A Midstream Pipeline Operator’s Perspective on the Implementation of API 1183

Author(s):  
Jeremiah Konell ◽  
Brian Dedeke ◽  
Chris Hurst ◽  
Shanshan Wu ◽  
Joseph Bratton

Abstract In preparation for the upcoming (currently in draft form) Recommended Practice (RP) on Dent Assessment and Management (API 1183) [1], Explorer Pipeline Company, Inc. (Explorer) has performed an internal procedural review to determine how to effectively implement the methodologies into their Integrity Management Program (IMP). Explorer’s pipeline system transports hazardous liquids and is comprised of over 1,800 miles of pipeline ranging in diameter from 3 to 28 inches. The majority of the system was installed in the 1970s, but parts of the system were also installed as early as the 1940s. The primary focus of this review and implementation into the IMP is in regard to performing and responding to in-line inspection (ILI) based integrity assessments. Prior to the development of API 1183, dent assessment and management consisted of following a set of prescriptive condition assessments outlined in the Code of Federal Regulations (CFR) Title 49, Part 195.452. In order to do this, pipeline operators required basic information, such as dent depth, orientation, and interaction with potential stress risers such as metal loss, cracks, gouges, welds, etc. However, in order to fully implement API 1183, additional parameters are needed to define the dent shape, restraint condition, defect interaction, and pipeline operating conditions. Many new and necessary parameters were identified throughout the IMP, from the very initial pre-assessment stage (new ILI vendor requirements as part of the tool/vendor selection process) all the way to defining an appropriate reassessment interval (new process of analyzing dent fatigue life). This paper summarizes the parameters of API 1183 that were not part of Explorer’s current IMP. The parameters are identified, and comments are provided to rank the level of necessity from “must have” to “beneficial” (e.g. can sound and conservative assumptions be made when a parameter is not available). Comments are also provided to explain the impact of applying assumptions in place of parameters. The table of identified parameters should provide a useful tool for other pipeline operators who are considering implementing API 1183 as part of their overall IMP.

Author(s):  
Brittany Goldsmith ◽  
Elizabeth Foyt ◽  
Madhu Hariharan

As offshore field developments move into deeper water, one of the greatest challenges is in designing riser systems capable of overcoming the added risks of more severe environments, complicated well requirements and uncertainty of operating conditions. The failure of a primary riser component could lead to unacceptable consequences, including environmental damage, lost production and possible injury or loss of human life. Identification of the risks facing riser systems and management of these risks are essential to ensure that riser systems operate without failure. Operators have recognized the importance of installing instrumentation such as global positioning systems (GPS), vessel motion measurement packages, wind and wave sensors and Acoustic Doppler Current Profiler (ADCP) units to monitor vessel motions and environmental conditions. Additionally, high precision monitoring equipment has been developed for capturing riser response. Measured data from these instruments allow an operator to determine when the limits of acceptable response, predicted by analysis or determined by physical limitations of the riser components, have been exceeded. Regular processing of measured data through automated routines ensures that integrity can be quickly assessed. This is particularly important following extreme events, such as a hurricane or loop current. High and medium alert levels are set for each parameter, based on design analysis and operating data. Measured data is compared with these alert levels, and when an alert level is reached, further response evaluation or inspection of the components in question is recommended. This paper will describe the role of offshore monitoring in an integrity management program and discuss the development of alert levels based on potential failure modes of the riser systems. The paper will further demonstrate how this process is key for an effective integrity management program for deepwater riser systems.


2010 ◽  
Vol 26 (02) ◽  
pp. 106-110
Author(s):  
Ge Wang ◽  
Michael Lee ◽  
Chris Serratella ◽  
Stanley Botten ◽  
Sam Ternowchek ◽  
...  

Real-time monitoring and detection of structural degradation helps in capturing the structural conditions of ships. The latest nondestructive testing (NDT) and sensor technologies will potentially be integrated into future generations of the structural integrity management program. This paper reports on a joint development project between Alaska Tanker Company, American Bureau of Shipping (ABS), and MISTRAS. The pilot project examined the viability of acoustic emission technology as a screening tool for surveys and inspection planning. Specifically, testing took place on a 32-year-old double-hull Trans Alaska Pipeline System (TAPS) trade tanker. The test demonstrated the possibility of adapting this technology in the identification of critical spots on a tanker in order to target inspections. This targeting will focus surveys and inspections on suspected areas, thus increasing efficiency of detecting structural degradation. The test has the potential to introduce new inspection procedures as the project undertakes the first commercial testing of the latest acoustic emission technology during a tanker's voyage.


