scholarly journals Upflow packed bed Anammox reactor used in two-stage deammonification of sludge digester effluent

2018 ◽  
Vol 78 (9) ◽  
pp. 1843-1851 ◽  
Author(s):  
İ. Çelen-Erdem ◽  
E. S. Kurt ◽  
B. Bozçelik ◽  
B. Çallı

Abstract The sludge digester effluent taken from a full scale municipal wastewater treatment plant (WWTP) in Istanbul, Turkey, was successfully deammonified using a laboratory scale two-stage partial nitritation (PN)/Anammox (A) process and a maximum nitrogen removal rate of 1.02 kg N/m3/d was achieved. In the PN reactor, 56.8 ± 4% of the influent NH4-N was oxidized to NO2-N and the effluent nitrate concentration was kept below 1 mg/L with 0.5–0.7 mg/L of dissolved oxygen and pH of 7.12 ± 12 at 24 ± 4°C. The effluent of the PN reactor was fed to an upflow packed bed Anammox reactor where high removal efficiency was achieved with NO2-N:NH4-N and NO3-N:NH4-N ratios of 1.32 ± 0.19:1 and 0.22 ± 0.10:1, respectively. The results show that NH4-N removal efficiency up to 98.7 ± 2.4% and total nitrogen removal of 87.7 ± 6.5% were achieved.

2013 ◽  
Vol 67 (12) ◽  
pp. 2761-2767 ◽  
Author(s):  
Ruihua Li ◽  
Jianmin Niu ◽  
Xinmin Zhan ◽  
Bo Liu

The efficacy of iron(II) sulfide (FeS)-based autotrophic denitrification in simultaneous nitrogen and phosphorus removal from wastewater was studied with batch experiments. It was efficient at a wide pH range of 5–9, and temperature range of 10–40 °C. The concentrations of NH4+-N, Mg2+ and HCO3− in the wastewater should be kept over 7.8, 0.24 and 30 mg L−1 for efficient nitrate (NO3−-N) reduction, respectively. The NO3−-N removal rate increased from 0 to 82 mg L−1 d−1 and then leveled off when the NO3−-N concentration increased from 0 to 415 mg L−1 and then to 700 mg L−1, respectively. The NO3−-N removal rate quickly increased, leveled off, and then sharply decreased when the PO43−-P concentration increased from 0 to 0.1 mg L−1, then to 114.0 mg L−1, and further to 683.8 mg L−1, respectively. The PO43−-P removal was over 98% when the PO43−-P concentration ranged 0–683.3 mg L−1. During treatment of the secondary effluent of a local municipal wastewater treatment plant containing NO3−-N of 14.9 mg L−1 and total phosphorus (TP) of 3.9 mg L−1, NO3−-N was reduced to 1.1 mg L−1 and TP was completely removed.


1996 ◽  
Vol 33 (12) ◽  
pp. 117-126 ◽  
Author(s):  
I. Purtschert ◽  
H. Siegrist ◽  
W. Gujer

In coordination with the EU-guidelines the large wastewater treatment plants in Switzerland have to be extended with enhanced nitrogen removal. Due to the existing plant configuration, the low COD/N ratio and dilute wastewater, denitrification supported by an external carbon source instead of extending the plant may be an interesting and cost effective solution for municipal wastewater treatment. At the wastewater treatment plant Zürich-Werdhölzli different experiments were performed with methanol addition to predenitrification from March to July 1994. The aim of this work was to evaluate the use of methanol as an alternative to plant extension to achieve a higher nitrogen removal efficiency. Therefore, two parallel denitrifying lanes were investigated, one served for methanol addition experiments and the other as a control. The effect of oxygen input into the anoxic zone due to influent, return sludge and mixing was investigated, too. The results show that nitrogen removal efficiency can be substantially increased as compared to the reference lane. The adaptation period for methanol degradation was only a few days and the process was relatively stable. Based on total nitrogen in the inflow, the average denitrification was 55% with methanol addition and 35% without methanol. The yield coefficient YCOD was 0.4 g CODX g−1 CODMe. Due to the small net growth rate of the methanol degraders the denitrification capacity is relatively low and nitrate peak loads cannot be fully denitrified. Hence, methanol as a carbon source requires more or less constant dosing. To prevent nitrate limitation, methanol addition should be controlled by the anoxic nitrate concentrations.


