CONSTRUCTING A MODEL OF THE ROAD NETWORK (S. SUVOROV)

Author(s):  
Минкин ◽  
I. Minkin ◽  
Пышный ◽  
V. Pyshnyy

The article describes the preparation of input data and model building of the road network as a graph using the software and analytical complex Transnet

2021 ◽  
Vol 7 (2) ◽  
pp. 268-283
Author(s):  
V. N. Myachin ◽  
◽  
K. S. Borovikova ◽  
D. P. Krivtsov ◽  
◽  
...  

Constructing transport models is a relevant tool for solving various transport problems. The article discusses one of the important stages of creating a transport model — building a graph of a street-road network. The examples of the graphs of the street-road network of cities developed by the authors are presented. Special attention is paid to the features of road classification when developing a graph. The analysis of normative documents, in accordance with which a class is assigned to roads and streets in the Russian Federation, is carried out. Three ways of developing a road network graph are proposed. Methods for constructing a graph using data on the street-road network from the open cartographic source OSM are described in more detail. The main problems of applying each of the methods are outlined. The main problem is the discrepancy between the classification of roads from the OSM and the classification of roads of the Russian Federation adopted in the regulatory documents. Variants of simplifying the construction of the road network graph in the transport model are suggested.


2021 ◽  
Author(s):  
Pedro Batista ◽  
Peter Fiener ◽  
Simon Scheper ◽  
Christine Alewell

Abstract. The accelerated sediment supply from agricultural soils to riverine and lacustrine environments leads to negative off-site consequences. In particular, the sediment connectivity from agricultural land to surface waters is strongly affected by landscape patchiness and the linear structures that separate field parcels (e.g. roads, tracks, hedges, and grass-buffer-strips). Understanding the feedbacks between these structures and sediment transfer is therefore crucial for minimising off-site erosion impacts. Although soil erosion models can be used to understand lateral sediment transport patterns, model-based connectivity assessments are hindered by the uncertainty in model structures and input data. In particular, the representation of linear landscape features in numerical soil redistribution models is often compromised by the spatial resolution of the input data and the quality of the process descriptions. Here we adapted the WaTEM/SEDEM model using high resolution spatial data (2 m × 2 m) to analyse the sediment connectivity in a very patchy mesoscale catchment (73 km2) of the Swiss Plateau. Specifically, we used a global sensitivity analysis to explore model structural assumptions about how linear landscape features (dis)connect the sediment cascade. Furthermore, we compared model simulations of hillslope sediment yields from five sub-catchments to tributary sediment loads, which were calculated with long-term water discharge and suspended sediment measurements. Our results showed that roads were the main regulators of sediment connectivity in the catchment. In particular, the sensitivity analysis revealed that the assumptions about how the road network (dis)connects the sediment transfer from field-blocks to water courses had a much higher impact on modelled sediment yields than the uncertainty in model parameters. Moreover, model simulations showed a higher agreement with tributary sediment loads when the road network was assumed to directly connect sediments from hillslopes to water courses. Our results ultimately illustrate how a high-density road network combined with an effective drainage system increase sediment connectivity from hillslopes to surface waters in this representative catchment of the Swiss Plateau. This further highlights the importance of considering linear structures in soil erosion and sediment connectivity models.


2017 ◽  
Vol 11 (3) ◽  
pp. 255
Author(s):  
Jeky El Boru

Abstract: This research aims to analyze the impact of Janti Flyover Construction toward the growth of layout at Janti Urban Area, including structured space, open space, and linkage. Method used for data collecting are observation, air photograph monitoring, and interview, whereas the analysis method is qualitative description, which is the superimposed method of two layers, that are the layout condition before and after flyover construction. The result shows that the impact of Janti Flyover construction can be seen on building mass (solid), the increasing number of open spaces, including the road network, parking place, and park, whereas the relation between spaces, visually and structurally, can be seen on the growth of buildings which have new shapes and styles, therefore the performance of the overall building does not have a proportional shape. Considering Janti Street at the collective relation, its role is getting stronger as the main frame road network.Keywords: Flyover construction, layout changing, Janti AreaAbstrak: Penelitian ini bertujuan untuk menganalisis pengaruh pembangunan Jalan Layang Janti terhadap perkembangan tata ruang Kawasan Janti, meliputi ruang terbangun, ruang terbuka, serta hubungan antar ruang (“linkage”). Metode pengumpulan data dilakukan melalui observasi, pengamatan foto udara, dan wawancara; sedangkan metode analisis melalui deskripsi secara kualitatif yang berupa “superimposed method” dari dua lapisan kondisi lahan, yakni kondisi tata ruang sebelum dan sesudah pembangunan jalan layang. Hasil penelitian menunjukkan bahwa pengaruh pembangunan Jalan Layang Janti terdapat pada massa bangunan (“solid”), pertambahan ruang terbuka yang berupa jaringan jalan, parkir, dan taman; sedangkan pada hubungan antar ruang ̶ secara visual dan struktural ̶ yakni tumbuhnya bangunan dengan bentuk dan gaya baru, sehingga bentuk tampilan bangunan secara keseluruhan tidak proporsional. Pada hubungan kolektif, Jalan Janti semakin kuat perannya sebagai kerangka utama jaringan jalan.Kata kunci : Pembangunan jalan layang, tata ruang, Kawasan Janti


