scholarly journals Development of Simulation Model for Proper Sales Price of Apartment House in Seoul

Buildings ◽  
2020 ◽  
Vol 10 (12) ◽  
pp. 244
Author(s):  
Kihyuk Kim ◽  
Jiyeong Yun ◽  
Sungjin Kim ◽  
Dae Young Kim ◽  
Donghoon Lee

The number of new homes built in China in 2014 doubled compared to 2004, while Korea has built more than 3000 units every year since 2004 and Japan has built more than 6000 new units. Apartments account for 60% of homes in Korea, so it is anticipated that apartment construction projects will not cease in Korea. The current company assumes that the sale rate (pre-sale rate) of apartments may be completely controlled by the pre-sale prices. The study calculated appropriate pre-sale prices to maximize the revenue of companies based on that assumption. For that purpose, the study identified the factors affecting the pre-sale prices and analyzed its correlation with the pre-sale prices based on the apartments located in Seoul, Korea. As a result of the analysis, it was found that the pre-sale prices of apartments are correlated with the number of apartment complexes, local rates, and local development level. The final result of the study suggested a way to calculate the sale prices using the factors that are thought to be correlated with the pre-sale prices. A simulation model was created using the method. When tested, it yielded an average deviation rate of 10.32%. The current study will contribute to preventing the economic losses that may be caused by apartment construction projects.

Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2019 ◽  
Author(s):  
Chem Int

Aflatoxins (AFTs) are toxic products of fungal metabolism, associated with serious health consequences and substantial economic losses to agriculture, livestock and poultry sectors, particularly in the developing countries. This review outlines the current information on AFTs in terms of historical background, classification, relative occurrence and co-existence with other mycotoxins in various food commodities. The phenomenon of aflatoxin (AFT) biosynthesis has been elucidated with reference to molecular basis, genetic regulation and factors affecting the AFT production. Moreover, the in vivo disposition kinetics, toxicological action and toxico-pathological consequences of AFTs have also been highlighted. Currently employed strategies for the detection and detoxification of AFTs, biomarkers of exposure assessment, potential economic impact and regulatory considerations regarding the AFTs have been emphasized.


Author(s):  
Song Gao ◽  
Tonggui He ◽  
Qihan Li ◽  
Yingli Sun ◽  
Jicai Liang

The problem of springback is one of the most significant factors affecting the forming accuracy for aluminum 3D stretch-bending parts. In order to achieve high-efficiency and high-quality forming of such kind of structural components, the springback behaviors of the AA6082 aluminum profiles are investigated based on the flexible multi-points 3D stretch-bending process (3D FSB). Firstly, a finite element simulation model for the 3D FSB process was developed to analyze the forming procedure and the springback procedure. The forming experiments were carried out for the rectangle-section profile to verify the effectiveness of the simulation model. Secondly, the influence of tension on springback was studied, which include the pre-stretching and the post-stretching. Furthermore, the influences of the bending radius and bending sequence are revealed. The results show that: (1) The numerical model can be used to evaluate the effects of bending radius and process parameters on springback in the 3D FSB process effectively. (2) The pre-stretching has little effect on the horizontal springback reduction, but it plays a prominent role in reducing the springback in the vertical direction. (3) The increase of bending deformation in any direction will lead to an increase of springback in its direction and reduce the springback in the other direction. Besides, it reduces the relative error in both directions simultaneously. This research established a foundation to achieve the precise forming of the 3D stretch-bending parts with closed symmetrical cross-section.


2021 ◽  
Vol 13 (11) ◽  
pp. 5795
Author(s):  
Sławomir Biruk ◽  
Łukasz Rzepecki

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.


2014 ◽  
Vol 505-506 ◽  
pp. 1148-1152
Author(s):  
Jian Qun Wang ◽  
Xiao Qing Xue ◽  
Ning Cao

The road traffic accidents caused huge economic losses and casualties, so it had been focused by the researchers. Lane changing characteristic is the most relevant characteristic with safety. The intent of lane changing was discussed. Firstly, the factors affecting the intent were analyzed, the speed satisfaction value and the space satisfaction value were proposed; then the data from the University of California, Berkeley was extracted and the number of vehicles changed lane more often and the vehicle ID were obtained; the BP neural network classification model was established, it was trained and testified by actual data. The results shown the method could predict the intent accurately.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.