Water ◽  
2021 ◽  
Vol 13 (10) ◽  
pp. 1339
Author(s):  
Javier Bayo ◽  
Sonia Olmos ◽  
Joaquín López-Castellanos

This study investigates the removal of microplastics from wastewater in an urban wastewater treatment plant located in Southeast Spain, including an oxidation ditch, rapid sand filtration, and ultraviolet disinfection. A total of 146.73 L of wastewater samples from influent and effluent were processed, following a density separation methodology, visual classification under a stereomicroscope, and FTIR analysis for polymer identification. Microplastics proved to be 72.41% of total microparticles collected, with a global removal rate of 64.26% after the tertiary treatment and within the average retention for European WWTPs. Three different shapes were identified: i.e., microfiber (79.65%), film (11.26%), and fragment (9.09%), without the identification of microbeads despite the proximity to a plastic compounding factory. Fibers were less efficiently removed (56.16%) than particulate microplastics (90.03%), suggesting that tertiary treatments clearly discriminate between forms, and reporting a daily emission of 1.6 × 107 microplastics to the environment. Year variability in microplastic burden was cushioned at the effluent, reporting a stable performance of the sewage plant. Eight different polymer families were identified, LDPE film being the most abundant form, with 10 different colors and sizes mainly between 1–2 mm. Future efforts should be dedicated to source control, plastic waste management, improvement of legislation, and specific microplastic-targeted treatment units, especially for microfiber removal.


2010 ◽  
Vol 61 (9) ◽  
pp. 2259-2266 ◽  
Author(s):  
Styliani Kantartzi ◽  
Paraschos Melidis ◽  
Alexander Aivasidis

In the present study, a laboratory scale system, consisting of a primary settling tank, a continuous stirred tank reactor and a clarifier were constructed and operated, using wastewater from the municipal wastewater treatment plant in Xanthi, Greece. The system operated under intermittent aeration in aerobic/anoxic conditions and feeding of the wastewater once in every cycle. The unit was inoculated with sludge, which originated from the recirculation stream of the local wastewater treatment plant. The wastewater was processed with hydraulic retention time (HRT) of 12 h, in which various experimental states were studied regarding the combination of aerobic and anoxic intervals. The wastewater was fed in limited time once in every cycle of aerobic/anoxic conditions at the beginning of the anoxic period. The two states that exhibited highest performance in nitrification and total nitrogen removal were, then, repeated with HRT of 10 h. The results show that, regarding the nitrification stage and the organic load removal, the intermittent system achieved optimum efficiency, with an overall removal of biological oxygen demand (BOD5) and ammonium nitrogen in the range of 93–96% and 91–95% respectively. As far as the total nitrogen removal is concerned, and if the stage of the denitrification is taken into account, the performance of the intermittent system surpassed other methods, as it is shown by the total Kjeldahl nitrogen (TKN) removal efficiency of 85–87%. These operating conditions suppressed the growth of filamentous organisms, a fact reflected at the SVI values, which were lower than 150 ml/g.


