scholarly journals A Life-Cycle Framework for Managing Risks in Public Private Partnership Housing Projects

2020 ◽  
Vol 10 (1) ◽  
pp. 27-34
Author(s):  
Yakubu N. Sanda ◽  
Natalia A. Anigbogu ◽  
Lura Y. Nuhu ◽  
Ola S. Olumide

AbstractPublic private partnership projects have been adjudged to contain more risks than traditionally procured projects due to more number of parties involved and their varying interests. These risks affect the achievement of projects objectives and therefore need to be identified and treated to guarantee project success. This paper developed a life cycle framework for managing risks in PPP housing projects in Nigeria. The respondents were selected using purposeful sampling technique. The data used for the study were obtained through semi-structured questionnaire and were analysed using mean rating. Risk transfer was found to be the widely used measure for responding to risks in PPP housing projects. The criteria mostly used for risk allocation were party with the best ability to manage specific risks should they occur and ability of the party to foresee risks. A four-stage life cycle framework was developed, evaluated and validated by experts in the built environment to ascertain its reliability. The framework is recommended for PPP housing projects in Nigeria.

Author(s):  
Olabode Ogunsanmi ◽  

The study investigates key performance indicators (KPIs) that could improve performance of public-private partnership PPP)projects in Nigeria. The study objectives include a comparison of stakeholders’ perception on KPIs and to investigate if significant difference exists between stakeholders’ perceptions on most KPIs. A structured questionnaire was used to collect information from various respondents who were recently involved in PPP projects. Random sampling technique was used to select forty-five (45) respondents out of which thirty-one (31) responses were used forthe data analysis. The results indicate that top KPIs for performance improvement are levels of design complexity and technological advancement,and return on investment. Stakeholders agree on most of the rankings of the KPIs. The general perception of stakeholders was similar on most KPIs except for a few divergent opinions. The study findings have an implication for policy and decision making such that stakeholders could pay special attention to the KPIs identified, that could improve construction project performance. Finally the study recommends further research to explore KPIs for other procurement options.


2018 ◽  
Vol 25 (2) ◽  
pp. 202-240 ◽  
Author(s):  
Neema Kavishe ◽  
Ian Jefferson ◽  
Nicholas Chileshe

Purpose The purpose of this paper is twofold: first, to identify and rank the challenges influencing the delivery of the housing public-private partnership (HPPP) in Tanzania; and second, to suggest solutions in the form of a conceptual public-private partnership (PPP) framework model that will address the identified challenges and boost the chances of success. Design/methodology/approach Using a convergent parallel (concurrent) mixed method approach, data were collected from 28 stakeholders involved with HPPP projects in Tanzania using a hand-delivered and e-mail survey and 13 semi-structured interviews with public and private sector respondents. The quantitative data included subjecting the 19 challenges as identified from the literature to parametric tests such as one-sample t-tests and descriptive statistics tests such as measures of central tendencies and frequency analysis through Statistical Package for Social Sciences (SPSS 22.0). Qualitative data employed content analysis. The research was further underpinned by a number of theoretical perspectives such as Gidden’s structuration theory, contingency theory, relational and equity theory. Findings The top five ranked challenges influencing the delivery of HPPP were “inadequate PPP skills and knowledge”; “poor contracting and tendering documents”; “inadequate project management”; “inadequate legal framework”; and “misinformation on financial capacity of private partners”. The least six ranked and most significant challenges based on the one-sample (single) t-tests were as follows: “Poor risk allocation”; “inexperienced private partner”; “unequal qualification and contributions of expertise”; “poor enabling environment to attract competent partners”; “inadequate mechanisms for recovery of private investors’ capital”; and “high costs in procuring PPP projects”. The qualitative study further confirmed the challenges and cited the reason for the failure of joint venture projects as the lack of motivation for undertaking similar PPP projects. Despite the increased awareness of PPP projects and associated marginal benefits, the main impediment to the uptake and delivery of PPP housing projects remained the lack of skills and expertise. Research limitations/implications The proposed framework model is not yet tested, but since this paper is part of the ongoing research, the next stage involves the testing and validation of the model. Future studies could test the applicability of the proposed framework in other HPPP projects in Tanzania, and in other similar developing countries. Second, the validated framework can contribute towards addressing similar challenges as well as providing guidance. The proposed framework model is not yet tested, but since this paper is part of the ongoing research, the next stage involves the testing and validation of the model. Furthermore, recommendation for future research is to test the alignment of the identified challenges to the proposed remedial solutions across the five phases within the proposed PPP framework with a number of case studies. Practical implications The identified challenges were used to form the basis of the framework presented in this paper. Furthermore, these provide useful information, thus leading to increased awareness to enable successful delivery of HPPP in Tanzania. Similarly, both the government and policy makers could use the findings as the basis for re-examining the existing PPP policy and regulations, and reflecting on the existing situation with a view to improving the delivery of future HPPP projects. Originality/value The empirical study is among the first that identifies and ranks the challenges of PPP for housing projects delivery within the Tanzanian context. The identification of the challenges enabled their ranking, resulting in the mapping out of the most critical challenges. Furthermore, using the Gidden’s structuration theory, the study illustrates how institution mechanisms (structures) address these delivery challenges, thus influencing the implementation of HPPP in Tanzania, and how individual stakeholders (human agents or agency) are able to make choices (advocated solutions) in dealing with the challenges. More so, these constraints (challenges) as identified and viewed through the contingency and equity theoretical lenses form the foundation for developing the PPP conceptual framework. The proposed framework would thus serve as a mechanism for providing practical solutions as well as reducing the level of severity of the identified challenges.


