The increasing of the mining machines and equipment operation period

Author(s):  
R.P. Didyk ◽  
E.A. Masakovsky ◽  
S.V. Polyakov
2012 ◽  
Vol 226-228 ◽  
pp. 2217-2221 ◽  
Author(s):  
Cheng Shuang Sun ◽  
Qian Che

The operation phase is not only the longest stage of the life cycle of a project, but also the moment when people accumulates most information of the project. Because of the secular and complexity of property management during the operation period, and as there is large amount of information loss during the several periods before operation, it is very difficult to manage equipments all through the way. Based on the BIM technology, authors build a database of the equipment operation parameters to solve this problem. This paper realizes the real-time monitoring of the update of equipment information, equipment maintenance and fault handling during the operation stage. The research puts forward a new way to improve the standards of property management which will lead to a better economic benefits.


Author(s):  
S. R. Rakhmanov

In some cases, the processes of piercing or expanding pipe blanks involve the use of high-frequency active vibrations. However, due to insufficient knowledge, these processes are not widely used in the practice of seamless pipes production. In particular, the problems of increasing the efficiency of the processes of piercing or expanding a pipe blank at a piercing press using high-frequency vibrations are being solved without proper research and, as a rule, by experiments. The elaboration of modern technological processes for the production of seamless pipes using high-frequency vibrations is directly related to the choice of rational modes of metal deformation and the prediction resistance indicators of technological tools and the reliability of equipment operation. The creation of a mathematical model of the process of vibrating piercing (expansion) of an axisymmetric pipe blank at a piercing press of a pipe press facility is an actual task. A calculation scheme for the process of piercing a pipe plank has been elaborated. A dependence was obtained characterizing the speed of front of plastic deformation propagation on the speed of penetration of a vibrated axisymmetric mandrel into the pipe workpiece being pierced. The dynamic characteristics of the occurrence of wave phenomena in the metal being pierced under the influence of a vibrated tool have been determined, which significantly complements the previously known ideas about the stress-strain state of the metal in the deformation zone. The deformation fields in the zones of the disturbed region of the deformation zone were established, taking into account the high-frequency vibrations of the technological tool. It has been established that the choice of rational parameters (amplitude-frequency characteristics) of the vibration piercing process of a pipe blank results in significant increase in the efficiency of the process, the durability of the technological tool and the quality of the pierced blanks.


Author(s):  
N. S. Tsarev ◽  
V. I. Aksenov ◽  
I. I. Nichkova

To neutralize the waste pickling solutions and rinsing water, resulting from cleaning metal products s surface of rust by acids solutions, lime is used. Being cheap, this method of sewage neutralization has considerable drawbacks. Forming in the technological pipes strong gypsum depositions and low specific productivity of the equipment for sediment dewatering are most significant of them. Characteristic of aggressive industrial sewage, formed at pickling of ferrous metals presented. Methods of elimination of drawbacks of industrial sewage neutralization by lime considered, including stabilization of neutralized industrial sewage and control of properties of the sediment formed. It was noted, that stability of the circulating water can be provided by accelerating of crystallization of the forming gypsum sediments by introducing in it fine priming powder and heating the neutralized water up to 65-70 °С followed by thermal softening of a part of circulating water, removed out of the circulating system. It was shown, that the heating of the water and the ongoing changes of the composition and properties of the sediment result in decrease of filtration resistance 2-3 folds, increase of deposition speed 3-4 folds and decrease the sediment volume 1.5-2 folds comparing with lime neutralization in cold water. Calculated dozes of lime at the heating were taken the same as at the regular lime neutralization. Elimination of the circulating water oversaturation by bi-water gypsum can be reached also by addition into the water of powder-like gypsum pulp - priming powder for microcrystals of the gypsum, followed by aeration during 30-40 min. This method was tested under industrial conditions. Technological properties of the forming sediment can be improved by sediment treatment by flocculants and preliminary heating of the neutralized water up to 65-70 °С. Control of technological properties of the sediment is done by addition of flocculants and heating of the neutralized water. Recommendations for improving operation of the neutralization facilities presented with indicating particular technological parameters of the equipment operation for sewage and sediment treatment. 


Author(s):  
Paola Furcas ◽  
Rosanna Pastorelli ◽  
Giulia Salmini ◽  
Massimo Vanzi

Abstract High optical power is considered as the source of failures in passive optical elements. Optical connectors, in particular, have been studied because of the unavoidable exposure of their optical interfaces to environmental issues during insertion and extraction. Cleaning and insertion/extraction procedures are investigated. Evidence for burn-out, depending on the different procedures, calls for new suitable rules for handling during equipment operation and testing.


