scholarly journals Treatment of septage in sludge drying reed beds: a case study on pilot-scale beds

2009 ◽  
Vol 60 (3) ◽  
pp. 643-653 ◽  
Author(s):  
S. Troesch ◽  
A. Liénard ◽  
P. Molle ◽  
G. Merlin ◽  
D. Esser

French legislation requires the control of private on-site sanitation systems by local authorities. This will result in a large increase of the quantity of sludge from septic tanks to be treated. Nevertheless, large wastewater treatment plants are not systematically able to treat this sludge because they may have reached their nominal load or they are not so numerous in rural zone to avoid too long transportation. The study concerns both the feasibility of sludge reed beds devoted to the treatment of septage and the assessment of a simultaneous treatment with aerated sludge. The experiments have been carried out on eight pilot-scale drying reed beds (2 m2) planted with Phragmites australis. Two filtration layers of either vegetal compost or sand were tested. The study is focused on the commissioning period (first vegetative year) with a loading rate of 30 kg SS m−2 yr−1. According to these operational conditions, dewatering efficiencies reached approx. 30% DM during summer but less than 20%DM in winter for each filtration layer and sludge. High removal efficiencies, with an average of 96%, 92% and 89% for SS, COD and TKN respectively, were achieved with septage whereas they were lower for the mixture of aerated sludge and septage. The dewaterability of septage and its filtration behaviour were assessed by several parameters (Capillary Suction Time, bound water) which may be some interesting tools for an optimised loading strategy.

2000 ◽  
Vol 41 (1) ◽  
pp. 57-63 ◽  
Author(s):  
S. Vandaele ◽  
C. Thoeye ◽  
B. Van Eygen ◽  
G. De Gueldre

In Flanders (Belgium) an estimated 15% of the population will never be connected to a central wastewater treatment plant (WWTP). Small WWTPs can be a valuable option. Aquafin bases the decision to build SWWTPs on a drainage area study. To realise an accelerated construction the process choice is made accordingly to a standard matrix, which represents the different technologies in function of the size and the effluent consents. A pilot scale constructed two-stage reed bed is used to optimise the concept of the reed beds. The concept consists of a primary clarifier, two parallel vertical flow reed beds followed by a sub-surface flow reed bed. The removal efficiency of organic pollutants is high (COD: 89%, BOD: 98%). Phosphorus removal is high at the start-up but diminishes throughout the testing period (from 100% to 71% retention after 7 months). Nitrogen removal amounts to 53% on average. Nitrification is complete in summer. Denitrification appears to be the limiting factor. In autumn leakage of nitrogen is assumed. Removal efficiency of pathogens amounts to almost 99%. Clogging forms a substantial constraint of the vertical flow reed bed. Problems appear to be related with presettlement, feed interval and geotextile.


2005 ◽  
Vol 51 (9) ◽  
pp. 119-126 ◽  
Author(s):  
T. Koottatep ◽  
N. Surinkul ◽  
C. Polprasert ◽  
A.S.M. Kamal ◽  
D. Koné ◽  
...  

In tropical regions, where most of the developing countries are located, septic tanks and other onsite sanitation systems are the predominant form of storage and pre-treatment of excreta and wastewater, generating septage and other types of sludges. The septage is disposed of untreated, mainly due to lack of affordable treatment options. This study presents lessons that have been learned from the operation of pilot-scale constructed wetlands (CWs) for septage treatment since 1997. The experiments have been conducted by using three CW units planted with narrow-leave cattails (Typha augustifolia) and operating in a vertical-flow mode. Based on the experimental results, it can be suggested that the optimum solids loading rate be 250 kg TS/m2 yr and 6-day percolate impoundment. At these operational conditions, the removal efficiencies of CW units treating septage at the range of 80–96% for COD, TS and TKN were achieved. The biosolid accumulated on the CW units to a depth of 80 cm has never been removed during 7 years of operation, but bed permeability remained unimpaired. The biosolid contains viable helminth eggs below critical limit of sludge quality standards for agricultural use. Subject to local conditions, the suggested operational criteria should be reassessed at the full-scale implementation.


