The Kinetic Analysis of Bod and Nitrogen Removal in an Oxidation Ditch

1985 ◽  
Vol 17 (2-3) ◽  
pp. 291-302 ◽  
Author(s):  
Y. Terashima ◽  
M. Ishikawa

The simultaneous removal of nitrogen as well as organic substances is one of important characteristics of the oxidation ditch process. To describe this phenomena, synthetic kinetic models including the rates of BOD oxidation, nitrification, denitrification, DO and alkalinity changes, and sludge growth were proposed in this study. Rate equations for these mechanisms were mainly based on Monod type kinetics taking into account several limiting effects among these mechanisms. To develop the design procedure, these kinetic models were combined with the tank-in-series model having circulating and back flows. They were analyzed numerically for typical design and operating conditions. From these computer simulations, successful results to explain these complicated phenomena and several design and operating bases were obtained.

1987 ◽  
Vol 19 (1-2) ◽  
pp. 209-218 ◽  
Author(s):  
Katsuto Inomae ◽  
Hiroyuki Araki ◽  
Kenichi Koga ◽  
Youichi Awaya ◽  
Tetsuya Kusuda ◽  
...  

The typical process of nitrogen removal in the oxidation ditch is achieved through the control of oxygen supply ( forming aerobic and anoxic zones within the ditch channel) or alternating aeration using intermittently operating aerator(s). The operating conditions for efficient nitrogen removal with any of these methods have yet to be clarified. The purpose of this study is to establish an oxidation ditch system with a high rate of nitrogen removal by intermittent aeration. Effects of intermittent aeration on nitrogen removal characteristics were studied by experiments with a bench scale- and full scale-plant and by simulation. The conditions of optimum operation (aerobic and anoxic periods) for a high rate of nitrogen removal were found. These conditions principally depend upon the rates of nitrification and denitrification. By operating the full scale plant system with intermittent aeration ( cycle time is 45 minutes and aerobic ratio is 0.42 ), a high rate nitrogen removal efficiency of 81% was achieved without adding any alkaline matter or organic carbon sources. It was shown that the results of simulation agree with the observed data of the full scale plant system, and that the rate of denitrification depends upon the conditions of intermittent aeration.


2004 ◽  
Vol 50 (7) ◽  
pp. 35-43 ◽  
Author(s):  
H. Siegrist ◽  
L. Rieger ◽  
Ch. Fux ◽  
M. Wehrli

Optimisation of nitrifying activated sludge plants towards nutrient removal (denitrification and enhanced P-removal) leads to a substantial reduction of operating costs and improves effluent and operating conditions. At WWTP Zürich-Werdhöelzli, initially designed for nitrification only, an anoxic zone of 28% of total activated sludge volume was installed and allowed 60% nitrogen elimination besides several other optimisations. In 2001 the operation of WWTP Zürich-Glatt was stopped and the wastewater was connected to WWTP Werdhöelzli. To improve nitrogen removal, WWTP Werdhöelzli co-financed two research projects; one for separate digester supernatant treatment with the anammox process operating two SBRs in series and the other applying NH4 sensors for aeration control in order to decrease energy consumption and raise effluent quality. The results of both projects and the consequences for WWTP Werdhöelzli are discussed in this paper.


1984 ◽  
Vol 19 (1) ◽  
pp. 87-100
Author(s):  
D. Prasad ◽  
J.G. Henry ◽  
P. Elefsiniotis

Abstract Laboratory studies were conducted to demonstrate the effectiveness of diffused aeration for the removal of ammonia from the effluent of an anaerobic filter treating leachate. The effects of pH, temperature and air flow on the process were studied. The coefficient of desorption of ammonia, KD for the anaerobic filter effluent (TKN 75 mg/L with NH3-N 88%) was determined at pH values of 9, 10 and 11, temperatures of 10, 15, 20, 30 and 35°C, and air flow rates of 50, 120, and 190 cm3/sec/L. Results indicated that nitrogen removal from the effluent of anaerobic filters by ammonia desorption was feasible. Removals exceeding 90% were obtained with 8 hours aeration at pH of 10, a temperature of 20°C, and an air flow rate of 190 cm3/sec/L. Ammonia desorption coefficients, KD, determined at other temperatures and air flow rates can be used to predict ammonia removals under a wide range of operating conditions.


1992 ◽  
Vol 25 (4-5) ◽  
pp. 161-168 ◽  
Author(s):  
J. Einfeldt

A process, called Bio-Denipho, for combined biological phosphorus and nitrogen removal in a combination of an anaerobic tank and two oxidation ditches is described. In this process the anaerobic tank consisting of three sections working in series is followed by two oxidation ditches. These too are working in series, but with both inlet to and outlet from the tanks changing in a cycle. The Bio-Denipho process is described specifically for the process itself and as a case study for the implementation of the process on a 265,000 pe wastewater treatment plant for the city of Aalborg in Denmark. The plant was designed and erected in two stages and the last stage was inaugurated October 31,1989. Lay-out and functions for the plant is described and design loads, plan lay-out and tank volumes are given in this paper together with performance data for the first year in operation.


