Pushing 30 Years Multiple Brown Fields Limits Through Artificial Lift and Facilities Improvement

2021 ◽  
Author(s):  
Mohd Hafizi Ariffin ◽  
Muhammad Idraki M Khalil ◽  
Abdullah M Razali ◽  
M Iman Mostaffa

Abstract Most of the oil fields in Sarawak has already producing more than 30 years. When the fields are this old, the team is most certainly facing a lot of problems with aging equipment and facilities. Furthermore, the initial stage of platform installation was not designed to accommodate a large space for an artificial lift system. Most of these fields were designed with gas lift compressors, but because of the space limitation, the platforms can only accommodate a limited gas lift compressor capacity due to space constraints. Furthermore, in recent years, some of the fields just started with their secondary recovery i.e. water, gas injection where the fluid gradient became heavier due to GOR drop or water cut increases. With these limitations and issues, the team needs to be creative in order to prolong the fields’ life with various artificial lift. In order to push the limits, the team begins to improve gas lift distribution among gas lifted wells in the field. This is the cheapest option. Network model recommends the best distribution for each gas lifted wells. Gas lifted wells performance highly dependent on fluid weight, compressor pressure, and reservoir pressure. The change of these parameters will impact the production of these wells. Rigorous and prudent data acquisitions are important to predict performance. Some fields are equipped with pressure downhole gauges, wellhead pressure transmitters, and compressor pressure transmitters. The data collected is continuous and good enough to be used for analysis. Instead of depending on compressor capacity, a high-pressure gas well is a good option for gas lift supply. The issues are to find gas well with enough pressure and sustainability. Usually, this was done by sacrificing several barrels of oil to extract the gas. Electrical Submersible Pump (ESP) is a more expensive option compared to a gas lift method. The reason is most of these fields are not designed to accommodate ESP electricity and space requirements. Some equipment needs to be improved before ESP installation. Because of this, the team were considering new technology such as Thru Tubing Electrical Submersible Pump (TTESP) for a cheaper option. With the study and implementation as per above, the fields able to prolong its production until the end of Production Sharing Contract (PSC). This proactive approach has maintained the fields’ production with The paper seeks to present on the challenges, root cause analysis and the lessons learned from the subsequent improvement activities. The lessons learned will be applicable to oil fields with similar situations to further improve the fields’ production.

2021 ◽  
Author(s):  
Sudhakar Khade ◽  
Rick Givens ◽  
Chuck Ware ◽  
Patrick Hobbs ◽  
Nils Van Der Stad ◽  
...  

Abstract An operator planned to install ESPs to overcome high water cut and minimize the gas supply risk for a gas lift completion at a platform in the Gulf of Mexico. The platform is an oil collection point and its continuous operation is essential during any rig-assisted interventions. To maintain platform operation, three wells were selected for deployment of rigless electrical submersible pump (ESP) replacement systems to avoid the future use of a workover rig. The challenge was to allow a single-trip ESP deployment using the crane facilities with existing height limitations. A special surface connection system was designed to allow long ESP sections to connect under pressure at the wellhead. The technology is based on a propriotery system and method of connecting long strings at the surface using a surface lubricator and an adapted deployment stack. The system elements are located between the pump intake and protector seal sections of a standard ESP string that can easily and economically sourced in most locations. This new technology reduces the number of wireline/slickline runs needed, and the system features allow verification of mechanical connection integrity at the surface prior to deployment in the well. The successful deployment and commissioning of a rigless ESP replacement system in the SM 130 A-26 well in the Gulf of Mexico was completed in October 2019 without incident. Prior to the deployment of the rigless ESP replacement system, it was decided to perform hydraulic stimulation operations to improve the well productivity. This operation resulted in higher than expected well inflow with increased water cut. At the time of writing this paper, the ESP system had recently failed to start due to stuck pump (possibly scale related). Due to the ability to perform a rigless system upgrade for the unanticipated well inflow conditions, the operator is planning for the first rigless replacement of the existing ESP to achieve higher flow rate during the last quarter of 2021. The successful deployment of the alternative ESP deployment technology demonstrated the potential to improve the economics of the existing production facilities by reducing production deferment, minimizing health, safety, and environment (HSE) exposure; and improving the asset value. This paper discusses the engineered solution and application of the technology required to deploy long ESP strings, modifications required for the specific well conditions, and the lessons learned during the first successful deployment of rigless ESP technology in the Gulf of Mexico. Due to the performance and capability demonstrated in the first successful installation, Talos Energy has recently installed its second rigless ESP replacement system in a recompleted zone and is planning for installing its third system in the SM 130 field in 2022.