Author(s):  
Scott D. Ironside ◽  
L. Blair Carroll

Enbridge Pipelines Inc. operates the world’s longest and most complex liquids pipeline network. As part of Enbridge’s Integrity Management Program In-Line Inspections have been and will continue to be conducted on more than 15,000 km of pipeline. The Inspection Programs have included using the most technologically advanced geometry tools in the world to detect geometrical discontinuities such as ovality, dents, and buckles. During the past number of years, Enbridge Pipelines Inc. has been involved in developing a method of evaluating the suitability of dents in pipelines for continued service. The majority of the work involved the development of a method of modeling the stresses within a dent using Finite Element Analysis (FEA). The development and validation of this model was completed by Fleet Technology Limited (FTL) through several projects sponsored by Enbridge, which included field trials and comparisons to previously published data. This model combined with proven fracture mechanics theory provides a method of determining a predicted life of a dent based on either the past or future operating conditions of the pipeline. CSA Standard Z662 – Oil and Gas Pipeline Systems provides criteria for the acceptability of dents for continued service. There have been occurrences, however, where dents that meet the CSA acceptability criteria have experienced failure. The dent model is being used to help define shape characteristics in addition to dent depth, the only shape factor considered by CSA, which contribute to dent failure. The dent model has also been utilized to validate the accuracy of current In-Line Inspection techniques. Typically a dent will lose some of its shape as the overburden is lifted from the pipeline and after the indentor is removed. Often there can be a dramatic “re-rounding” that will occur. The work included comparing the re-rounded dent shapes from a Finite Element model simulating the removal of the constraint on the pipe to the measured dent profile from a mold of the dent taken in the field after it has been excavated. This provided a measure of the accuracy of the tool. This paper will provide an overview of Enbridge’s dent management program, a description of the dent selection process for the excavation program, and a detailed review of the ILI validation work.


Author(s):  
Doug Langer ◽  
Sherif Hassanien ◽  
Janine Woo

Current regulations for prediction and management of potential delayed failures from existing pipeline dents rely primarily on depth and conservative assumptions related to threat interactions, which have shown limited correlation with industry failures. Such miscorrelation can lead to challenges in managing effectiveness and efficiency of pipeline integrity programs. Leading integrity techniques that entail detailed assessment of complex dent features rely on the use of finite element analysis, which tends to be inefficient for managing large pipeline systems due to prohibitively complex modeling and analysis procedures. While efforts are underway to improve dent assessment models across the industry, these often require significant detailed information that might not be available to operators; moreover, they suffer scattered model error which makes them susceptible to unclear levels of conservatism (or non-conservatism). Nevertheless, most techniques/models are deterministic in nature and neglect the effect of both aleatory and epistemic uncertainties. Operators typically utilize conservative assumptions based on subject matter experts’ opinions when planning mitigation programs in order to account for different types of uncertainties associated with the problem. This leads to inefficient dig programs (associated with significant costs) while potentially leaving dents on the pipeline which cannot be quantitatively risk assessed using current approaches. To address these concerns, the problem calls for a dent assessment framework that balances accuracy with the ability to assess dent and threat integration features at a system-wide level with available information in a practical timeframe that aligns with other integrity programs. This paper expands upon the authors’ previously published work regarding a fully quantitative reliability-based methodology for the assessment of dents interacting with stress risers. The proposed semi-quantitative reliability model leverages a strain-based limit state for plain dents (including uncertainty) with semi-quantitative factors used to account for complex geometry, stress riser interactions, and operating conditions. These factors are calibrated to reliability results from more detailed analysis and/or field findings in order to provide a simple, conservative, analytical-based ranking tool which can be used to identify features that may require more detailed assessment prior to mitigation. Initial validation results are provided alongside areas for continued development. The proposed model provides sufficient flexibility to allow it to be tailored/calibrated to reflect specific operator’s experience. The model allows for a consistent analysis of all types of dent features in a pipeline system in a short period of time to support prioritization of features while providing a base-level likelihood assessment to support calculation of risk. This novel development supports a dent management framework which includes multiple levels of analysis, using both deterministic and probabilistic techniques, to manage the threat of dents associated with stress risers across a pipeline system.


