weimar Mantilla ◽  
José García ◽  
Rafael Guédez ◽  
Alessandro Sorce

Abstract Under new scenarios with high shares of variable renewable electricity, combined cycle gas turbines (CCGT) are required to improve their flexibility, in terms of ramping capabilities and part-load efficiency, to help balance the power system. Simultaneously, liberalization of electricity markets and the complexity of its hourly price dynamics are affecting the CCGT profitability, leading the need for optimizing its operation. Among the different possibilities to enhance the power plant performance, an inlet air conditioning unit (ICU) offers the benefit of power augmentation and “minimum environmental load” (MEL) reduction by controlling the gas turbine inlet temperature using cold thermal energy storage and a heat pump. Consequently, an evaluation of a CCGT integrated with this inlet conditioning unit including a day-ahead optimized operation strategy was developed in this study. To establish the hourly dispatch of the power plant and the operation mode of the inlet conditioning unit to either cool down or heat up the gas turbine inlet air, a mixed-integer linear optimization (MILP) was formulated using MATLAB, aiming to maximize the operational profit of the plant within a 24-hours horizon. To assess the impact of the proposed unit operating under this dispatch strategy, historical data of electricity and natural gas prices, as well as meteorological data and CO2 emission allowances price, have been used to perform annual simulations of a reference power plant located in Turin, Italy. Furthermore, different equipment capacities and parameters have been investigated to identify trends of the power plant performance. Lastly, a sensitivity analysis on market conditions to test the control strategy response was also considered. Results indicate that the inlet conditioning unit, together with the dispatch optimization, increases the power plant’s operational profit by achieving a wider operational range, particularly important during peak and off-peak periods. For the specific case study, it is estimated that the net present value of the CCGT integrated with the ICU is 0.5% higher than the power plant without the unit. In terms of technical performance, results show that the unit reduces the minimum environmental load by approximately 1.34% and can increase the net power output by 0.17% annually.


Author(s):  
S. Can Gülen

Duct firing in the heat recovery steam generator (HRSG) of a gas turbine combined cycle power plant is a commonly used method to increase output on hot summer days when gas turbine airflow and power output lapse significantly. The aim is to generate maximum possible power output when it is most needed (and, thus, more profitable) at the expense of power plant heat rate. In this paper, using fundamental thermodynamic arguments and detailed heat and mass balance simulations, it will be shown that, under certain boundary conditions, duct firing in the HRSG can be a facilitator of efficiency improvement as well. When combined with highly-efficient aeroderivative gas turbines with high cycle pressure ratios and concomitantly low exhaust temperatures, duct firing can be utilized for small but efficient combined cycle power plant designs as well as more efficient hot-day power augmentation. This opens the door to efficient and agile fossil fuel-fired power generation opportunities to support variable renewable generation.


1981 ◽  
Vol 103 (4) ◽  
pp. 772-775 ◽  
Author(s):  
Akifumi Hori ◽  
Kazuo Takeya

A new reheat gas turbine system is being developed as a national project by the “Engineering Research Association for Advanced Gas Turbines” of Japan. The machine consists of two axial flow compressors, three turbines, intercooler, combustor and reheater. The pilot plant is expected to go into operation in 1982, and a prototype plant will be set up in 1984. The major objective of this reheat gas turbine is application to a combined cycle power plant, with LNG burning, and the final target of combined cycle thermal efficiency is to be 55 percent (LHV).


Author(s):  
Stéphanie Hoffmann ◽  
Michael Bartlett ◽  
Matthias Finkenrath ◽  
Andrei Evulet ◽  
Tord Peter Ursin

This paper presents the results of an evaluation of advanced combined cycle gas turbine plants with precombustion capture of CO2 from natural gas. In particular, the designs are carried out with the objectives of high efficiency, low capital cost, and low emissions of carbon dioxide to the atmosphere. The novel cycles introduced in this paper are comprised of a high-pressure syngas generation island, in which an air-blown partial oxidation reformer is used to generate syngas from natural gas, and a power island, in which a CO2-lean syngas is burnt in a large frame machine. In order to reduce the efficiency penalty of natural gas reforming, a significant effort is spent evaluating and optimizing alternatives to recover the heat released during the process. CO2 is removed from the shifted syngas using either CO2 absorbing solvents or a CO2 membrane. CO2 separation membranes, in particular, have the potential for considerable cost or energy savings compared with conventional solvent-based separation and benefit from the high-pressure level of the syngas generation island. A feasibility analysis and a cycle performance evaluation are carried out for large frame gas turbines such as the 9FB. Both short-term and long-term solutions have been investigated. An analysis of the cost of CO2 avoided is presented, including an evaluation of the cost of modifying the combined cycle due to CO2 separation. The paper describes a power plant reaching the performance targets of 50% net cycle efficiency and 80% CO2 capture, as well as the cost target of 30$ per ton of CO2 avoided (2006 Q1 basis). This paper indicates a development path to this power plant that minimizes technical risks by incremental implementation of new technology.