2020 ◽  
Vol 17 (3) ◽  
pp. 150-155
Author(s):  
Tega Odjugo ◽  
Yahaya Baba ◽  
Aliyu Aliyu ◽  
Ndubuisi Okereke ◽  
Lekan Oloyede ◽  
...  

Hydrocarbon exploration basically requires effective drilling and efficient overpowering of frictional and viscosity forces. Normally, frictional power losses occur in deep well systems and it is essential to analyse each component of any well system to determine where exactly pressure is lost, and this can be done using Nodal Analysis. In this study, nodal analysis has been carried out with the use of PROSPER, a software for well performance, design and optimisation. Artificial lifts can then be used to solve the problem of frictional power losses. To increase the production of Barbra 1 well in the Niger Delta and hence extend its functional life, we have applied nodal analysis. Modelling results for three artificial lift methods; continuous gas lift, intermittent gas lift and electrical submersible pump were found to be 1734.93 bbl/day, 451.50 bbl/day and 2869 bbl/day respectively. The output from the well performance without artificial lift was 1370.99 bbl/day by applying Darcy’s model. Meanwhile, the output from the well without artificial lift is 89.90 bbl/day when aided with productivity index (PI) entry, the normal model for intermittent gas lift. Hence, from the comparative analysis of the results obtained from this study, it was deduced that when artificial lifts are employed, the well output increases significantly from 1370.99bbl/day to 2869 bbl/day (electrical submersible pump). This study concludes that wells such as Barbra 1 are good candidates for artificial lift, and this is evidenced by increasing productivity. Keywords: Production optimisation, nodal analysis, prosper simulator and barbra well.


PETRO ◽  
2019 ◽  
Vol 8 (1) ◽  
pp. 8
Author(s):  
Jonathan Jonathan ◽  
Sisworini Sisworini ◽  
Samsol Samsol ◽  
Hari Oetomo

<em>In the world of oil is very common in the production system. This production system produces oil from wells after drilling and well compressions. Over time, the production of a well may decrease due to several parameters of pressure drop and the presence of clay which makes the pipe diameter narrower. There are several methods used to increase the decrease in production including adding artificial lifts such as sucker rod pump, electric submersible pump and gas lift, reservoir stimulation and pipe cleaning if the pipe diameter is reduced due to clay. The well has been installed an artificial lift is a gas lift and this well need an optimization to increase its production. The EC-6 well optimization is planned by comparing the lift-up scenario of the gas lift by adjusting the rate of gas injection and deepening the orifice injection and also an installation of electrical submersible pump. Best percentage of optimization production from EC-6 Well, last scenario is chosen which is new installation artificial lift ESP from gas lift (existing) and gaining 18.52% form existing production</em>


2021 ◽  
Author(s):  
Priscilla Enwere ◽  
Ademola Amusa ◽  
Oluwafemi Olominu ◽  
Nchekwube Lazson ◽  
Emmanuel Mbonu ◽  
...  

Abstract Gas lift is currently being utilized as the artificial lift system in OML Z, this has been so for the last thirty years. Although, the field has seen significant increase in production rates in recent times, gas lift requirement has increased with increase in production and water cut. To maximize production and value from OML Z, it is expedient to seek an alternative artificial lift method that can debottleneck and unlock the potential of fields within OML Z where production has been less than 50% since the field was brought on stream. Production from the gas lifted fields within OML Z is constrained by a combination of bottlenecked gas lift facility and surface production facility. This study explores the different artificial lift methods and selects an applicable technology for OML Z using a developed selection criterion. Electrical Submersible Pump (ESP) found suitable for OML Z is further analyzed for feasibility and application within OML Z given existing limitations. The candidate reservoir and well selection criteria are elaborated upon, taking into consideration several elements that contribute to the production process. The results of the well and network models, that shows the significant gains attributed to the conversion of selected previously gas lifted wells to ESPs, are discussed. The economic benefit of such conversion is also shown.


