scholarly journals Business Processes Outsourcing in Building Enterprises

2018 ◽  
Vol 7 (3.2) ◽  
pp. 59
Author(s):  
Iryna Chernysh ◽  
Alla Glebova ◽  
Oleh Maksymenko

The article explores the role and importance of outsourcing for managing business processes at enterprises of the construction industry. Since the main purpose of managing construction enterprises is to achieve high technical and economic indicators, compliance with the terms of construction of objects and their construction, ensuring an increase in profitability and profitability of operations in the long-term perspective. This is possible with the use of outsourcing, which, unlike subcontracting, is aimed at providing profitability by concentrating on the performance of priority activities for which the construction company has the highest level of competence. Also, outsourcing involves taking risks and responsibilities of an outsourcing company for the quality of running business processes. This is a significant difference from the subcontract works and allows forming the long-term competitive advantages of the construction enterprise.  

2018 ◽  
Vol 193 ◽  
pp. 05006 ◽  
Author(s):  
Margarita Panteleeva ◽  
Svetlana Borozdina

This article is dedicated to the problem of the lack of a systematic approach in the creation of financial and business plans at construction enterprises. The current policy in the field of long-term management does not imply the existence of a strictly regulated procedure. As a rule, this process each time has a new structure and a new toolkit. And given the current trend towards clustering in the construction sector, such a situation could adversely affect the further development of the entire industry. The article suggests a description of the multi-level management system of a construction enterprise. This system is based on comprehensive programs that allow, through a centralized management function, to streamline the process of solving the basic tasks facing the construction company in the framework of the entire construction industry. The program method proposed by the authors is an addition to the already used planning methods and allows to overcome the difficulties that arise in connection with the territorial concentration of the construction complex.


2020 ◽  
Vol 2 (8) ◽  
pp. 70-75
Author(s):  
M. V. RAKHOVA ◽  
◽  
I. I. SAVEL’EV ◽  

The main issues of quality management in the construction industry and their role in the company are highlighted in the article. The main subsystems of quality management are defined. The grouping of the most significant risks in construction from the point of view of quality assurance of documentary, personnel, material and technical support is conducted. The necessity of joint formation of quality management and risk management systems for the purpose of effective and long-term functioning of construction enterprises has been argued.


2021 ◽  
Vol 2 (47) ◽  
pp. 40-47
Author(s):  
I.О. Shaposhnikova

The article is devoted to the analysis of modern aspects of innovative activities of construction companies. The problems of introducing innovations, which construction enterprises are faced with today, have been investigated; the impact of the identified problems on the activities of enterprises in the construction industry is noted; attention is paid to the organization of activities, management methods, search for sources of funding for innovations and assessment of the effectiveness of their implementation. The priorities for the further development of enterprises in the construction industry and the main strategic steps in the implementation of innovations have been determined. Attention is focused on the need to introduce innovations into the activities of the enterprise to ensure stable competitiveness. It is noted that among the methods of effective management of innovations, it is necessary to focus on those that will allow the construction company to improve its competitive position in the market. The advantages of introducing innovations into the activities of construction enterprises are analyzed. The main directions of innovative development in the construction industry and the types of innovations in terms of functional orientation have been determined. It is proposed to develop projects for innovative development of enterprises, taking into account the latest world developments in the construction industry. The necessity of conducting economic assessment and risks when introducing innovations has been substantiated. The specified sources of financing for innovative projects, both state and at the enterprise level. The sources of financing the innovative activity of industrial enterprises for five years, as well as the number of applications for utility models in the direction of "construction" are analyzed. The main methods of organizing the innovative activity of a construction enterprise are considered. The sequence of actions for the implementation of innovative development in the activities of construction enterprises has been determined. The main risk factors that enterprises face when introducing innovations into their activities have been identified. The main principles of the risk management system for the innovative development of the enterprise have been determined, should be aimed at mitigating the impact of risks on the final results of the enterprise.


2014 ◽  
Vol 13 (4) ◽  
pp. 399-406
Author(s):  
Elżbieta Radziszewska-Zielina

In construction industry partnering is a long-term commitment between two or more organizations aimed at achieving particular business objectives by maximizing the effectiveness of each participant’s resources. As opposed to competition, partnering is characterized by cooperation rather than rivalry which may transform into fighting. Partners cooperate, striving for the implementation of a construction project, which is their common objective, and for mutual benefits. The present author has developed a research model of the partnering relations of construction enterprises. This paper presents a non-standard application of AHP multi-criteria method in choosing a construction enterprise for partnering cooperation during the construction project implementation.


