scholarly journals Research on construction technology of road subgrade and bridge engineering

Author(s):  
Shicai Zhang ◽  
Jinwei Zhang ◽  
Xijie Yang ◽  
Lihua Zhao ◽  
Chenghai Zhao

In recent years, China's economic level has made rapid progress. The construction industry occupies a large proportion in the overall economy, and people pay more and more attention to the construction of various projects. The quality of construction projects is directly related to the safety of people's lives and property, which puts forward higher and higher requirements for the construction technology level. As we all know, road subgrade and bridge engineering have certain complexity, and construction takes time and construction environment is bad. In recent years, with the increase in the number of relevant projects, more and more problems have emerged. This article analyzes the construction technology of road subgrade and bridge engineering, focuses on the key technologies in construction, and makes the project construction as much as possible to meet the needs of human production and living.

2018 ◽  
Vol 2 (3) ◽  
Author(s):  
Shicai Zhang ◽  
Jinwei Zhang ◽  
Xijie Yang ◽  
Lihua Zhao ◽  
Chenghai Zhao

In recent years, China's economic level has made rapid progress. The construction industry occupies a large proportion in the overall economy, and people pay more and more attention to the construction of various projects. The quality of construction projects is directly related to the safety of people's lives and property, which puts forward higher and higher requirements for the construction technology level. As we all know, road subgrade and bridge engineering have certain complexity, and construction takes time and construction environment is bad. In recent years, with the increase in the number of relevant projects, more and more problems have emerged. This article analyzes the construction technology of road subgrade and bridge engineering, focuses on the key technologies in construction, and makes the project construction as much as possible to meet the needs of human production and living.


2017 ◽  
Vol 1 (3) ◽  
Author(s):  
Zhang Wei

At the present stage, China's construction industry has achieved rapid development with the rapid development of our society and economy. In the construction of our country's construction industry, scientific and rational project construction management can not only effectively improve the safety quality of construction workers, strengthen the personnel management of construction workers, effectively reduce the accidents of construction projects, but also can save the cost of construction projects and improve the economic efficiency of construction enterprises to the greatest extent. In view of this, this paper first analyzes the existing problems in the management of industrial and civil construction site and puts forward corresponding solutions.


Author(s):  
Peter Dodzi Kwasi Agbaxode ◽  
Sitsabo Dlamini ◽  
Ehsan Saghatforoush

A meta-synthesis approach was used to identify, synthesize, and categorize appropriately factors in the literature that contribute to design documentation quality. The categories include factors on quality attributes, quality indicators, and quality-influencing factors. Findings indicate that the quality of design documentation in practice is unsatisfactory, therefore, there is a need for collaboration between the owner, designers, and end-users to improve design documentation quality. The results offer pragmatic data on design documentation quality in the construction industry between the years 1992 and 2019. However, further research on the significant impacts of poor-quality design documentation on construction projects is recommended.


2020 ◽  
Vol 9 (1) ◽  
pp. 1
Author(s):  
Qian Yang

<p>With the rapid development of social economy, the demand for new energy is also increasing, and then the problem of large consumption also has a negative impact on the development of the construction industry. Under the concept of green building, the design and construction units pay more attention to energy conservation and environmental protection, so they actively use photovoltaic new energy in the field of electrical energy conservation of construction projects, so as to improve people's quality of life. Starting from the principles and characteristics of building electrical energy conservation, this paper discusses the methods of building electrical energy conservation, and analyzes how to use photovoltaic new energy in the field of building electrical energy conservation, hoping to better practice the concept of energy conservation.</p>


2018 ◽  
Vol 44 ◽  
pp. 00057
Author(s):  
Xeniya Malinina ◽  
Juriy Shamara ◽  
Zhanna Petukhova

In this article we carry out the analysis of the possible directions and consequences of transformations of the existing models for implementation of investment-construction projects in relation with integration of information technologies and the construction industry in modern Russia. Such integration is considered as the most useful tool to solve such chronicle problems of the construction industry as low quality of works, missed deadlines and sustaining the best ratio “price-quality” for the customer. The basis for such integration is the technologies of informational modeling of construction objects. We investigated two basic models: disintegrated purchases and integrated purchases whose transformation will be directed towards development of mechanisms of partnership between participants of investment-construction projects, expanded use of “integrated” contracts in the system of state purchases of construction works and further centralization of control in the system of construction for state purposes.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2014 ◽  
Vol 681 ◽  
pp. 222-228
Author(s):  
Shou Tao Yao ◽  
Wei Cheng Zhao ◽  
Qun Cheng

High-rise super large aerial platform project construction has been a greater danger, How to ensure the quality of components assembled and the safety of the construction project is worthy of study. Through finite element analysis on construction conditions of steel structures, ensures the hydraulic synchronous lifting and construction technology of high-altitude hoisting and assembly, greatly reduced the difficulty of installation, quality, safety, cost, schedule is guaranteed.


2007 ◽  
Vol 34 (1) ◽  
pp. 19-36 ◽  
Author(s):  
Yasemin Nielsen ◽  
Bilge Erdogan

Quality of communication is a key factor in the success of construction projects. Visualization technologies can play an important role in improving the quality of data by improving human comprehension and increasing the depth of the information delivered. Visualization has for some time been identified as one of the major technology themes allowing development of construction processes. However, visualization has not been embraced as a strategic tool by construction companies, and they generally fail to take full advantage of available visualization tools. This paper aims to evaluate the extent of visualization as a communication tool in the construction industry and to determine potential benefits to be gained through implementation of visualization. The current state of the use of visualization for communication in Turkish architecture, engineering, and construction companies is mapped through surveys and interviews. Information flow contents and types are analysed to determine the types of information in the construction process that may benefit from visual representation. According to the priorities of the expectations ranked by the users and the potential of different visualization tools, the level of visualization required for each data flow is determined by a quality function deployment (QFD) based approach.Key words: visualization, construction, visual communication, quality.


The article substantiates the feasibility of developing and implementing a risk management plan for the implementation of construction projects in the conditions of compacted construction on the basis of risk identification at the stages of development of projects of organization and construction technology. The risk management algorithm is given. Design of construction of structures in conditions of compacted development usually requires consideration of many factors (risks) that affect the safety and quality of construction, but, as a rule, the most significant risks arise in the construction of the deepened part of the structure - "zero cycle". With this in mind, a Risk Management Plan for the construction of the "zero cycle" is proposed and emphasis is placed on the need to develop a strategy for the protection of the surrounding area and buildings. The conditions for achieving optimal efficiency of the Risk Management Plan are determined.


2020 ◽  
Vol 5 (9) ◽  
pp. 1049-1053
Author(s):  
Onyekachukwu G. Odenigbo ◽  
Koleola T Odusami ◽  
Kevin C. Okolie ◽  
Vincent C. Okafor

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.