2021 ◽  
Author(s):  
Mohammed Ahmed Al-Janabi ◽  
Omar F. Al-Fatlawi ◽  
Dhifaf J. Sadiq ◽  
Haider Abdulmuhsin Mahmood ◽  
Mustafa Alaulddin Al-Juboori

Abstract Artificial lift techniques are a highly effective solution to aid the deterioration of the production especially for mature oil fields, gas lift is one of the oldest and most applied artificial lift methods especially for large oil fields, the gas that is required for injection is quite scarce and expensive resource, optimally allocating the injection rate in each well is a high importance task and not easily applicable. Conventional methods faced some major problems in solving this problem in a network with large number of wells, multi-constrains, multi-objectives, and limited amount of gas. This paper focuses on utilizing the Genetic Algorithm (GA) as a gas lift optimization algorithm to tackle the challenging task of optimally allocating the gas lift injection rate through numerical modeling and simulation studies to maximize the oil production of a Middle Eastern oil field with 20 production wells with limited amount of gas to be injected. The key objective of this study is to assess the performance of the wells of the field after applying gas lift as an artificial lift method and applying the genetic algorithm as an optimization algorithm while comparing the results of the network to the case of artificially lifted wells by utilizing ESP pumps to the network and to have a more accurate view on the practicability of applying the gas lift optimization technique. The comparison is based on different measures and sensitivity studies, reservoir pressure, and water cut sensitivity analysis are applied to allow the assessment of the performance of the wells in the network throughout the life of the field. To have a full and insight view an economic study and comparison was applied in this study to estimate the benefits of applying the gas lift method and the GA optimization technique while comparing the results to the case of the ESP pumps and the case of naturally flowing wells. The gas lift technique proved to have the ability to enhance the production of the oil field and the optimization process showed quite an enhancement in the task of maximizing the oil production rate while using the same amount of gas to be injected in the each well, the sensitivity analysis showed that the gas lift method is comparable to the other artificial lift method and it have an upper hand in handling the reservoir pressure reduction, and economically CAPEX of the gas lift were calculated to be able to assess the time to reach a profitable income by comparing the results of OPEX of gas lift the technique showed a profitable income higher than the cases of naturally flowing wells and the ESP pumps lifted wells. Additionally, the paper illustrated the genetic algorithm (GA) optimization model in a way that allowed it to be followed as a guide for the task of optimizing the gas injection rate for a network with a large number of wells and limited amount of gas to be injected.


2021 ◽  
Author(s):  
Abdullatif Al-Majdli ◽  
Carlos Caicedo Martinez ◽  
Sarah Al-Dughaishem

Abstract Oil production in North Kuwait (NK) asset highly relies on artificial lift systems. The predominant method of artificial lift in NK is electrical submersible pump (ESP). Corrosion is one of the major issues for wells equipped with ESP in NK field. Over 20% of the all pulled ESPs in 2019 and 2020 in NK field were due to corrosion of the completion or the ESP string. With an increase in ESP population in NK, a proactive corrosion mitigation is essential to reduce the number of ESP wells requiring workover. Historic data of the pulled ESPs in NK revealed that most of the corrosion cases were found in the tubing as opposed to the ESP components. Although there are multiple factors that can cause corrosion in NK, the driving force was identified to be the presence of CO2 (sweet corrosion). Corrosion rates have been enhanced by other factors such as stray current and galvanic couples. In this paper, multiple methods have been suggested to minimize and prevent the corrosion issue such as selecting the optimal completion and ESP metallurgy (ex. corrosion resistant alloy), installing internally glass reinforced epoxy lined carbon steel tubing, and installing a sacrificial anode whenever applicable.


Author(s):  
Jorge Luiz Biazussi ◽  
Cristhian Porcel Estrada ◽  
William Monte Verde ◽  
Antonio Carlos Bannwart ◽  
Valdir Estevam ◽  
...  