2007 ◽  
Vol 55 (8-9) ◽  
pp. 59-65 ◽  
Author(s):  
A. Onnis-Hayden ◽  
P.B. Pedros ◽  
J. Reade

An experimental study investigating the nitrogen removal efficiency from the recycle stream generated in the dewatering facility of the anaerobically digested sludge at the Deer Island wastewater treatment plant (WWTP) in Boston was conducted using a single submerged attached growth bioreactor (SAGB), designed for simultaneous nitrification and denitrification. The applied nitrogen loading to the reactor ranged from 0.7 to 2.27 kg-N/m3·d, and the corresponding total nitrogen (TN) removal rate ranged from 0.38 to 1.8 kg-N/m3·d. The observed nitrification rates varied from 0.42 kg-N/m3·d to 1.45 kg-N/m3·d with an ammonia load of 0.5 kg-N/m3·d and 1.8 kg-N/m3·d, respectively. An average nitrification efficiency of 91% was achieved throughout the experiment. Denitrification efficiency varied from 55%, obtained without any addition of carbon source, to 95% when methanol was added in order to obtain a methanol/nitrate ratio of about 3 kg methanol/kg NO3−-N.


2005 ◽  
Vol 52 (4) ◽  
pp. 9-17 ◽  
Author(s):  
S. Caffaz ◽  
R. Canziani ◽  
C. Lubello ◽  
D. Santianni

In recent years a completely autotrophic nitrogen removal process based on Anammox biomass has been tested in a few European countries in order to treat anaerobic supernatant and to increase the COD/N ratio in municipal wastewater. This work reports experimental results on a possible technical solution to upgrade the S. Colombano treatment plant which treats wastewater from the Florentine urban area. The idea is to use 50% of the volume of the anaerobic digester in order to treat external sewage sludge (as septic tank sludge) together with waste activated sludge and to treat the resulting effluent on a SHARON-ANAMMOX process in order to remove nitrogen from the anaerobic supernatant. Anaerobic co-digestion, tested in a 200 L pilot plant, enables low cost treatment of septic tank sludge and increases biogas production; however, it also increases the nitrogen load re-circulated to the WWTP, where nitrogen removal efficiency is already low (<50%), due to the low COD/N ratio, which limits predenitrification efficiency. Experimental results from a SHARON process tested in a lab-scale pilot plant show that nitrite oxidising bacteria are washed-out and steady nitrite production can be achieved at retention times in the range 1–1.5 days, at 35 °C. In a lab-scale SBR reactor, coupled with a nitration bioreactor, maximum specific nitrogen removal rate under nitrite-limiting conditions (with doubling time equal to about 26 days at 35 °C) was equal to 0.22 kgN/kgSSV/d, about 44 times the rate measured in inoculum Anammox sludge. Finally, a cost analysis of the proposed upgrade is reported.


2013 ◽  
Vol 67 (12) ◽  
pp. 2677-2684 ◽  
Author(s):  
M. Christensson ◽  
S. Ekström ◽  
A. Andersson Chan ◽  
E. Le Vaillant ◽  
R. Lemaire

ANITA™ Mox is a new one-stage deammonification Moving-Bed Biofilm Reactor (MBBR) developed for partial nitrification to nitrite and autotrophic N-removal from N-rich effluents. This deammonification process offers many advantages such as dramatically reduced oxygen requirements, no chemical oxygen demand requirement, lower sludge production, no pre-treatment or requirement of chemicals and thereby being an energy and cost efficient nitrogen removal process. An innovative seeding strategy, the ‘BioFarm concept’, has been developed in order to decrease the start-up time of new ANITA Mox installations. New ANITA Mox installations are started with typically 3–15% of the added carriers being from the ‘BioFarm’, with already established anammox biofilm, the rest being new carriers. The first ANITA Mox plant, started up in 2010 at Sjölunda wastewater treatment plant (WWTP) in Malmö, Sweden, proved this seeding concept, reaching an ammonium removal rate of 1.2 kgN/m3 d and approximately 90% ammonia removal within 4 months from start-up. This first ANITA Mox plant is also the BioFarm used for forthcoming installations. Typical features of this first installation were low energy consumption, 1.5 kW/NH4-N-removed, low N2O emissions, <1% of the reduced nitrogen and a very stable and robust process towards variations in loads and process conditions. The second ANITA Mox plant, started up at Sundets WWTP in Växjö, Sweden, reached full capacity with more than 90% ammonia removal within 2 months from start-up. By applying a nitrogen loading strategy to the reactor that matches the capacity of the seeding carriers, more than 80% nitrogen removal could be obtained throughout the start-up period.


