scholarly journals Analysis of Formwork System Selection Criteria for Building Construction Projects: A Comparative Study

Buildings ◽  
2021 ◽  
Vol 11 (12) ◽  
pp. 618
Author(s):  
Taylan Terzioglu ◽  
Gul Polat ◽  
Harun Turkoglu

The formwork system (FWS) in reinforced concrete (RC) construction is a critical component. The appropriate FWS is selected based on a number of conflicting and compromising criteria, and the selection of the FWS is carried out by construction professionals with different technical and/or administrative backgrounds. The perspectives and perceptions of construction professionals and companies involved in the FWS selection process may vary depending on their motives. In addition, some building structural parameters may have a significant impact on the FWS selection criteria. Most of the former studies investigated the FWS selection criteria from only the perspective of contractors and neglected the potential differences in the perspectives and perceptions of different construction professionals (i.e., owners (CO), project managers (PM), construction managers (CM), site engineers (SE), planning engineers (PL), procurement engineers (PR), technical office engineers (TO), and formwork design and/or formwork sales engineers (FD/FSL)) and companies specialized in different fields (i.e., project management service (PMS), engineering and design (ENG/DSG), formwork and scaffolding (FW/SCF), and general and/or sub-contractor (GC/SC)) regarding this issue. Moreover, the impact of building structural parameters on the FWS selection criteria has not been investigated. This study aims to fill this knowledge gap through analysing the FWS selection criteria for building construction projects while comparing the perspectives and perceptions of different groups of construction professionals and companies and investigating how FWS selection criteria are affected by the building structural parameters. Based on a comprehensive literature review, 35 FWS selection criteria were identified and a questionnaire was developed. The questionnaire data obtained from 222 Turkish construction professionals were statistically analysed using mean score analysis, the Kruskal–Wallis test, and the Mann–Whitney U test. According to the study’s findings, the FD/FSL group presented significant statistical differences regarding the FWS selection criteria as compared to the CO, PM/CM/SE, and PL/PR/TO groups. Moreover, the total area of building construction and total building height significantly affected the FWS selection criteria. This study serves to underscore the perspectives of various groups of construction professionals and the critical connection between the structural parameters and FWS selection criteria. The findings of this study may guide construction professionals to select the appropriate FWS for their building construction projects.

2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2021 ◽  
Vol 39 (4) ◽  
pp. 1029-1034
Author(s):  
A. Nazif ◽  
A.K. Mustapha ◽  
F. Sani

Estimating of cost for building construction projects with minimum error at the conceptual stage of project development is quite  essential for planning. This study seeks to evaluate factors responsible for cost escalation of building construction projects.  Questionnaires were administered to examine and assess these factors. Subsequently, the mean score value of each factor was determined. In addition, Correlation and Linear regression analyses were used to establish the relationship between these factors. Factors responsible for cost escalation in projects were examined as well as the impact of those factors, and occurrence of those factors on project cost. The result of the analysis showed that, the most agreed factors responsible for project cost escalation were; inadequate supervision, irregular payment, and design error, having high mean values of 4.25, 4.20, and 4.15, respectively. Also, correlation analysis result established that the factors responsible for cost escalation and the impact of cost escalation had significant R and R2 of 0.81 and 0.70 respectively. Addressing these factors would go a long way in reducing the escalation of building project cost. Never the less, an effective cost management strategy is absolutely necessary to safeguard and sustain the construction  industry. Keywords: cost escalation, building project, construction, regression analysis


2021 ◽  
Vol 13 (23) ◽  
pp. 13085
Author(s):  
Jan Kowalski ◽  
Mieczysław Połoński ◽  
Marzena Lendo-Siwicka ◽  
Roman Trach ◽  
Grzegorz Wrzesiński

Exceeding the approved budget is often an integral part of the implementation of construction projects, especially those where unforeseen threats may occur. Therefore, each construction investment should contain elements of risk forecasting, mainly in terms of the cost of its implementation. Only a small number of institutions apply effective cost control methods, taking into account the specifics of a given industry. Especially small construction companies that participate in the structure of the implementation of large construction projects as subcontractors. The article presents a method by which it is possible to determine, with certain probability, the final cost of railway construction investments carried out in Poland. The method was based on a reliable database of risk factors published in sources. In this article, the main presumptions of the original method are presented, which take into account the impact of potential, previously recognized, risks specific to railway investments, and enable project managers to relate them to the conditions where the implementation of a specific object is planned. The authors assumed that such a relatively simple method, supported by a suitable computational program, would encourage teams that plan to implement railway projects to use it and increase the credibility of their schedules.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


2017 ◽  
Vol 873 ◽  
pp. 212-219
Author(s):  
Yu Ming Song ◽  
Ya Qin Wang ◽  
Yun Le

The existing literature shows that organizational culture has a significant impact on its performance. However, few studies probe into their relationship in the context of project. This study examines the impactmechanism of organization cultureon project performancethroughorganizational citizenship behavior (OCB) in the construction projects. A survey on 451 professionals served in the construction projects is conducted. The findings demonstrate that organizational culture influences project performance significantly. And clan culturehas greaterpositive effectsonproject performance than other three culture domains. The results also indicate OCB partially mediates the impact of organizationalcultureon project performance. These findings suggest that organizationalculture can be used by project managers as a lever to exert citizenship behaviors among project members and eventually improveproject performance. The managerialimplications are discussed.


