scholarly journals Experimental Study of Blasting Excavation for Large Cross-Section Tunnel in Horizontal Layered Rock Mass

Author(s):  
Jie Mei ◽  
Wanzhi Zhang ◽  
Bangshu Xu ◽  
Yongxue Zhu ◽  
Bingkun Wang

Abstract The drilling and blasting method is still the main method in mountain tunnel excavation. For large cross-section tunnel in horizontal layered rock mass, tunnel blasting often causes serious overbreak and underbreak. In this study, blasting excavation tests of tunnel upper face were conducted and failure mechanisms of surrounding rocks with weak beddings and joints were analyzed based on the Panlongshan tunnel. Then, the blasthole pattern, the cut mode, a variety of peripheral holes, the charge structure and the maximum single-hole charge were optimized. Compared with the failure characteristics, overbreak and underbreak, and deformations of surrounding rocks before and after optimization, the latter was better in tunnel contour forming and surrounding rock stability. The results show that after optimization, the large-area separation of vault rock mass is solved, the step-like overbreak of spandrel rock mass is reduced and the large-size rock blocks and underbreak are avoided. The maximum linear overbreak of vault, spandrel, and haunch surrounding rocks is decreased by 42.3%, 53.7% and 45.1%, respectively. The underbreak at the bottom of the upper face is reduced from -111.5 to - 16.5 cm. The average overbreak area is decreased by 61.1%. In addition, the displacements after optimization finally converge to the smaller values. The arch crown settlement and the horizontal convergence of haunch are reduced by about 21.6% and 18.3%, respectively. Furthermore, from the completion of blasting excavation to the stabilization of surrounding rock, it takes less time by using the optimized blasting scheme.

2019 ◽  
Vol 2019 ◽  
pp. 1-13 ◽  
Author(s):  
Qiang Xie ◽  
Kang Peng

The formation process of EDZs (excavation damaged zones) in the roadways of deep underground mines is complex, and this process is affected by blasting disturbances, engineering excavation unloading, and adjustment of field stress. The range of an excavation damaged zone (EDZ) changes as the time and space change. These changes bring more difficulties in analyzing the stability of the surrounding rock in deep engineering and determining a reasonable support scheme. In a layered rock mass, the distribution of EDZs is more difficult to identify. In this study, an ultrasonic velocity detector in the surrounding rock was used to monitor the range of EDZs in a deep roadway which was buried in a layered rock mass with a dip angle of 20–30°. The space-time distribution laws of the range of EDZs during the excavation process of the roadway were analyzed. The monitoring results showed that the formation of an EDZ can be divided into the following stages: (1) the EDZ forms immediately after the roadway excavation, which accounts for approximately 82%–95% of all EDZs. The main factors that affect the EDZ are the blasting load, the excavation unloading, and the stress adjustment; (2) as the roadway excavation continues, the range of the EDZs increases because of the blasting excavation and stress adjustment; (3) the later excavation zone has a comparatively larger EDZ value; and (4) an asymmetric supporting technology is necessary to ensure the stability of roadways buried in layered rocks. Additionally, the predictive capability of random forest modeling is evaluated for estimating the EDZ. The root-mean-square error (RMSE) and mean absolute error (MAE) are used as reliable indicators to validate the model. The results indicate that the random forest model has good prediction capability (RMSE = 0.1613 and MAE = 0.1402).


2021 ◽  
Vol 2021 ◽  
pp. 1-20
Author(s):  
Qi Yanli ◽  
Wen Shaoquan ◽  
Bai Mingzhou ◽  
Shi Hai ◽  
Li Pengxiang ◽  
...  

In the process of tunnel construction, the bias of layered rock mass tunnels has always been a prominent problem that troubles the construction and safe operation of tunnels. In this paper, a comprehensive method that combines monitoring technology and discrete element (3DEC) numerical simulation is proposed to analyze the deformation characteristics of the surrounding rock in the layered rock tunnel and the deformation law of the bias tunnel. The results indicate that the tunnel surrounding rock deformation in the study area showed the characteristics of bias. Based on the bias mechanism, the surrounding rock deformation law, the construction deformation control, and the optimization measures of layered rock mass in the bias tunnel were studied by means of combining monitoring technology with discrete element (3DEC) numerical simulation. Based on the research results, appropriate methods for controlling the deformation of the surrounding rock of the tunnel with comprehensive consideration of the anchor rod length, anchor rod angle, and anchor rod layout spacing were proposed. The method proposed in this paper could visually reveal the deformation characteristics of the surrounding rock of layered rock tunnels and the deformation law of bias tunnels. It could also better solve the problem of deformation control in the tunnel construction process. This approach provides a novel idea for special layered rock mass tunnel bias evaluation and deformation control parameter optimization and serves as a valuable reference for analogous engineering cases through engineering case analysis.


