Abstract Assurance of well integrity is critical and important throughout the entire well's life cycle. Pressure build-up between cemented casings annuli has been a major challenge all around the world. Cement is the main element that provides isolation and protection for the well. The cause for pressure build-up in most cases is a compromise of cement sheath integrity that allows fluids to migrate through micro-channels from the formation all the way to the surface. These problems prompt cementing technologists to explore new cementing solutions, to achieve reliable long-term zonal isolation in these extreme conditions by elevating shear bond strength along-with minimal shrinkage. The resin-cement system can be regarded as a novel technology to assure long term zonal isolation. This paper presents case histories to support the efficiency and reliability of the resin-cement system to avoid casing to casing annulus (CCA) pressure build-up. This paper presents lab testing and application of the resin-cement system, where potential high-pressure influx was expected across a water-bearing formation. The resin-cement system was designed to be placed as a tail slurry to provide a better set of mechanical properties in comparison to a conventional slurry. The combined mixture of resin and cement slurry provided all the necessary properties of the desired product. The slurry was batch-mixed to ensure the homogeneity of resin-cement slurry mixture. The cement treatment was performed as designed and met all zonal isolation objectives. Resin-cement’s increased compressive strength, ductility, and enhanced shear bond strength helped to provide a dependable barrier that would help prevent future sustained casing pressure (SCP). The producing performance of a well depends in great part on a good primary cementing job. The success of achieving zonal isolation, which is the main objective of cementing, is mainly attributed to the cement design. The resin-cement system is evolving as a new solution within the industry, replacing conventional cement in many crucial primary cementing applications. This paper highlights the necessary laboratory testing, field execution procedures, and treatment evaluation methods so that this technology can be a key resource for such operations in the future. The paper describes the process used to design the resin-cement system and how its application was significant to the success of the jobs. By keeping adequate strength and flexibility, this new cement system mitigates the risk of cement sheath failure throughout the life of well. It provides a long-term well integrity solution for any well exposed to a high-pressure environment.

2021 ◽  
Author(s):  
Vikrant Wagle ◽  
Abdullah Saleh Al-Yami ◽  
Sara AlKhalaf ◽  
Khawlah Abdulaziz Alanqari ◽  
Wajid Ali ◽  
...  

Abstract A good primary cementing job governs in a great part the producing performance of a well. Successful zonal isolation, which is the main objective of any cementing job, primarily depends on the right cement design. The resin-based cement system, which is a relatively new technology within the oil industry has the potential to replace conventional cement in critical primary cementing applications. This paper describes the lab-testing and field deployment of the resin-based cement systems. The resin-based cement systems were deployed in those well sections where a potential high-pressure influx was expected. The resin-based cement system, which was placed as a tail slurry was designed to have better mechanical properties as compared to the conventional cement systems. The paper describes the process used to get the right resin-based cement slurry design and how its application was important to the success of the cementing jobs. The cement job was executed successfully and met all the zonal-isolation objectives. The resin-based cement's increased shear bond strength and better mechanical properties were deemed to be instrumental in providing a reliable barrier that would thwart any future issues arising due to sustained casing pressure (SCP). This paper describes the required lab-testing, lab-evaluation, and the successful field deployment of the resin-based cement systems.


SPE Journal ◽  
2017 ◽  
Vol 22 (05) ◽  
pp. 1681-1689 ◽  
Author(s):  
Narjes Jafariesfad ◽  
Mette Rica Geiker ◽  
Pål Skalle

Summary The bulk shrinkage of cement sheaths in oil wells can result in loss of long-term zonal isolation. Expansive additives are used to mitigate bulk shrinkage. To compensate effectively for bulk shrinkage during the late plastic phase and the hardening phase of the cement system, the performance of the expansive additive needs to be regulated considering the actual cement system and placement conditions. This paper presents an introductory investigation on the potential engineering of nanosized magnesium oxide (MgO) (NM) through heat treatment for use as an expansive agent in oilwell-cement systems. In this study, the bulk shrinkage of a cement system was mitigated by introducing NM with designed reactivity to the fresh cement slurry. The reactivity of NM was controlled by heat treatment. A dilatometer with corrugated molds was used to measure the linear strain of samples cured at 40°C and atmospheric pressure. The effect of NMs differing in reactivity on tensile properties of cement systems cured for 3 days at 40°C was examined by use of the flattened Brazilian test. The reactivity of the NM played a key role in controlling the bulk shrinkage of the cement system. Addition of only 2% NM by weight of cement (BWOC) with appropriate reactivity was sufficient to maintain expansion of the cement system. Adding NM to the cement system also resulted in improved mechanical flexibility. The NM with highest reactivity caused the largest reduction in Young's modulus at 3 days and, in general, the ratio of tensile strength to Young's modulus improved through the addition of NM to the cement system. Our work demonstrates that controlling the reactivity of the additive is a promising method to mitigate bulk shrinkage of cement systems and thereby to sustain the mechanical properties of the cement sheath in the oil well at an acceptable level.


2021 ◽  
Author(s):  
Amanmammet Bugrayev ◽  
Ravindra Kumar Singh ◽  
Svetlana Nafikova ◽  
Ilshat Akhmetzianov ◽  
Guvanch Gurbanov ◽  
...  