The analysis an influence of reflections from the underlying surface, atmospheric noise, the Earth’s surface, cosmic noise and signal attenuation of the signal the atmosphere, as well as the flight dynamics of the aircraft (AC) on the signal/noise ratio and, accordingly, on the accuracy of AC navigation definitions by using consumer equipment of the satellite radio navigation systems. The analysis an influence of reflections from the underlying surface on the equipment operation quality of the satellite radio navigation systems consumers is carried out by using the Beckman model, in accordance with the earth’s surface appears to consist of flat faces with an arbitrary slope. It is noted that reflections from the underlying surface have a greater effect on the quality of functioning of the consumer equipment of the satellite radio navigation systems in the tracking signal mode than in the detection mode. In this case, the influence of reflections increases with decreasing flight altitude and an increase in the angle of heel of the AC in the direction of the navigation spacecraft.


2020 ◽  
pp. 12-18
Author(s):  
F.A. Urazbahtin ◽  
A.YU. Urazbahtina

A multifactor mathematical model of the welding process of products from aluminum-magnesium alloys, consisting of 71 indicators that assess the quality of the weld, the welding process, costs, equipment operation and quality of the welded material. The model can be used to control and optimize the welding process of products from aluminum-magnesium alloys. Keywords welding, products, aluminum-magnesium alloy, indicators, process parameters, welding equipment, welding materials, electrode sharpening, lining [email protected]


2017 ◽  
Vol 68 (3) ◽  
pp. 581-585 ◽  
Author(s):  
Gabriela Oprina ◽  
Ladislau Radermacher ◽  
Daniel Lingvay ◽  
Dorian Marin ◽  
Andreea Voina ◽  
...  

The corrosion state of an underground metallic pipeline of �161 mm and 565 m length was assessed by specific electrical and electrochemical measurements. The investigated pipe, buried in 1997, was protected against corrosion by successive layers of bituminous material with a total thickness of 1 to 1.2 mm. The pipeline crosses three electrified railway lines (50 Hz - 28 kV), and then its route is approximately parallel to these lines; thus, the induced AC voltages between line and ground were calculated obtaining values between 4.05 and 7.1 Vrms, in good agreement with the values measured in the accessible points. The measurements regarding the insulation capacity against corrosion of the bituminous insulation, performed at one month and after 19 years of burial, showed an increase of the average cathode current density needed for obtaining the protection potential in the range �1.00 � �1.28 VCu/CuSO4 of approx. three times (from 6.65 up to 19.96 mA/m2), in good agreement with the evolution of the insulation resistance measured between the steel pipe (having a contact area with the ground of 270.5 m2) and a ground socket of 4 W, which decreased from 995 to 315 kW. Following the analysis and processing of the field collected data, it is considered that, by implementing a cheap cathodic protection system (without cathodic current power supply), based on the rectification of the AC induced voltage, the safe operation period of the investigated pipeline may be extended by at least 50 years.


2021 ◽  
Vol 73 (1) ◽  
Author(s):  
Hirotomo Noda ◽  
Hiroki Senshu ◽  
Koji Matsumoto ◽  
Noriyuki Namiki ◽  
Takahide Mizuno ◽  
...  

AbstractIn this study, we determined the alignment of the laser altimeter aboard Hayabusa2 with respect to the spacecraft using in-flight data. Since the laser altimeter data were used to estimate the trajectory of the Hayabusa2 spacecraft, the pointing direction of the altimeter needed to be accurately determined. The boresight direction of the receiving telescope was estimated by comparing elevations of the laser altimeter data and camera images, and was confirmed by identifying prominent terrains of other datasets. The estimated boresight direction obtained by the laser link experiment in the winter of 2015, during the Earth’s gravity assist operation period, differed from the direction estimated in this study, which fell on another part of the candidate direction; this was not selected in a previous study. Assuming that the uncertainty of alignment determination of the laser altimeter boresight was 4.6 pixels in the camera image, the trajectory error of the spacecraft in the cross- and/or along-track directions was determined to be 0.4, 2.1, or 8.6 m for altitudes of 1, 5, or 20 km, respectively.


Author(s):  
Dan Tian ◽  
Chun-Hui He

Pull-in instability occurs in a micro-electromechanical system, and it greatly hinders its normal operation. A fractal modification is suggested to make the system stable in all operation period. A fractal model is established using a fractal derivative, and the results show that by suitable fabrication of the micro-electromechanical system device, the pull-in instability can be converted into a novel state of pull-in stability.


Sign in / Sign up

Export Citation Format

Share Document