Author(s):  
S. Abens ◽  
F. Eulitz ◽  
I. Harzdorf ◽  
M. Jaenchen ◽  
W. Fischer ◽  
...  

In response to the increasing world-wide need for reliable, lowest-cost and environmentally compatible generation of energy, Siemens Energy has developed a new generation of H-class gas turbines with a power of 530+ MW and an efficiency of more than 60% in combined-cycle. The SGT5-8000H has been developed based on an evolutionary innovation concept which can be characterized by a technology platform strategy and prior component pre-validation. To ensure that the new product line can be brought to market with extensive testing and operation experience under real power plant conditions, a comprehensive validation program was launched in December 2007 at the prototypical power plant in Irsching. The 18 month validation program consists of multiple measurement campaigns, covering the full operation range starting from the hot commissioning to a final endurance test in single-cycle configuration. To gain the required data for the validation, the SGT5-8000H prototype has been equipped with close to 3000 measuring sensors and an extensive data acquisition system. For the realization of the largest gas turbine validation program ever conducted by Siemens, innovation in various aspects of test execution and evaluation had to be realized. Dedicated teams are operating and monitoring the engine operation from on-site and from the world-wide engineering locations utilizing real-time data acquisition, monitoring and evaluation methods. This paper describes the infrastructure and settings of the validation program in terms of the testing scope, facilities, methods and tools.


Author(s):  
Colin F. McDonald

With the capability of burning a variety of fossil fuels, giving high thermal efficiency, and operating with low emissions, the gas turbine is becoming a major prime-mover for a wide spectrum of applications. Almost three decades ago two experimental projects were undertaken in which gas turbines were actually operated with heat from nuclear reactors. In retrospect, these systems were ahead of their time in terms of technology readiness, and prospects of the practical coupling of a gas turbine with a nuclear heat source towards the realization of a high efficiency, pollutant free, dry-cooled power plant has remained a long-term goal, which has been periodically studied in the last twenty years. Technology advancements in both high temperature gas-cooled reactors, and gas turbines now make the concept of a nuclear gas turbine plant realizable. Two possible plant concepts are highlighted in this paper, (1) a direct cycle system involving the integration of a closed-cycle helium gas turbine with a modular high temperature gas cooled reactor (MHTGR), and (2) the utilization of a conventional and proven combined cycle gas turbine, again with the MHTGR, but now involving the use of secondary (helium) and tertiary (air) loops. The open cycle system is more equipment intensive and places demanding requirements on the very high temperature heat exchangers, but has the merit of being able to utilize a conventional combined cycle turbo-generator set. In this paper both power plant concepts are put into perspective in terms of categorizing the most suitable applications, highlighting their major features and characteristics, and identifying the technology requirements. The author would like to dedicate this paper to the late Professor Karl Bammert who actively supported deployment of the closed-cycle gas turbine for several decades with a variety of heat sources including fossil, solar, and nuclear systems.


Author(s):  
F. Eulitz ◽  
B. Kuesters ◽  
F. Mildner ◽  
M. Mittelbach ◽  
A. Peters ◽  
...  

Siemens H-Class. Siemens has developed the world-largest H-class Gas Turbine (SGT™) that sets unparalleled standards for high efficiency, low life cycle costs and operating flexibility. With a power output of 340+ MW, the SGT5–8000H gas turbine will be the primary driver of the new Siemens Combined Cycle Power Plant (SCC™) for the 50 Hz market, the SCC5–8000H, with an output of 530+ MW at more than 60% efficiency. After extensive lab and component testing, the prototype has been shipped to the power plant for an 18-month validation phase. In this paper, the compressor technology, which was developed for the Siemens H-class, is presented through its development and validation phases. Reliability and Availability. The compressor has been extensively validated in the Siemens Berlin Test Facility during consecutive engine test programs. All key parameters, such as mass flow, operating range, efficiency and aero mechanical behavior meet or exceed expectations. Six-sigma methodology has been exploited throughout the development to implement the technologies into a robust design. Efficiency. The new compressor technology applies the Siemens advanced aerodynamics design methodology based on the high performance airfoil (HPA) systematic which leads to broader operation range and higher efficiency than a standard controlled diffusion airfoil (CDA) design. Operational Flexibility. The compressor features an IGV and three rows of variable guide vanes for improved turndown capability and improved part load efficiency. Serviceability. The design has been optimized for serviceability and less complexity. Following the Siemens tradition, all compressor rotating blades can be replaced without rotor lift or destacking. Evolutionary Design Innovation. The compressor design incorporates the best features and experience from the operating fleets and technology innovation prepared through detailed research, analysis and lab testing in the past decade. The design tools are based on best practices from former Siemens KWU and Westinghouse with enhancements allowing for routine front-to-back compressor 3D CFD multistage analysis, unsteady blade row interaction, forced response analyses and aero-elastic analysis.