Research on the Impact Mechanism of Organizational Culture on Project Performance in Construction Projects

2017 ◽  
Vol 873 ◽  
pp. 212-219
Author(s):  
Yu Ming Song ◽  
Ya Qin Wang ◽  
Yun Le

The existing literature shows that organizational culture has a significant impact on its performance. However, few studies probe into their relationship in the context of project. This study examines the impactmechanism of organization cultureon project performancethroughorganizational citizenship behavior (OCB) in the construction projects. A survey on 451 professionals served in the construction projects is conducted. The findings demonstrate that organizational culture influences project performance significantly. And clan culturehas greaterpositive effectsonproject performance than other three culture domains. The results also indicate OCB partially mediates the impact of organizationalcultureon project performance. These findings suggest that organizationalculture can be used by project managers as a lever to exert citizenship behaviors among project members and eventually improveproject performance. The managerialimplications are discussed.

2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


Innovar ◽  
2015 ◽  
Vol 25 (56) ◽  
pp. 53-67 ◽  
Author(s):  
Maricela I. Montes-Guerra ◽  
Aida R. De-Miguel ◽  
M. Amaya Pérez-Ezcurdia ◽  
Faustino N. Gimena ◽  
H. Mauricio Díez-Silva

This article analyzes the adoption of project management practices in development cooperation NGOs and their influence on project performance. This paper illustrates the impact in the implementation of methodologies, techniques and tools on outcomes, measured by success criteria of several projects recently implemented. Information from the project managers of the organizations was collected, and complemented by a literature review. We analyzed the correlation among the variables that determine the adoption of a project, and the criteria that determine its success. The positive effect of project management adoption in the performance of cooperation projects is demonstrated, in spite of the low use of methodologies, techniques and tools within the sector. The article shows the importance of project management in cooperation and aid projects, with the purpose of increasing researchers' awareness about the field as applicable knowledge and about the benefits of its use in the sector. The paper shows that project management can improve project efficiency and accountability in other sectors.


2021 ◽  
Vol 13 (23) ◽  
pp. 13085
Author(s):  
Jan Kowalski ◽  
Mieczysław Połoński ◽  
Marzena Lendo-Siwicka ◽  
Roman Trach ◽  
Grzegorz Wrzesiński

Exceeding the approved budget is often an integral part of the implementation of construction projects, especially those where unforeseen threats may occur. Therefore, each construction investment should contain elements of risk forecasting, mainly in terms of the cost of its implementation. Only a small number of institutions apply effective cost control methods, taking into account the specifics of a given industry. Especially small construction companies that participate in the structure of the implementation of large construction projects as subcontractors. The article presents a method by which it is possible to determine, with certain probability, the final cost of railway construction investments carried out in Poland. The method was based on a reliable database of risk factors published in sources. In this article, the main presumptions of the original method are presented, which take into account the impact of potential, previously recognized, risks specific to railway investments, and enable project managers to relate them to the conditions where the implementation of a specific object is planned. The authors assumed that such a relatively simple method, supported by a suitable computational program, would encourage teams that plan to implement railway projects to use it and increase the credibility of their schedules.


2019 ◽  
Vol 5 (1) ◽  
pp. 13-19
Author(s):  
Fitri Nur Kharina ◽  
Kusno Adi Sambowo

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tim O. Peterson ◽  
Claudette M. Peterson ◽  
Brian W. Rook

Purpose The overall purpose of this paper is to determine to what extent organizational citizenship behaviors predict followership behaviors within medical organizations in the USA. This is the first part of a two-part article. Part 1 will refine an existing followership instrument. Part 2 will explore the relationship between followership and organizational citizenship. Design/methodology/approach Part 1 of this survey-based empirical study used confirmatory factor analysis on an existing instrument followed by exploratory factor analysis on the revised instrument. Part 2 used regression analysis to explore to what extent organizational citizenship behaviors predict followership behaviors. Findings The findings of this two-part paper show that organizational citizenship has a significant impact on followership behaviors. Part 1 found that making changes to the followership instrument provides an improved instrument. Research limitations/implications Participants in this study work exclusively in the health-care industry; future research should expand to other large organizations that have many followers with few managerial leaders. Practical implications As organizational citizenship can be developed, if there is a relationship between organizational citizenship and followership, organizations can provide professional development opportunities for individual followers. Managers and other leaders can learn how to develop organizational citizenship behaviors and thus followership in several ways: onboarding, coaching, mentoring and career development. Originality/value In Part 1, the paper contributes an improved measurement for followership. Part 2 demonstrates the impact that organizational citizenship behavior can play in developing high performing followers.


Author(s):  
Alexandra Marcos ◽  
Cristina García-Ael ◽  
Gabriela Topa

The present study aims to analyze the influence of work demands and resources (support and control) on the attitudes and behaviors (satisfaction, organizational commitment, and organizational citizenship behaviors toward the organization, OCBO) of Spanish police officers, and to examine the potential mediating role of the flexibility-oriented organizational culture. Participants were 182 Spanish police officers. The analysis was carried out using the Smart PLS (Partial Least Squares) program. Firstly, reliability and convergent and discriminant validity were analyzed. Secondly, the structural model was evaluated. Overall, findings support the hypothesized model, except there was not a significant effect of demands and support on OCBO (Organizational Citizenship Behavior Organization-oriented). Results of the importance-performance map analysis also show that, in terms of predicted job satisfaction and organizational commitment, control and support are not so important, but both of them perform relatively well compared to the remaining constructs (demands and flexibility-oriented culture).


Sign in / Sign up

Export Citation Format

Share Document