2015 ◽  
Vol 768 ◽  
pp. 515-519
Author(s):  
Xin Nan Deng ◽  
Yu Bo Cui ◽  
Wei Gao ◽  
Rui Chen

Sludge moisture content was investigated at different stages during the test. Pilot-scale sludge drying bed and sludge drying reed beds had the same size of 3 m×1 m×1.3 m, and the bed height consisted of a 65 cm media layer and a 65 cm extra height. The media layer is filled with slag (20 cm), gravel (20 cm), coarse sand (5 cm) and quartz sand (24.5 cm) from the bottom in turn. Unit 1 was a conventional sludge drying bed, unit 2 was a sludge drying reed bed. Unit 1 and unit 2 had ventilation pipes which were mounted on the drainage pipes. Unit 3 was a sludge drying reed bed without ventilation pipe. The waste activated sludge was feed into the three units periodically during the experiment. The experiment investigated the sludge moisture content. At the end of the operation, the sludge moisture content in three units decreased by 18.52%, 22.37%, and 20.68%, respectively. It was found that the dewatering effect of the sludge drying reed bed was better than the conventional drying bed. The effect of plant growth on sludge dewatering is greater than the ventilation, but the difference was not significant.


2009 ◽  
Vol 172 (2-3) ◽  
pp. 1122-1130 ◽  
Author(s):  
A.I. Stefanakis ◽  
C.S. Akratos ◽  
P. Melidis ◽  
V.A. Tsihrintzis

1990 ◽  
Vol 22 (3-4) ◽  
pp. 65-72 ◽  
Author(s):  
H.-H. Schierup ◽  
H. Brix

Since 1983 approximately 150 full-scale emergent hydrophyte based wastewater treatment plants (reed beds) have been constructed in Denmark to serve small wastewater producers. The development of purification performance for 21 plants representing different soil types, vegetation, and hydraulic loading rates has been recorded. Cleaning efficiencies were typically in the range of 60-80% reduction for BOD, 25-50% reduction for total nitrogen, and 20-40% reduction for total phosphorus. The mean effluent BOD, total nitrogen and total phosphorus concentrations of the reed beds were 19 ± 10, 22 ± 9 and 6.7 ± 3.2 mg/l (mean ± SD), respectively. Thus, the general Danish effluent standards of 8 mg/l for N and 1.5 mg/l for P for sewage plants greater than 5,000 PE cannot be met by the present realised design of EHTS. The main problem observed in most systems is a poor development of horizontal hydraulic conductivity in the soil which results in surface run-off. Since the political demands for effluent quality will be more strict in the future, it is important to improve the performance of small decentral sewage treatment plants. On the basis of experiences from different types of macrophyte based and conventional low-technology wastewater treatment systems, a multi-stage system is suggested, consisting of sedimentation and sand filtration facilities followed by basins planted with emergent and submergent species of macrophytes and algal ponds.


1996 ◽  
Vol 33 (7) ◽  
pp. 165-171 ◽  
Author(s):  
J. Soares ◽  
S. A. Silva ◽  
R. de Oliveira ◽  
A. L. C. Araujo ◽  
D. D. Mara ◽  
...  

Ammonia removal was monitored in a waste stabilisation pond complex comprising ponds of different geometries and depths under two different operational regimes. It was found that a high degree of ammonia removal commenced in the secondary maturation ponds, with the highest removals occurring in the shallowest ponds as a consequence of improved aerobic conditions. The tertiary maturation ponds produced effluents with mean ammonia concentrations of < 5 mg N/l, the maximum permitted recommended by Brazilian environmental legislation for the discharge of effluents of wastewater treatment plants into surface waters. Ammonia removal in the secondary facultative and maturation ponds could be modelled using equations based on the volatilization mechanism proposed by Middlebrooks et al. (1982).


2015 ◽  
Vol 71 (7) ◽  
pp. 1088-1096 ◽  
Author(s):  
B. Kim ◽  
M. Gautier ◽  
G. Olvera Palma ◽  
P. Molle ◽  
P. Michel ◽  
...  

The aim of this study was to characterize the efficiency of an intensified process of vertical flow constructed wetland having the following particularities: (i) biological pretreatment by trickling filter, (ii) FeCl3 injection for dissolved phosphorus removal and (iii) succession of different levels of redox conditions along the process line. A pilot-scale set-up designed to simulate a real-scale plant was constructed and operated using real wastewater. The influences of FeCl3 injection and water saturation level within the vertical flow constructed wetland stage on treatment performances were studied. Three different water saturation levels were compared by monitoring: suspended solids (SS), total phosphorus (TP), dissolved chemical oxygen demand (COD), ammonium, nitrate, phosphate, iron, and manganese. The results confirmed the good overall efficiency of the process and the contribution of the trickling filter pretreatment to COD removal and nitrification. The effects of water saturation level and FeCl3 injection on phosphorus removal were evaluated by analysis of the correlations between the variables. Under unsaturated conditions, good nitrification and no denitrification were observed. Under partly saturated conditions, both nitrification and denitrification were obtained, along with a good retention of SSs. Finally, under saturated conditions, the performance was decreased for almost all parameters.


Sign in / Sign up

Export Citation Format

Share Document