2011 ◽  
Vol 356-360 ◽  
pp. 1331-1334
Author(s):  
Tao Lv ◽  
Wu Long Zhang ◽  
Xie Zhang ◽  
Feng Xue

This paper studies through project cases the treatment effect of integrated technique of anaerobic filter and constructed wetland on domestic wastewater in military camps, and the method for preventing the blocking of anaerobic filter and constructed wetland packing. The results show that its average removal rate of COD, NH4+-N, TP and SS is 83.1%, 37.5%, 49.8% and 91.5% respectively, with effluent meeting the standard of Grade II in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002); as planned, two anaerobic filters, one for operation and the other laying fallow at a alternate period of 6 months, in combination of the design of spoil disposal, can effectively prevent the packing layer from being blocked; being preprocessed, anaerobic filter can effectively prevent the packing layer of constructed wetland from being blocked; in case of a certain difference in elevation, the integrated technique can achieve unpowered operation. Besides, it is easy to implement and manage at a low operational cost without professional technician, and can treat decentralized domestic wastewater, therefore, is suitable for camps.


2013 ◽  
Vol 807-809 ◽  
pp. 694-698
Author(s):  
Rong Xin Huang ◽  
Zhen Xing Wang ◽  
Gang Liu ◽  
Qi Jin Luo

In order to guarantee the reliability and security of reclaiming water, research on the removal efficiency of the environmental endocrine chemicals (EDCs) --the Phthalate Esters (PAEs) in conventional secondary activated sludge and wastewater reclamation and reuse process was undergoing at Harbin wastewater treatment plant (WWTP). The wastewater samples were colleted from every unit effluent of WWTP. The results showed that contamination of EDCs were presented in municipal wastewater at Harbin and the concentrations of the four PAEs were 21.01μg/L for Di-n-butyl Phthalate (DBP); 9.63μg/L for Di-n-octyl Phthalate (DnOP); 4.56μg/L for Diethyl Phthalate (DEP); 1.96μg/L for Dimethyl Phthalate (DMP) respectively in the influent. The conventional activated sludge has good removal efficiencies performance on DMP, DEP and DBP. With the increasing of molecular weight and branch chains of PAEs contaminations, the removal rate of the four PAEs in the conventional activated sludge process decreased from 99.82%(DMP),90.60%(DEP),90.10%(DBP) to the only 45.13% removal rate for DnOP, which was mostly removed from primary treatment but no from secondary activated sludge process; Coagulation-air flotation plus filtration process was not a feasible way to remove PAEs from reclaiming treatment units.


1991 ◽  
Vol 18 (6) ◽  
pp. 940-944 ◽  
Author(s):  
J. B. Sérodes ◽  
E. Walsh ◽  
O. Goulet ◽  
J. de la Noue ◽  
C. Lescelleur

Design criteria of a pilot plant for treating secondary municipal effluents using filamentous, bioflocculating micro-algae were evaluated. Using a sequential batch reactor, the best removal rate of ammonia nitrogen was reached for 25% draw volume; at 20–22 °C, up to four cycles per day could be achieved giving a removal efficiency of approximately 2 g of N per day and per square meter of basin (200 mm deep) with negligible nitrogen residual; increasing the water level by increments of 200 mm (from 200 to 600 mm) increased the N removal efficiency in a way similar to an increase in the number of renewals per day on a 200 mm deep basin. The dominant micro-algae (Chlorhormidium) was heavily influenced by the water temperature. Key words: micro-algae, municipal wastewater, water treatment, ammonia nitrogen, removal rate, removal efficiency.


Sign in / Sign up

Export Citation Format

Share Document