2019 ◽  
Vol 28 (2) ◽  
pp. 299-306
Author(s):  
Jarosław Górecki

A construction project shapes the natural environment of human beings throughout its life cycle. Therefore, problems related to the ecological quality of the applied solutions require special interest. A method of solving these problems can be directly related to stakeholders involved in the projects. The role of a construction company in the context of decision making problems, and in particular its ecological responsibility, has become one of the fundamental elements of the genesis of this research. Linking ecological maturity of the stakeholders participating in the implementation of construction projects, and taking into account the environment friendly approach, related to the scarce resource management and the possibility of reducing their environmental impact, became the main goal of the article. The detailed objectives of the conducted research can be connected with promoting eco-friendly strategies among construction companies and increasing the awareness of construction entrepreneurs about the current EU requirements regarding the environmental issues of business. There is also a need for building ecological maturity of construction companies. Research conducted among the management staff of construction companies allowed to specify some factors of the ecological maturity in construction enterprise (EMCE) and their priorities.


2021 ◽  
pp. 000313482198905
Author(s):  
John A. Perrone ◽  
Stephanie Yee ◽  
Manrique Guerrero ◽  
Antai Wang ◽  
Brian Hanley ◽  
...  

Introduction After extensive mediastinal dissection fails to achieve adequate intra-abdominal esophageal length, a Collis gastroplasty(CG) is recommended to decrease axial tension and reduce hiatal hernia recurrence. However, concerns exist about staple line leak, and long-term symptoms of heartburn and dysphagia due to the acid-producing neoesophagus which lacks peristaltic activity. This study aimed to assess long-term satisfaction and GERD-related quality of life after robotic fundoplication with CG (wedge fundectomy technique) and to compare outcomes to patients who underwent fundoplication without CG. Outcomes studied included patient satisfaction, resumption of proton pump inhibitors (PPI), length of surgery (LOS), hospital stay, and reintervention. Methods This was a single-center retrospective analysis of patients from January 2017 through December 2018 undergoing elective robotic hiatal hernia repair and fundoplication. 61 patients were contacted for follow-up, of which 20 responded. Of those 20 patients, 7 had a CG performed during surgery while 13 did not. There was no significant difference in size and type of hiatal hernias in the 2 groups. These patients agreed to give their feedback via a GERD health-related quality of life (GERD HRQL) questionnaire. Their medical records were reviewed for LOS, length of hospital stay (LOH), and reintervention needed. Statistical analysis was performed using SPSS v 25. Satisfaction and need for PPIs were compared between the treatment and control groups using the chi-square test of independence. Results Statistical analysis showed that satisfaction with outcome and PPI resumption was not significantly different between both groups ( P > .05). There was a significant difference in the average ranks between the 2 groups for the question on postoperative dysphagia on the follow-up GERD HRQL questionnaire, with the group with CG reporting no dysphagia. There were no significant differences in the average ranks between the 2 groups for the remaining 15 questions ( P > .05). The median LOS was longer in patients who had a CG compared to patients who did not (250 vs. 148 min) ( P = .01). The LOH stay was not significantly different ( P > .05) with a median length of stay of 2 days observed in both groups. There were no leaks in the Collis group and no reoperations, conversions, or blood transfusions needed in either group. Conclusion Collis gastroplasty is a safe option to utilize for short esophagus noted despite extensive mediastinal mobilization and does not adversely affect the LOH stay, need for reoperation, or patient long-term satisfaction.


2020 ◽  
Vol 4 (Supplement_1) ◽  
pp. 185-185
Author(s):  
Rachel McPherson ◽  
Barbara Resnick ◽  
Elizabeth Galik

Abstract Communication and interactions are an integral part of care in long-term care settings. Resident variables, such as race and gender, shape communication and interaction between staff and residents. The Quality of Interactions Schedule (QuIS) was developed to measure the quality of verbal and nonverbal interactions among nursing staff and older adults initially for those in acute care and later used as well in a variety of long term care settings. A quantified measurement of the quality of interactions between residents and staff was created to quantify the QuIS. The purpose of this study was to describe the gender and racial differences in scored quality of interactions. Data for the present study was based on baseline data from the Evidence Integration Triangle for Behavioral and Psychological Symptoms of Dementia (EIT-4-BPSD) implementation study. A total of 535 residents from 55 settings were included in the analyses. An analysis of covariance was conducted to determine a difference in QuIS scores between males and females while controlling for age. The second model tested for differences in QuIS scores between blacks and whites while controlling for age and gender. There was not a statistically significant difference in QuIS scores between male and female residents. There was a significant difference in QuIS scores between those who were black versus white, such that those who were black received more positive interactions from staff than those who were white. Future work should focus on a deeper examination of resident factors and staff factors that may influence these interactions.