Abstract Long-term well integrity and zonal isolation are the ultimate objectives for cementing in the well construction process. Effective mud removal plays an essential role in obtaining competent zonal isolation and hence should not be overlooked and underestimated. The negative consequences of poor mud removal can lead to microannulus, channeling, or gas migration, which might require costly time-consuming remediation. The conventional approach of optimizing spacers based on chemical interactions with the mud layer does not always yield desired results and, thus, demanding further improvement. In this paper we discuss the approach taken to boost the mud removal efficiency by implementing an innovative engineered scrubbing spacer containing fibers in a challenging environment, resulting in notable improvement in long-term cement sheath integrity. The engineered scrubbing fibers were thoroughly tested in the laboratory to ensure spacer stability and efficiency. The new spacer with an additional scrubbing capability was introduced to one of the major operators on the Caspian shelf and after successful implementation, it has now been used on more than 20 cementing operations. Scrubbing fibers concentration was optimized through thorough laboratory testing covering flowability, dispersibility, and mud removal efficiency; later, it was applied on most of the cement operations, including 4½-in. liners characterized by a very narrow annular gap across the hanger sections. Cement evaluation log results from those cementing operations demonstrated an improvement in mud removal efficiency, suggesting no issues associated with microannulus, channeling, or gas migration, thus confirming the effectiveness of the newly implemented engineered scrubbing spacer. The typical challenges associated with meeting the zonal isolation requirement on one of the offshore fields of the Caspian shelf, and the success of the approach taken to overcome those challenges by implementing the new engineered scrubbing spacer are discussed. The comparison of cement bond evaluation log results of the jobs where conventional spacer systems were used vs. those where the spacer with scrubbing capability was used are also presented, demonstrating the clear difference and improvement.


2021 ◽  
Author(s):  
Mohammad Arif Khattak ◽  
Agung Arya Afrianto ◽  
Bipin Jain ◽  
Sami Rashdi ◽  
Wahshi Khalifa ◽  
...  

Abstract Portland cement is the most common cement used in oil and gas wells. However, when exposed to acid gases such as carbon dioxide (CO2) and hydrogen sulfide (H2S) under downhole wet conditions, it tends to degrade over a period of time. This paper describes the use of a proprietary novel CO2 and H2S resistant cement system to prevent degradation and provide assurance of long-term wellbore integrity. The CO2-resistant cement was selected for use in one of the fields in Sultanate of Oman after a well reported over 7% CO2 gas production resulting in well integrity failure using conventional cements. The challenge intensified when the well design was modified by combining last two sections into one long horizontal section extending up to 1,600 m. The new proposed cement system was successfully laboratory- tested in a vigorous CO2 environment for an extended period under bottomhole conditions. Besides selecting the appropriate chemistry, proper placement supported by advanced cement job simulation software is critical for achieving long-term zonal isolation. The well design called for a slim hole with 1,600 m of 4 ½-in liner in a 6-in horizontal section where equivalent circulating density (ECD) management was a major challenge. An advanced simulation software was used to optimize volumes, rheologies, pumping rates, and ECDs to achieve the desired top of cement. The study also considered a detailed torque and drag analysis in the horizontal section, and fit- for-purpose rotating-type centralizers were used to help achieve proper cement coverage. To date, this cement system has been pumped in 32 wells, including 24 with 6-in slimhole horizontal sections with no reported failures. The paper emphasizes the qualification and successful implementation of fit-for-purpose design of CO2- and H2S-resistant cement as well as optimized execution and placement procedures to achieve long-term zonal isolation and well integrity in a complex slimhole horizontal well design.


2014 ◽  
Author(s):  
V.. Reveth ◽  
R.. Giron Rojas ◽  
N.. Gupta ◽  
E.. Gonzaga

Abstract In a deepwater environment, any remedial operation has a high impact on the overall costs during the life of the wells. The zonal isolation can be compromised due to the exposure of the well's main components (casing and cement) to the changes in the stress conditions. The changes in wellbore conditions can occur during the drilling, production, intervention, and decommissioning stages. Typically, conditions such as fluid pathway and high formation pressure are sufficient to lose zonal isolation. The fluid pathway can be a fissure, an induced crack in the cement sheath, a mud channel, a micro-microannulus, or changes in the cement matrix permeability. As a result of the oil industry technology developments, progresses, the advanced stress-modelling software and the availability of cement and rock properties property data have enabled to an improved understanding of the cement behavior under stress. Prevention of the loss of the hydraulic isolation provided by the primary cementing in the annulus can be assessed by predicting the mechanical failure of the cement sheath. Formation geo-mechanics is one of the main factors that help in designing a robust cement system for changing stresses. Furthermore, the consequence result of the cement sheath failure can be mitigated by the placement of placing a self-healing cement (SHC) system to maintain long-term zonal isolation. An interdisciplinary approach can be used to determine the following: Understand the impact of the well plan, and fluid densities on well integrity, in addition to cementing best practices.Characterize typical deepwater field formations, and establish limits for geo-mechanical values of each layer.Identify critical factors and focus on the pay zones.Understand potential issues and communication between the pay zones and the aquifers that are already previously confirmed.Determine risk of zonal communication assessment, mitigation, and prevention measurement implementations Once the formation data is validated by the operator, the life cycle of the well is simulated and the risk of zonal isolation can be evaluated. The results of this assessment can help the operator choose between to take the approach of mitigation, prevention, or a combination of both. The objective is to place a robust cement sheath with advanced mechanical performance in the pay zones that can resist the failures due to changing stresses during the well testing and production. This paper uses presents examples from a deepwater development field to show how cement systems with advanced mechanical properties counter the critical stresses during the lifecycle of a well and maintain zonal isolation.