A notable trend in the realm of oil production in harsh environments is the increasing use of Electrical Submersible Pump (ESP) systems. ESPs have even been used as an artificial-lift method for extracting high-viscosity oils in deep offshore fields. As a way of reducing workover costs, an ESP system may be installed at the well bottom or on the seabed. A critical factor, however, in deep-water production is the low temperature at the seabed. In fact, these low temperatures constitute the main source for many flow-assurance problems, such as the increase in friction losses due to high viscosity. Oil viscosity impacts pump performance, reducing the head and increasing the shaft power. This study investigates the influence of a temperature increase of ultra-heavy oil on ESP performance and the heating effect through a 10-stage ESP. Using several flow rates, tests are performed at four rotational speeds and with four viscosity levels. At each rotational speed curve, researchers keep constant the inlet temperature and viscosity. The study compares the resulting data with a simple heat model developed to estimate the oil outlet temperature as functions of ESP performance parameters. The experimental data is represented by a one-dimensional model that also simulates a 100-stage ESP. The simulations demonstrate that as the oil heat flows through the pump, the pump’s efficiency increases.


2021 ◽  
Author(s):  
Kuswanto Kuswanto ◽  
Oka Fabian ◽  
Orient B Samuel ◽  
Mohd Yuzmanizeil B Yaakub ◽  
Chua Hing Leong ◽  
...  

Abstract The B Field is located in the South China Sea, about 45 KM offshore Sarawak, Malaysia, in a water depth approximately 230 ft. Its structure is generally regarded as a gentle rollover anticline with collapsed crest resulting from growth faulting. The reservoirs were deposited in a coastal to shallow marine with some channels observed. Multiple stacked reservoirs consist of a series of very thick stacked alternating sandstone and minor shale layers with differing reservoir properties. The shallow zones are unconsolidated, and the wells were completed with internal gravel packs. Wells in B Field mostly were completed in multi-layered reservoirs as dual strings with SSDs and meant to produce as a commingled production. The well BX is located within B Field and designed as oil producer well with a conventional tubing jointedElectrical Submersible Pump (ESP) system which was installed back in 2008. Refer to figure 1, the initial completion schematic is 3-1/2″ single string that consist of the single production packer, gas lift mandrel, tubing retrievable Surface Controlled Subsurface Safety Valve (SCSSV) and ESP. The production packers equipped with the feed thru design to accommodate the ESP cable and the gas vent valve as part of the ESP completion design. The gas lift mandrel was installed in the completion string as a backup artificial lift method to receive the gas lift and orifice valve in the event of the conventional ESP failed. Hence the well still able to produce by introducing the gas thru the annulus to activate the gas lift valve. Eventually throughout the end of the the field life, the well would depend on the ESP system for the primary lifting method due to gas lift depth limitation and the gas supply. The conventional ESP failed after seven years of operation which is above the average ESP lifetime. The well last produced at a flow rate with 28 % water cut, however the well is not at the end of the field life. Based on the economical study with the right technology and cost efficient approach, the well still economicaly profitable. The Thru Tubing (TT) ESP technology is approached as cost effective solution compare to fully well workover. Despite a couple of operational challenges, for example, setting the cable hanger, maintaining downhole barrier requirement, the Thru Tubing Electrical Submersible Pump Cable Deployed (TTESP CD) and Cable Thru Insert Safety Valve (CT-ISV) was successfully installed. Several post-installation findings have uncovered some problems which are requiring some additional technical and operation improvement for future similar applications. This paper will highlight the deployment of the Cable Thru Insert Safety Valve (CT-ISV) that was successfully installed as pilot, which is the first application in the world, and also highlights the success, lesson learnt and improvement for future requirement for the CT-ISV application as one of the solution for retrofitting completion application without jeopardizing the well integrity. This achievement is collaboration between Company and service partner as the technology and deployment under the proprietary scope. Further technology application, the replication of this insert safety valve was conducted and successfully deployed on other three wells.