Author(s):  
Rafael G. Mora ◽  
Curtis Parker ◽  
Patrick H. Vieth ◽  
Burke Delanty

With the availability of in-line inspection data, pipeline operators have additional information to develop the technical and economic justification for integrity verification programs (i.e. Fitness-for-Purpose) across an entire pipeline system. The Probability of Exceedance (POE) methodology described herein provides a defensible decision making process for addressing immediate corrosion threats identified through metal loss in-line inspection (ILI) and the use of sub-critical in-line inspection data to develop a long term integrity management program. In addition, this paper describes the process used to develop a Corrosion In-line Inspection POE-based Assessment for one of the systems operated by TransGas Limited (Saskatchewan, Canada). In 2001, TransGas Limited and CC Technologies undertook an integrity verification program of the Loomis to Herbert gas pipeline system to develop an appropriate scope and schedule maintenance activities along this pipeline system. This methodology customizes Probability of Exceedance (POE) results with a deterministic corrosion growth model to determine pipeline specific excavation/repair and re-inspection interval alternatives. Consequently, feature repairs can be scheduled based on severity, operational and financial conditions while maintaining safety as first priority. The merging of deterministic and probabilistic models identified the Loomis to Herbert pipeline system’s worst predicted metal loss depth and the lowest safety factor per each repair/reinspection interval alternative, which when combined with the cost/benefit analysis provided a simplified and safe decision-making process.


Author(s):  
Garry L. Sommer ◽  
Brad S. Smith

Enbridge Pipelines Inc. operates one of the longest and most complex pipeline systems in the world. A key aspect of the Enbridge Integrity Management Program (IMP) is the trending, analysis, and management of data collected from over 50 years of pipeline operations. This paper/presentation describes Enbridge’s challenges, learnings, processes, and innovations for meeting today’s increased data management/integration demands. While much has been written around the premise of data management/integration, and many software solutions are available in the commercial market, the greatest data management challenge for mature pipeline operators arises from the variability of data (variety of technologies, data capture methods, and data accuracy levels) collected over the operating history of the system. Ability to bring this variable data set together is substantially the most difficult aspect of a coordinated data management effort and is critical to the success of any such project. Failure to do this will result in lack of user confidence and inability to gain “buy-in” to new data management processes. In 2001 Enbridge began a series of initiatives to enhance data management and analysis. Central to this was the commitment to accurate geospatial alignment of integrity data. This paper/presentation describes Enbridge’s experience with development of custom software (Integrated Spatial Analysis System – ISAS) including critical learnings around a.) Data alignment efforts and b.) Significant efforts involved in development of an accurate pipe centreline. The paper/presentation will also describe co-incident data management programs that link to ISAS. This includes enhanced database functionality for excavation data and development of software to enable electronic transfer of data to this database. These tools were built to enable rapid transfer of field data and “real time” tool validation through automated unity plots of tool defect data vs. that measured in the field.


Author(s):  
Robert V. Hadden ◽  
Kevin J. De Leenheer

As part of its Integrity Management Program, Trans Mountain Pipe Line hydrostatically tests sections of its pipeline system with water transported to test sites through the pipeline. After completion of the testing, the water continues through the pipeline to a water treatment facility where it is treated and discharged to the municipal sewer system. Hydrostatic testing of an operating pipeline, although simple in concept, is a major undertaking. This paper will outline the technical aspects of Trans Mountain’s hydrostatic testing program including: test water transportation, environmental constraints, coordination of test activities and water treatment.


Author(s):  
Hugo García ◽  
Carlos Nieves ◽  
Juan Diego Colonia

Oil pipelines systems for hydrocarbons transportation are linear projects that can reach great lengths. For this reason, theirs paths may cross different geological formations, soil types, navigable or torrential waters; and they may face geotechnical and hydrological instability problems such as creeping slopes, geological faults, landslides, scour and differential settling which causes different relative movements between the soil and the pipeline. The OCENSA (Oleoducto Central S.A) 30″ and 36″ diameter system was built in 1997 to transport crude oil from the eastern foothills of the Andes to the Caribbean Coast along some 830 km of the Eastern Andes mountains range and the spurs of the central Andes mountains range of Colombia: it was a major challenge to secure the integrity of the pipeline in the face of natural events.


