Biological Nutrient Removal at the Blue Plains Wastewater Treatment Plant in Washington, D.C.

1992 ◽  
Vol 26 (9-11) ◽  
pp. 2233-2236 ◽  
Author(s):  
S. J. Kang ◽  
W. F. Bailey ◽  
D. Jenkins

A pilot study was conducted to establish feasibility of biological nutrient removal at one of the most advanced wastewater treatments in the U.S. The results of the study revealed technical feasibility of biological phosphorus removal at extremely high F/M (0.84 1/day) and a short hydraulic detention time (2.2 hours) in the first stage activated sludge system. Due to phosphorus limitation of 0.18 mg/l, it was determined that none of the single sludge BNR processes was applicable at this facility. In the second stage, therefore, biological nitrogen removal was achieved with both methanol and primary effluent as a carbon source. Another significant finding was that after acclimation, the primary effluent exhibited the same rate of denitrification as with methanol (2.7 mg NO3− N/gVSS·hr). Further pilot testing revealed correlations among such process variables as detention time, BOD to nitrogen ratio, and effluent nitrogen concentration.

1994 ◽  
Vol 29 (12) ◽  
pp. 41-48 ◽  
Author(s):  
J. Charlton

The Melby Wastewater Treatment Plant is located in the municipality of Frederiksværk on the island of Sealand, Denmark. This may be the first full-scale plant in Europe purpose built for biological nutrient removal from diluted wastewater, i.e. weak domestic wastewater mixed with infiltration waters. The relatively strict effluent standards have required the existing treatment plant to be upgraded in capacity, including the design for biological Nitrogen and Phosphorus removal. Due to the weak nature of the influent wastewater, the treatment process that has been adopted includes the application of a primary sludge fermenter to alter the influent characteristics suitable for biological nutrient removal. The treatment process used is the Modified University of Cape Town process utilising a primary sludge fermenter developed at the University of British Columbia in Canada. The combination of these two processes has been successfully applied to meet the strict discharge licence requirements, without the addition of chemicals, despite the unsuitable characteristics of the influent wastewater for biological nutrient removal. The paper describes the operational results for the treatment plant.


1996 ◽  
Vol 34 (1-2) ◽  
pp. 285-292 ◽  
Author(s):  
P. R. Thomas ◽  
D. Allen ◽  
D. L. McGregor

This study was undertaken to optimise phosphorus removal by incorporating a chemical dosing facility in an existing biological nutrient removal activated sludge plant at Albury in Australia. Results of pilot plant trials and jar tests indicated that both alum and ferric chloride successfully reduced the orthophosphate concentrations with only a minor variation in the chemical costs. However, alum was chosen as the preferred chemical for use in the full-scale plant and tests showed that alum precipitation combined with biological nutrient removal lowered the orthophosphate (ortho-P) concentrations to as low as 0.01 mg/L with average total phosphorus (total-P) levels of around 0.5 mg/L. It is concluded that maximising total phosphorus removal in the treatment plant would require optimising biological phosphorus removal, applying correct chemical dosages to varying mixed liquor orthophosphate concentrations, adequate mixing, suitable pH values and minimising suspended solids in the clarifier effluent.


2009 ◽  
Vol 4 (1) ◽  
Author(s):  
E. Choi ◽  
Z. Yun ◽  
K.S. Min

In a densely populated area, a large wastewater treatment plant (WWTP) has been constructed in the underground. The plant is practically “invisible” to visitors and neighbours, and the ground level is used as a park and sport facilities in order to avoid the “not in my backyard” phenomenon. The WWTP has a 5-stage biological nutrient removal system utilizing the denitrifying PAO (dPAO) with a step feed in order to treat the weak sewage with higher nutrient removal requirement. Although the underground installation could be expected to increase plant operating temperature, the temperature increase was only 1°C. The polished final effluent from a sand filter produced average TN and TP concentrations of 5.11 mg/L and 0.91 mg/L, respectively with SS concentrations of 0.61 mg/L, indicating that the dPAO system combined with sand filter effectively produced a high quality effluent.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 53-60 ◽  
Author(s):  
B. Rabinowitz ◽  
T. D. Vassos ◽  
R. N. Dawson ◽  
W. K. Oldham

A brief review of recent developments in biological nitrogen and phosphorus removal technology is presented. Guidelines are outlined of how current understanding of these two removal mechanisms can be applied in the upgrading of existing wastewater treatment plants for biological nutrient removal. A case history dealing with the upgrading of the conventional activated sludge process located at Penticton, British Columbia, to a biological nutrient removal facility with a design flow of 18,200 m3/day (4.0 IMGD) is presented as a design example. Process components requiring major modification were the headworks, bioreactors and sludge handling facilities.