Hernia ◽  
2021 ◽  
Author(s):  
M. M. J. Van Rooijen ◽  
T. Tollens ◽  
L. N. Jørgensen ◽  
T. S. de Vries Reilingh ◽  
G. Piessen ◽  
...  

Abstract Introduction Information on the long-term performance of biosynthetic meshes is scarce. This study analyses the performance of biosynthetic mesh (Phasix™) over 24 months. Methods A prospective, international European multi-center trial is described. Adult patients with a Ventral Hernia Working Group (VHWG) grade 3 incisional hernia larger than 10 cm2, scheduled for elective repair, were included. Biosynthetic mesh was placed in sublay position. Short-term outcomes included 3-month surgical site occurrences (SSO), and long-term outcomes comprised hernia recurrence, reoperation, and quality of life assessments until 24 months. Results Eighty-four patients were treated with biosynthetic mesh. Twenty-two patients (26.2%) developed 34 SSOs, of which 32 occurred within 3 months (primary endpoint). Eight patients (11.0%) developed a hernia recurrence. In 13 patients (15.5%), 14 reoperations took place, of which 6 were performed for hernia recurrence (42.9%), 3 for mesh infection (21.4%), and in 7 of which the mesh was explanted (50%). Compared to baseline, quality of life outcomes showed no significant difference after 24 months. Despite theoretical resorption, 10.7% of patients reported presence of mesh sensation in daily life 24 months after surgery. Conclusion After 2 years of follow-up, hernia repair with biosynthetic mesh shows manageable SSO rates and favorable recurrence rates in VHWG grade 3 patients. No statistically significant improvement in quality of life or reduction of pain was observed. Few patients report lasting presence of mesh sensation. Results of biosynthetic mesh after longer periods of follow-up on recurrences and remodeling will provide further valuable information to make clear recommendations. Trial registration Registered on clinicaltrials.gov (NCT02720042), March 25, 2016.


2012 ◽  
Vol 25 (4) ◽  
pp. 46-64 ◽  
Author(s):  
Soni Agrawal ◽  
Kishor Goswami ◽  
Bani Chatterjee

Firms from developed countries are increasingly offshore outsourcing services to developing countries to have cost as well competitive advantages. Although this is a growing practice, there has been limited empirical attention in understanding the outsourcing phenomenon, particularly from the perspective of service provider firms that execute important business processes for their overseas clients. Despite growing trends to outsource, only a few service provider firms report success. This puts the service provider firms under increasing pressure to add value and improve quality of relationship. They have to depend not only on tangible factors but some intangible factors also play an important role in their performance. In this paper, the authors try to find out factors that influence performance of service provider firms. Multiple regressions using four indicators of firm performance are carried out to see the influence of certain factors on information technology enabled service (ITES) firms’ performance.


2004 ◽  
Vol 10 (4) ◽  
pp. 135-141 ◽  
Author(s):  
Romualdas Ginevičius ◽  
Valentinas Podvezko ◽  
Algirdas Andruškevičius

The successful performance of construction enterprises as well as their competitiveness are largely determined by the construction technology and management methods used. In this respect two levels referring to a building or structure itself and to a construction enterprise as a whole should be distinguished. The technology of a building or structure embraces its construction system generally characterizing building materials, design solutions and load‐bearing structures and enclosures used in the construction of this particular building. The problem of selecting a general technological criterion for the whole construction enterprise arises. A construction enterprise fulfilling its annual program can simultaneously construct buildings and structures based on various construction systems, i.e. it can use various technologies. Searching for an integrated criterion to describe an enterprise as a whole three main issues including the variation of the applied technologies and their volumes and technological effectiveness should be taken into consideration. In the paper the problem of determining technological effectiveness of construction systems is considered. A method of pairwise comparison developed by T. Saaty was used to address this problem. The calculations were made for all thirteen technologies currently used in Lithuanian construction industry. Based on the suggested approach the weight of technological effectiveness was determined for each of them in the parts of one.


Sign in / Sign up

Export Citation Format

Share Document