Energies ◽  
2021 ◽  
Vol 14 (12) ◽  
pp. 3603
Author(s):  
Vu-Hai Nam ◽  
Duong-Van Tinh ◽  
Woojin Choi

Recently, the integrated On-Board Charger (OBC) combining an OBC converter with a Low-Voltage DC/DC Converter (LDC) has been considered to reduce the size, weight and cost of DC-DC converters in the EV system. This paper proposes a new integrated OBC converter with V2G (Vehicle-to-Grid) and auxiliary battery charge functions. In the proposed integrated OBC converter, the OBC converter is composed of a bidirectional full-bridge converter with an active clamp circuit and a hybrid LDC converter with a Phase-Shift Full-Bridge (PSFB) converter and a forward converter. ZVS for all primary switches and nearly ZCS for the lagging switches can be achieved for all the operating conditions. In the secondary side of the proposed LDC converter, an additional circuit composed of a capacitor and two diodes is employed to clamp the oscillation voltage across rectifier diodes and to eliminate the circulating current. Since the output capacitor of the forward converter is connected in series with the output capacitor of the auxiliary battery charger, the energy from the propulsion battery can be delivered to the auxiliary battery during the freewheeling interval and it helps reduce the current ripple of the output inductor, leading to a smaller volume of the output inductor. A 1 kW prototype converter is implemented to verify the performance of the proposed topology. The maximum efficiency of the proposed converter achieved by the experiments is 96%.


Author(s):  
G. Fusco ◽  
M. Russo

This paper proposes a simple design procedure to solve the problem of controlling generator transient stability following large disturbances in power systems. A state-feedback excitation controller and power system stabilizer are designed to guarantee robustness against uncertainty in the system parameters. These controllers ensure satisfactory swing damping and quick decay of the voltage regulation error over a wide range of operating conditions. The controller performance is evaluated in a case study in which a three-phase short-circuit fault near the generator terminals in a four-bus power system is simulated.


2014 ◽  
Vol 703 ◽  
pp. 171-174
Author(s):  
Bing Wang ◽  
Yi Xiao ◽  
Shou Hui Tong ◽  
Lan Fang ◽  
Da Hai You ◽  
...  

Improved step-feed de-nitrification progress combined with biological fluidized bed was introduced in this study. The progress had good performance and capacity of de-nitrification and organic matter. The experiment result showed that the de-nitrification efficiency of the improved biological fluidized bed with step-feed process was higher than the fluidized bed A/O process under the same water quality and the operating conditions. When the influent proportion of each segment was equal, the system showed good nitrogen removal efficiency with the change of influent C/N ratio, HRT and sludge return ratio. The removal rate of TN reached up to 88.2%. It showed that the simultaneous nitrification and de-nitrification phenomenon happened in the aerobic zone. The nitrogen removal mechanism was also studied.


2013 ◽  
Vol 67 (7) ◽  
pp. 1481-1489 ◽  
Author(s):  
R. Barat ◽  
J. Serralta ◽  
M. V. Ruano ◽  
E. Jiménez ◽  
J. Ribes ◽  
...  

This paper presents the plant-wide model Biological Nutrient Removal Model No. 2 (BNRM2). Since nitrite was not considered in the BNRM1, and this previous model also failed to accurately simulate the anaerobic digestion because precipitation processes were not considered, an extension of BNRM1 has been developed. This extension comprises all the components and processes required to simulate nitrogen removal via nitrite and the formation of the solids most likely to precipitate in anaerobic digesters. The solids considered in BNRM2 are: struvite, amorphous calcium phosphate, hidroxyapatite, newberite, vivianite, strengite, variscite, and calcium carbonate. With regard to nitrogen removal via nitrite, apart from nitrite oxidizing bacteria two groups of ammonium oxidizing organisms (AOO) have been considered since different sets of kinetic parameters have been reported for the AOO present in activated sludge systems and SHARON (Single reactor system for High activity Ammonium Removal Over Nitrite) reactors. Due to the new processes considered, BNRM2 allows an accurate prediction of wastewater treatment plant performance in wider environmental and operating conditions.


1994 ◽  
Vol 29 (10-11) ◽  
pp. 409-416 ◽  
Author(s):  
F. Çeçen ◽  
I. E. Gönenç

The kinetics of nitrogen removal was studied in upflow submerged nitrification and denitrification filters in series. Nitrification followed first-, half-, and zero-order kinetics. For the half-order range the half-order rate constant was about 0.9gNH4-N1/2m−1/2d−1. The zero-order rate constants for the DO ranges of 2-3 mg/L and 4-5 mg/L were found as 0.47 gNH4-Nm−2d−1 and 1.82 gNH4-Nm−2d−1, respectively. In the zero-order region ammonia removal proceeded as a half-order reaction in oxygen concentration and the half-order rate constants were about 1.4-2.7 gO21/2m−1/2d−1. Nitrite accumulation reached a considerable degree at bulk oxygen to bulk ammonia ratios lower than 5 since the formation of nitrate was inhibited. Similar to nitrification half- and zero-order kinetic regions were also observed in denitrification. The half- and zero-order rate constants for carbon unlimited cases (influent COD/NOx-N>5) were about 0.23 gNOx-N1/2m−1/2d−1 and 1.9 gNOx-Nm−2d−1, respectively. The nitrite produced in the nitrification stage could be reduced in denitrification. The removal kinetics in the presence of nitrite was found to be similar to the kinetics when the influent consisted of nitrate only.


Sign in / Sign up

Export Citation Format

Share Document