2020 ◽  
Vol 4 (4) ◽  
pp. 1-7
Author(s):  
Gomaa S

Artificial Lift is a very essential tool to increase the oil production rate or lift the oil column in the wellbore up to the surface. Artificial lift is the key in case of bottom hole pressure is not sufficient to produce oil from the reservoir to the surface. So, a complete study is carried to select the suitable type of artificial lift according to the reservoir and wellbore conditions like water production, sand production, solution gas-oil ratio, and surface area available at the surface. Besides, the maintenance cost and volume of produced oil have an essential part in the selection of the type of artificial lift tool. Artificial lift tools have several types such as Sucker Rod Pump, Gas Lift, Hydraulic Pump, Progressive Cavity Pump, Jet Pump, and Electrical Submersible Pump. All these types require specific conditions for subsurface and surface parameters to apply in oil wells. This paper will study the Electrical Submersible Pump “ESP” which is considered one of the most familiar types of artificial lifts in the whole world. Electrical Submersible Pump “ESP” is the most widely used for huge oil volumes. In contrast, ESP has high maintenance and workover cost. Finally, this paper will discuss a case study for the Electrical Submersible pump “ESP” design in an oil well. This case study includes the entire well and reservoir properties involving fluid properties to be applied using Prosper software. The results of the design model will impact oil productivity and future performance of oil well.


Author(s):  
Rycha Melysa

The condition of a well if it is produced continuously will cause reservoir pressure to fall, and the flow rate will also go down, as a result the productivity of the well will also decrease. For this reason, there is a need for energy that can help lift fluid up to the surface. In the primary method there are 2 stages of production, namely natural flow where oil is raised directly through the tubing surface, and artificial lift is the method of obtaining oil by using the aid of additional tools. In the oil industry there are various types of artificial lifts, one of which is an electric submersible pump (ESP).   Electric Submersible Pump is an electric pump that is immersed into a liquid. This pump is made on the basis of a multilevel centrifugal pump where each level has an impeller and iffuser which aims to push the fluid to the surface. ESP planning is strongly influenced by the roductivity of production wells. The rate of fluid production influences the selection of pump type and size. This is because each pump has its own production rate based on the type and size of each pump used.   In the course of producing oil, there will certainly be a problem that will cause a decline in production, therefore it is necessary to evaluate and redesign the ESP pump, in an effort to optimize the production potential of these wells. In this study an evaluation of the performance of the electrical submersible pump will be carried out and a pump redesigned to optimize production using AutographPC software on the well X in the field Y Kondisi suatu sumur jika diproduksikan terus-menerus akan mengakibatkan tekananreservoir turun, dan laju alir akan turun pula, akibatnya produktivitas sumur akan turunjuga. Untuk itu perlu adanya tenaga yang dapat membantu mengangkat fluida sampaikepermukaan. Dalam metode primer terdapat 2 tahapan produksi yaitu natural flowdimana minyak terangkat kepermukaan langsung melalu tubing, dan artificial liftmerupakan metode perolehan minyak dengan menggunakan bantuan alat tambahan.Dalam dunia perminyakan ada berbagai macam jenis pengangkatan buatan salahsatunya adalah electric submersible pump (ESP). Electric Submersibel Pump merupakan pompa listrik yang dibenamkan kedalam cairan.Pompa ini dibuat atas dasar pompa sentrifugal bertingkat banyak dimana setiap tingkatmempunyai impeller dan diffuser yang bertujuan untuk mendorong fluida kepermukaan.Perencanaan ESP sangat dipengaruhi oleh produktivitas sumur produksi. Laju produksifluida berpengaruh terhadap pemilihan jenis dan ukuran pompa. Hal ini dikarenakantiap-tiap pompa memiliki laju produksi sendiri berdasarkan jenis dan ukuran tiap- tiappompa yang dipakai. Dalam kegiatan memproduksikan minyak tentu suatu saat akan terjadi permasalahanyang mengakibatkan menurunnya produksi, Oleh karena itu perlu dilaksanakan evaluasidan design ulang pompa ESP, sebagai upaya untuk mengoptimalkan potensi produksisumur-sumur tersebut. Pada penelitian ini akan dilakukan evaluasi kinerja electricalsubmersible pump dan melakukan desain ulang pompa untuk optimasi produksidengan menggunakan software AutographPC pada sumur X lapangan y Kata kunci: electric submersible pump, AutographPC, laju produksi


Sign in / Sign up

Export Citation Format

Share Document