2016 ◽  
Vol 4 (4) ◽  
pp. 30
Author(s):  
Nooriha Abdullah ◽  
Darinka Asenova ◽  
Stephen J. Bailey

The aim of this paper is to analyse the risk transfer issue in Public Private Partnership/Private Finance Initiative (PPP/PFI) procurement documents in the United Kingdom (UK) and Malaysia. It utilises qualitative research methods using documentation and interviews for data collection. The UK documents (guidelines and contracts) identify the risks related to this form of public procurement of services and makeexplicittheappropriateallocation of those risks between the public and the private sector PPP/PFI partners and so the types of risks each party should bear. However, in Malaysia, such allocation of risks was not mentioned in PPP/PFI guidelines. Hence, a question arises regarding whether risk transfer exists in Malaysian PPP/PFI projects, whether in contracts or by other means. This research question is the rationale for the comparative analysis ofdocumentsand practicesrelatingtorisk transfer in the PPP/PFI procurements in both countries. The results clarify risk-related issues that arise in implementing PPP/PFI procurement in Malaysia, in particular how risk is conceptualised, recognised and allocated (whether explicitly or implicitly), whether or not that allocation is intended to achieve optimum risk transfer, and so the implications forachievement ofvalue for moneyor other such objectivesinPPP/PFI.


2016 ◽  
Vol 16 (2) ◽  
pp. 42-55 ◽  
Author(s):  
Afeez Olalekan Sanni

The implementation of public private partnership (PPP) procurement method is expected to help governments in the development of infrastructures and provides an opportunity for the reduction in the governments’ debt profiles. This method has been adopted in Nigeria for more than a decade and with these years of implementation, few infrastructural projects have been developed using this method while some have been unsuccessful. This study aims to examine the PPP projects implementation in Nigeria and identify the most critical factors that could determine the success of such projects. A total of 184 questionnaires were received from public and private sectors’ participants in the implementation of PPP projects. An exploratory factor analysis identified seven critical success factors as projects feedback, leadership focus, risk allocation and economic policy, good governance and political support, short construction period, favourable socio-economic factors, and delivering publicly needed service. This study shows that more developmental projects could be delivered through PPP if the government could focus on these main factors in the implementation process. The result will influence policy development towards PPP and guide the partners in the development of PPP projects. 


Yuridika ◽  
2017 ◽  
Vol 32 (3) ◽  
pp. 541
Author(s):  
Yuniarti Yuniarti ◽  
Fifi Junita

The high level of Foreign Direct Investment (FDI) is also supported by the availability of infrastructure to the remote area where the investment will be implemented. However, with limited funds from both APBN and APBD, infrastructure development can not be fully done by the government. Therefore, the government will cooperate with the investor (private) in the implementation of infrastructure development known as public private partnership. The main problem in implementing PPP is the allocation of risk to PPP projects. The different bargaining positions between the government and the private sector resulted in the fact that most of them impose risks on private parties (private). Implementation of PPP is closely related to the emergence of various risks including and not limited to regulatory risks, force majeure, etc. If there is no risk allocation arrangement proportionally based on governance principles, it weakens the pattern of PPP cooperation in Indonesia. PPP as one form of risk sharing in infrastructure investment should not release the role and government support to private parties / investors. Even in practice, PPP implementation in Indonesia only relies on BOT (Build Operate and Transfer) scheme which is expected to minimize government support in project implementation. This will ultimately lead to project failure.


Author(s):  
James Edomwonyi Edokpolor ◽  
Adesuwa Imafidon

The aim of this research was to determine the effectiveness of Public-Private Partnership (PPP) in the management of TVET programme in the 21st century. The preferred method of inquiry was the survey research design. A total population of 44 lecturers from the Department of Vocational and Technical Education, University of Benin and Ambrose Alli University was used for the research. The instrument for data collection was a structured questionnaire, validated by two experts. The Cronbach alpha formula was used to determine the instrument reliability; which yielded the coefficient value of 0.87. 20 questionnaire items was administered to the respondents by the researchers. The mean, standard deviation and t-test statistical tools were used for the data analysis. The results of the research showed that PPP to a high extent can influence the optimization of financial resources, provision of qualified manpower, development of curricula and procurement of modern facilities. There was also no significant difference between the mean ratings of TVET lecturers in UNIBEN and AAU regarding the influence of PPP on the effective management of TVET programme in the 21st century. This indicates that TVET lecturers in both institutions have the same perception regarding the influence of PPP on the management of TVET programme. Based on these findings, 4 recommendations were made in the research. Keywords: inadequate resources, management, Public Private Partnership, TVET programme.