Author(s):  
Oleksandra Cherednichenko ◽  

The results of the study of the main elements of unobstructed space are presented and the compliance of the actual state with the regulatory requirements of measures to ensure a safe, comfortable, accessible and informative pedestrian zone of the road network is analyzed. A comparative analysis of the main regulatory requirements for access ramps on the legislation of Ukraine and the European Union is carried out.


2016 ◽  
Vol 167 (5) ◽  
pp. 294-301
Author(s):  
Leo Bont

Optimal layout of a forest road network The road network is the backbone of forest management. When creating or redesigning a forest road network, one important question is how to shape the layout, this means to fix the spatial arrangement and the dimensioning standard of the roads. We consider two kinds of layout problems. First, new forest road network in an area without any such development yet, and second, redesign of existing road network for actual requirements. For each problem situation, we will present a method that allows to detect automatically the optimal road and harvesting layout. The method aims to identify a road network that concurrently minimizes the harvesting cost, the road network cost (construction and maintenance) and the hauling cost over the entire life cycle. Ecological issues can be considered as well. The method will be presented and discussed with the help of two case studies. The main benefit of the application of optimization tools consists in an objective-based planning, which allows to check and compare different scenarios and objectives within a short time. The responses coming from the case study regions were highly positive: practitioners suggest to make those methods a standard practice and to further develop the prototype to a user-friendly expert software.


2019 ◽  
Vol 13 (3) ◽  
pp. 235-240
Author(s):  
Iryna Solonenko

The development of road network infrastructure is an important component of the economic development of the European Union. Updating of the road network contributes to the integration of the economies of countries into a coherent whole. The road network provides the free movement of citizens, the movement of goods and the effective implementation of various services. The increase in the length of the road network leads to an increase in the financial and material costs necessary to ensure its maintenance and repair. One of the ways to reduce costs is by strengthening the physic-mechanical and operational characteristics of the pavement due to the widespread use of cement concrete. The quality of the pavement of cement concrete depends largely on the rational selection of its composition. This allows a significant increase in the durability of road pavement. The purpose of the research was: the development of recommendations for the rational selection of the composition of the road pavement material of cement concrete, aimed at upgrading longevity, and taking into account its frost resistance grade. According to the goal, the following tasks were developed: the analyses of the climatic zones in which the road network of the European Union is located; the development of a research plan, a selection of the response function and influence factors; the study of physico-mechanical and operational characteristics of the researched material of road pavement; on the basis of the obtained data, the calculation of the complex of experimental-statistical models, which describe the physico-mechanical and operational characteristics of the road pavement material; on the basis of experimental statistical models, a method was proposed for selecting the rational compositions of the cement concrete pavement road material depending on the conditions of its application. The results presented in the article can be used in engineering and scientific practice for the selection of road pavement from cement concrete for highways.


Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-15 ◽  
Author(s):  
Tinggui Chen ◽  
Shiwen Wu ◽  
Jianjun Yang ◽  
Guodong Cong ◽  
Gongfa Li

It is common that many roads in disaster areas are damaged and obstructed after sudden-onset disasters. The phenomenon often comes with escalated traffic deterioration that raises the time and cost of emergency supply scheduling. Fortunately, repairing road network will shorten the time of in-transit distribution. In this paper, according to the characteristics of emergency supplies distribution, an emergency supply scheduling model based on multiple warehouses and stricken locations is constructed to deal with the failure of part of road networks in the early postdisaster phase. The detailed process is as follows. When part of the road networks fail, we firstly determine whether to repair the damaged road networks, and then a model of reliable emergency supply scheduling based on bi-level programming is proposed. Subsequently, an improved artificial bee colony algorithm is presented to solve the problem mentioned above. Finally, through a case study, the effectiveness and efficiency of the proposed model and algorithm are verified.


Sign in / Sign up

Export Citation Format

Share Document