2013 ◽  
Vol 67 (7) ◽  
pp. 1481-1489 ◽  
Author(s):  
R. Barat ◽  
J. Serralta ◽  
M. V. Ruano ◽  
E. Jiménez ◽  
J. Ribes ◽  
...  

This paper presents the plant-wide model Biological Nutrient Removal Model No. 2 (BNRM2). Since nitrite was not considered in the BNRM1, and this previous model also failed to accurately simulate the anaerobic digestion because precipitation processes were not considered, an extension of BNRM1 has been developed. This extension comprises all the components and processes required to simulate nitrogen removal via nitrite and the formation of the solids most likely to precipitate in anaerobic digesters. The solids considered in BNRM2 are: struvite, amorphous calcium phosphate, hidroxyapatite, newberite, vivianite, strengite, variscite, and calcium carbonate. With regard to nitrogen removal via nitrite, apart from nitrite oxidizing bacteria two groups of ammonium oxidizing organisms (AOO) have been considered since different sets of kinetic parameters have been reported for the AOO present in activated sludge systems and SHARON (Single reactor system for High activity Ammonium Removal Over Nitrite) reactors. Due to the new processes considered, BNRM2 allows an accurate prediction of wastewater treatment plant performance in wider environmental and operating conditions.


2001 ◽  
Vol 43 (11) ◽  
pp. 109-117 ◽  
Author(s):  
D. Bixio ◽  
P. van Hauwermeiren ◽  
C. Thoeye ◽  
P. Ockier

The municipal sewage treatment plant (STP) of the city of Ghent (Belgium) has to be retrofitted to a 43%-increase in the nitrogen treatment capacity and to phosphorus removal. Cold weather, dilute sewage and a critical COD over N ratio make the retrofit a challenge for full biological nutrient removal. The potential for fermentation of primary sludge to alter those critical feed sewage characteristics was experimentally evaluated. The idea was that the pinpoint introduction of fermentate could optimise the available reactors by achieving high-rate denitrification and enhanced biological phosphorus removal. The fermentation process was evaluated with a bench scale apparatus. At 20°C (heated process), the hydrolysis yield - expressed in terms of soluble COD - varied from 11% to 24% of the total sludge COD. The fermentation yield expressed in VFA COD varied from 8% to 13% of the total sludge COD. The efficiency of heated fermentation of primary sludge was lower during cold and wet weather, due to the different sewage characteristics, as a result of extended dilution periods and low temperature. The raw sewage, the primary effluent and the fermentate were fractionated according to the requirements for the IAWQ Activated Sludge Model No. 2d. The results clearly show that fermentation in the sewer played an important role and temperature was the driving parameter for the characteristics of the dissolved COD. Instead, the weather flow conditions were the driving parameter for the characteristics of the suspended COD. The results of the detailed fractionation were used as background for process evaluation. The final scenario choice for the retrofit depends on a cost-efficiency calculation.


2004 ◽  
Vol 48 (11-12) ◽  
pp. 453-462
Author(s):  
E.U. Cokgor ◽  
C.W. Randall

The Wilderness Wastewater Treatment Plant (WWTP) located in Orange County, Virginia is a four concentric ring oxidation ditch activated sludge system with a rated capacity of 1,935 m3/day. The three outer rings are used for wastewater treatment and the inner ring is used as an aerobic digester. The flow capacity has been increased from 1,935 to 3,760 m3/d, however, the desired design capacity has since been increased to 3,870 m3/d, and there are plans to eventually expand to approximately 4,840 m3/d with improved nitrogen removal. The design goal for the planned upgrade is to discharge an effluent that contains less than 10 mg/l total nitrogen (TN) at all times, with an annual average of 8 mg/l or less. In this study, the pre-upgrade performance of the Wilderness Wastewater Treatment Plant was evaluated and several modifications were recommended for the incorporation of biological nutrient removal (BNR).


1983 ◽  
Vol 15 (3-4) ◽  
pp. 233-259 ◽  
Author(s):  
A R Pitman ◽  
S L V Venter ◽  
H A Nicholls

This paper describes three years operating experience with two full-scale biological nutrient removal activated sludge plants. Factors affecting biological phosphorus removal are highlighted and possible process improvements suggested.