2017 ◽  
Vol 21 (2) ◽  
pp. 111-133 ◽  
Author(s):  
Arunangshu Mukhopadhyay ◽  
Vinay Kumar Midha ◽  
Nemai Chandra Ray

Purpose This study aims to optimize the parametric combination of injected slub yarn to achieve least abrasive damage on fabrics produced from it. Design/methodology/approach Single base injected slub yarn structural parameters, vis-à-vis slub length, slub thickness and slub frequency, were varied during preparation of yarn samples under this research work. A total of 17 yarn samples were produced according to the Box and Bhenken design of the experiment. Subsequently knitted and woven (using injected slub yarns in the weft only) fabric samples were prepared from these yarns. Yarn and fabric samples were abraded with standard instruments to see the impact of yarn structural parameters on abrasive damage of fabric in terms of fabric mass loss and appearance deterioration. From the test results, empirical models relating to slub parameters and fabric abrasion behavior were developed through a backward elimination regression approach. Subsequently, a set of optimal parametric combinations was derived with multi-objective evolutionary algorithms by using MATLAB software. This was followed by ranking all optimal solutions through technique for order preference by similarity to idle solution (TOPSIS) score analysis. Findings The injected slub yarn’s structural parameters have a strong influence on the abrasive damage of knitted and woven fabric. It is seen that the best suitable parametric combination of slub parameters for achieving the least abrasive damage is not the same for knitted and woven fabric. Practical implications The spinner can explore this concept to find out the best suitable parametric combination during pattern making of injected slub yarn through MATLAB solution followed by TOPSIS score analysis based on their priority of criteria level to ensure better abrasion behavior of fabric produced. Originality/value Optimization of parametric combination of injected slub yarns will help to ensure production of fabric with most resistance to abrasion for specific applications. The studies showed that the optimal solution for woven and knitted fabrics is different. The result indicates that in the case of knitted fabric, comparatively lesser slub thickness is found to be suitable for getting better fabric abrasion resistance, whereas in the case of woven fabric, comparatively higher slub thickness is found suitable for the same.


Author(s):  
SPG Buba ◽  
BL Tanko

Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects) who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS). Likert Scale was used to measure the independent variables (leadership style): facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria) which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.


Author(s):  
Osama Salim Al Adawi ◽  
Said Salim Al Hina ◽  
Hussin A. M. Yahia ◽  
Ram Kishore Manchiryal

Organizations and companies who are working on construction sector within Oman are suffering from running into the bureaucracy process which established within the governmental stakeholders to obtain approvals and permissions like NOCs (No Objection Certificates). The objectives of this Research are to identify the impact of governmental stakeholders on delaying projects completion as a result of lengthy process of granting NOCs and subsequently design a platform which will guarantee a flat process for approaching information and issuing approvals. Three research methodologies have been implemented in this study. The first one was a quantitative where questionnaire distributed to selective personnel who are working in construction project environment and representing different local companies. The second one was a qualitative method where interviews with project managers, senior engineers and leaders in the construction field has been conducted to understand the impact caused by long approval process in their projects’ lifecycle. The third one was an expert system where an online platform is developed and sought to expedite the approvals process from governmental stakeholders and accordingly evaluate the compatibility and reliability of the system through selective personnel from the construction sector. The expected outcomes of this study are to achieve a solution with an aim at speeding up issuing NOCs and approvals obtainment as well as diminishing the needless processes practiced by governmental stakeholders in the built environment within Oman.


2019 ◽  
Vol 5 (12) ◽  
pp. 4001-4007
Author(s):  
Dorcas Omolola Adeagbo ◽  
◽  
Sani Mohammed ◽  
Sani Abdulkadir ◽  
◽  
...  

2021 ◽  
Vol 11 (3) ◽  
pp. 215-227
Author(s):  
Benedict Amade ◽  
Cosmas Ifeanyi Nwakanma

Abstract This study presents a fuzzy decision-making trial and evaluation laboratory (DEMATEL) analysis of the internet challenges of the internet of things (IoT) implementation of construction projects in Nigeria. The identification of the IoT challenges was carried out through a thorough literature search and discussions with 27 built environmental experts. In addition, DEMATEL, an expert judgement-based tool, was used to pick, design, and evaluate a structural model consisting of a causal relationship between defined IoT challenges. Subsequently, the fuzzy DEMATEL was deployed with a view to constructing a structural relationship between the various challenging factors by visualising the dynamic associations between them. Based on the findings of the literature survey and expert evaluation, 18 obstacles to the implementation of IoT in construction projects were classified into cause and effect classes based on their relative parameters of impact. The results suggest that 8 challenges were categorised into the cause group, while 10 were listed into the impact group. The results of this study will enable construction companies, construction industry experts, project managers in Nigeria to enhance their search to design and execute an effective and productive IoT application for their construction projects.