2021 ◽  
Author(s):  
Emmanuel Therond ◽  
Yaseen Najwani ◽  
Mohamed Al Alawi ◽  
Muneer Hamood Al Noumani ◽  
Yaqdhan Khalfan Al Rawahi ◽  
...  

Abstract The Khazzan and Ghazeer gas fields in the Sultanate of Oman are projected to deliver production of gas and condensate for decades to come. Over the life of the project, around 300 wells will be drilled, with a target drilling and completion time of 42 days for a vertical well. The high intensity of the well construction requires a standardized and robust approach for well cementing to deliver high-quality well integrity and zonal isolation. The wells are designed with a surface casing, an intermediate casing, a production casing or production liner, and a cemented completion. Most sections are challenging in terms of zonal isolation. The surface casing is set across a shallow-water carbonate formation, prone to lost circulation and shallow water flow. The production casing or production liner is set across fractured limestones and gas-bearing zones that can cause A- and B-Annulus sustained casing pressure if not properly isolated. The cemented completion is set across a high-temperature sandstone reservoir with depletion and the cement sheath is subjected to very high pressure and temperature variations during the fracturing treatment. A standardized cement blend is implemented for the entire field from the top section down to the reservoir. This blend works over a wide slurry density and temperature range, has expanding properties, and can sustain the high temperature of the reservoir section. For all wells, the shallow-water flow zone on the surface casing is isolated by a conventional 11.9 ppg lightweight lead slurry, capped with a reactive sodium silicate gel, and a 15.8 ppg cement slurry pumped through a system of one-inch flexible pipes inserted in the casing/conductor annulus. The long intermediate casing is cemented in one stage using a conventional lightweight slurry containing a high-performance lost circulation material to seal the carbonate microfractures. The excess cement volume is based on loss volume calculated from a lift pressure analysis. The cemented completion uses a conventional 13.7 - 14.5 ppg cement slurry; the cement is pre-stressed in situ with an expanding agent to prevent cement failure when fracturing the tight sandstone reservoir with high-pressure treatment. Zonal isolation success in a high-intensity drilling environment is assessed through key performance zonal isolation indicators. Short-term zonal isolation indicators are systematically used to evaluate cement barrier placement before proceeding with installing the next casing string. Long-term zonal isolation indicators are used to evaluate well integrity over the life of the field. A-Annulus and B-Annulus well pressures are monitored through a network of sensors transmitting data in real time. Since the standardization of cementing practices in the Khazzan field short-term job objectives met have increased from 76% to 92 % and the wells with sustained casing pressure have decreased from 22 % to 0%.


2010 ◽  
Author(s):  
Elena M. Pershikova ◽  
Alice Chougnet ◽  
Anthony Loiseau ◽  
Walid Khater ◽  
Andre Garnier

2016 ◽  
Vol 35 (8) ◽  
pp. 821-826 ◽  
Author(s):  
Chengqiang Ren ◽  
Ye Peng ◽  
Bing Li ◽  
Shuliang Wang ◽  
Taihe Shi

AbstractThe experiments were operated for the cylindrical sample (cement/steel) in high temperature and high pressure (HTHP) CO2 environment to simulate surrounding CO2 attack in oil and gas well. The interfacial evolutions between well cement and casing steel were measured, including mechanical property, structure alteration, chemical change and electrochemical character. The interfacial behaviors are attributed to the competition of hydration and degradation of Portland cement. The damage at the interface was faster than the cement bulk deterioration by carbonation. Thus, the interface provided a potential flow leakage pathway for the HTHP gas and fluid in the well, so improving interfacial stability between well cement and casing steel is the key issue to long-term zonal isolation.


Author(s):  
Sohrab Gheibi ◽  
Sigbjørn Sangesland ◽  
Torbjørn Vrålstad

Abstract To achieve an acceptable level of zonal isolation, well integrity should be guaranteed in hydrocarbon production and geological CO2 sequestration. Well pressure test can cause different types of failures in the well system leading to leakages through these failures. Laboratory evidences have revealed that occurrence of radial tensile fractures is likely during pressure tests. In this paper, we use a numerical code call MDEM which was formulated based on discrete element method. The code can model discontinuum feature of fractures. A model of a lab-sized pressure test was built and compared to an experiment previously published. The model was tested under different confinement levels and effect of the tensile strength of rock on the radial fracture was investigated at the same lab-scale. Fracture opening profiles are also presented showing the leakage potential of these fractures under different pressure level.