Author(s):  
Miaad Safari ◽  
David Shaw

Abstract As integrity programs mature over the life of a pipeline, an increasing number of data points are collected from second, third, or further condition monitoring cycles. Types of data include Inline Inspection (ILI) or External Corrosion Direct Assessment (ECDA) inspection data, validation or remediation dig information, and records of various repairs that have been completed on the pipeline system. The diversity and massive quantity of this gathered data proposes a challenge to pipeline operators in managing and maintaining these data sets and records. The management of integrity data is a key element to a pipeline system Integrity Management Program (IMP) as per the CSA Z662[1]. One of the most critical integrity datasets is the repair information. Incorrect repair assignments on a pipeline can lead to duplicate unnecessary excavations in the best scenario and a pipeline failure in the worst scenario. Operators rely on various approaches to manage and assign repair data to ILIs such as historical records reviews, ILI-based repair assignments, or chainage-based repair assignments. However, these methods have significant gaps in efficiency and/or accuracy. Failure to adequately manage excavation and repair data can lead to increased costs due to repeated excavation of an anomaly, an increase in resources required to match historical information with new data, uncertainty in the effectiveness of previous repairs, and the possibility of incorrect assignment of repairs to unrepaired features. This paper describes the approach adopted by Enbridge Gas to track and maintain repairs, as a part of the Pipeline Risk and Integrity Management (PRIM) platform. This approach was designed to create a robust excavation and repair management framework, providing a robust system of data gathering and automation, while ensuring sufficient oversight by Integrity Engineers. Using this system, repairs are assigned to each feature in an excavation, not only to a certain chainage along the pipeline. Subsequently, when a new ILI results report is received, a process of “Repair Matching” is completed to assign preexisting repairs and assessments to the newly reported features at a feature level. This process is partially automated, whereby pre-determined box-to-box features matched between ILIs can auto-populate repairs for many of the repaired features. The proposed excavation management system would provide operators a superior approach to managing their repair history and projecting historical repairs and assessments onto new ILI reports, prior to assessing the ILI and issuing further digs on the pipeline. This optimized method has many advantages over the conventional repair management methods used in the industry. This method is best suited for operators that are embarking on their second or third condition monitoring cycle, with a moderate number of historical repairs.


Author(s):  
Luis A. Torres ◽  
Matthew J. Fowler ◽  
Jordan G. Stenerson

Integrity management of dents on pipelines is currently performed through the interpretation of In-Line Inspection (ILI) data; this includes Caliper, Magnetic Flux Leakage (MFL), and Ultrasonic Testing (UT) tools. Based on the available ILI data, dent features that are recognized as threats from a mechanical damage perspective are excavated and remediated. Federal codes and regulations provide rules and allow inference on what types of dent features may be a result of mechanical damage; nonetheless, there are challenges associated with identifying dents resulting from mechanical damage. One of the difficulties when managing the mechanical damage threat is the lack of information on how MFL and UT ILI tool performance is affected by dented areas in the pipe. ILI vendors do not offer any technical specifications for characterizing and sizing metal loss features in dents. It is generally expected that metal loss tool performance will be affected in dented areas of the pipe, but it is not known to what degree. It is likely that degradation will vary based on feature shape, sensor design, and sensor placement. Because metal loss tool performance is unknown within the limits of the dented pipe, other methods for recognizing mechanical damage have been incorporated into the management strategies of mechanical damage. Some of these methods include strain based assessments and characterization of shape complexity. In order to build a more effective integrity management program for mechanical damage, it is of critical importance to understand how tool technology performance is affected by dented areas in the pipe and what steps can be taken to use ILI information more effectively. In this paper, the effectiveness of MFL and UT wall measurement tools in characterizing and sizing metal loss features within dents is studied by evaluating against field results from non-destructive examinations of mechanical damage indications. In addition, the effectiveness of using shape complexity indicators to identify mechanical damage is evaluated, introducing concepts such as dents in close proximity and multi-apex dents. Finally, the effectiveness of ILI tools in predicting dent association with girth welds is also explored by comparing ILI and field results.


Sign in / Sign up

Export Citation Format