2011 ◽  
Vol 90-93 ◽  
pp. 2363-2371
Author(s):  
Bin Wei Xia ◽  
Ke Hu ◽  
Yi Yu Lu ◽  
Dan Li ◽  
Zu Yong Zhou

Physical models of layered rock mass with different dip angles are built by physical model test in accordance with the bias failure characteristics of surrounding rocks of layered rock mass in Gonghe Tunnel. Bias failure characteristics of surrounding rocks in thin-layered rock mass and influences of layered rock mass dip angle on stability of tunnel are studied. The research results show that failure characteristics of physical models generally coincide with those of surrounding rocks monitored from the tunnel site. The failure regions of surrounding rock perpendicular to the stratification planes are obviously larger than those parallel to. The stress distributions and failure characteristics in the surrounding rocks are similar to each physical model of different dip angles. The stress distributions and failure regions are all elliptic in shape, in which the major axis is in the direction perpendicular to the stratification planes while the minor axis is parallel to them. As a result, obvious bias failure of surrounding rocks has gradually formed. The physical model tests provide reliable basis for theoretical analysis on the failure mechanism of deep-buried layered rock mass.


2019 ◽  
Vol 2019 ◽  
pp. 1-16 ◽  
Author(s):  
Baofu Duan ◽  
Weizeng Gong ◽  
Guoshan Ta ◽  
Xuxu Yang ◽  
Xuewei Zhang

The vibration effect generated during tunnel excavation can influence or damage adjacent tunnels. Studying and controlling the blasting vibration effect has important theoretical and practical significance, especially for new tunnels. This paper takes the tunnel project of Gao Jiu Lu-Jia Hua Cross Tunnel in Chongqing as the research background and assesses the blasting vibration influence in the up-down cross-tunnel. Onsite monitoring and numerical simulation were used to analyze peak particle velocity (PPV) changes, stress distribution, and crown settlement during the excavation process of Gao Jiu Lu I Tunnel at Jia Hua Tunnel Left Line in the cross-section. Influence laws of blasting excavation in a small, clear distance cross-tunnel on an existing tunnel below were obtained. Results show that new tunnel blasting vibrations exerted the largest influence on the crown of the existing tunnel below in the cross-section. The maximum tensile stress of the secondary lining of the existing tunnel below was mainly concentrated in the crown area. The maximum compressive stress during excavation was concentrated in the crown foot, and the stress value was less than the tensile and compressive strength of the concrete. The loosening of the surrounding rock from blasting excavation of the new tunnel caused secondary settlement of the existing tunnel crown below. The cumulative settlement value at the cross-section of the two tunnels was the largest. With an increase in axial distance from the cross-section of the existing tunnel crown, the settlement value gradually declined and became stable. These research results have reference value for the construction of a small, clear distance cross-tunnel and provide theoretical guidance for similar tunnel excavation projects in the future.


2019 ◽  
Vol 2019 ◽  
pp. 1-10
Author(s):  
Fei Xue ◽  
Caichu Xia ◽  
Guoliang Li ◽  
Baocheng Jin ◽  
Yongwang He ◽  
...  

The effects of tunnel blast excavation on the lining structures of adjacent tunnels are comprehensively studied for the Xinling highway tunnel project. First, the LS-DYNA software is applied to obtain the characteristics of vibration velocities and dynamic stresses at different positions of the tunnel liner. The results indicate that the maximum peak particle velocity (PPV) is located on the haunch of the lining facing the blasting source and that the PPV and peak tensile stress decrease with the increase in the surrounding rock grade. Second, a site test on blasting vibration is conducted to verify the simulation results. By using regression analysis of the measured vibration data, the calculation method of maximum charge per delay for optimizing blasting excavation under different surrounding rock grades is obtained. Finally, based on the statistical relationship between crack alteration and PPV on the lining before and after blasting, the safety thresholds of PPV for different portions of the tunnel are determined. The recommended safety threshold of PPV is 10 cm/s for intact lining and for B-grade and V-grade linings of the surrounding rock tunnel. However, if the lining crack grade falls between 1A and B, then the recommended safety thresholds of PPV for the III-grade and IV-grade surrounding rock tunnel are 5 cm/s and 6 cm/s, respectively. The threshold PPV proposed in this study has been successfully applied to restrict blast-induced damage during new tunnel excavation of the Xinling tunnel project.