Factors Affecting Implementation of Resource Scheduling in Indian Construction Projects

2012 ◽  
Vol 174-177 ◽  
pp. 2782-2786
Author(s):  
M. Paranthaman Venkatesh ◽  
Balasubramanian Malathi ◽  
C. Umarani

This paper describes the factors affecting resource based scheduling and the barrier/constraints against the implementation of resource based scheduling in Indian construction project. However the traditional methods such as critical path method and program evaluation and review technique are based on time but actual work is not completed on time. Hence it becomes essential to follow a resource based schedule which is based on actual availability of resource to meet the project deadline. This paper mainly focuses the resource oriented scheduling techniques and it is helpful to investigate the implementation of scheduling, type of scheduling adopted, method of scheduling, status of scheduling implementation in various construction firm. The questionnaire survey was conducted to determine the factors affecting resource oriented scheduling implementation and barriers/constraints against its implementation in the Indian construction project. The collected data was analyzed using statistical tool. Prioritization of the factors by frequency analysis and average index method was carried out. The barriers/constraints against implementation of resource scheduling were identified and presented. Suitable suggestions for the Indian construction companies were given to promote and motivate the professionals entering the firm at the initial stage about the concepts of resource scheduling so that they have a genuine commitment in the implementation of resource scheduling.

Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2019 ◽  
Vol 9 (1) ◽  
pp. 14-17 ◽  
Author(s):  
Magdalena Kowacka ◽  
Dariusz Skorupka ◽  
Artur Duchaczek ◽  
Paweł Zagrodnik

AbstractThe work contains information on the implementation of surveying works in the road construction process. The aim of the research was to identify geodetic risk factors occurring at the stage of preparation of a construction project, the presence of which can greatly disrupt the undertaking such as the road construction. The research was carried out on the basis of expert knowledge, documentation obtained from various road construction projects and the analysis of disturbances at the initial stage of works.


2021 ◽  
Vol 9 (1) ◽  
pp. 17-24
Author(s):  
Mia Syafrina ◽  
Fandy Bestario Harlan

Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.


2020 ◽  
Vol 12 (21) ◽  
pp. 8918
Author(s):  
Kyunghwan Kim

Delays by limited supply of resources are common in many construction projects and may cause serious monetary disputes between project participants. Since the dispute resolution may require unnecessary additional time and cost, preventing delays in advance is an important goal in sustainable construction project management. To prevent delays, a feasible plan must be implemented, which reflects limited resources and provides reliable activity information. For this purpose, this study proposes a generalized resource-constrained critical path method (eRCPM). It consists of three steps to identify resource-dependent activity relationships (resource links) based on the result of resource-constrained scheduling (RCS) under multiple resource constraints. Compared to the existing resource-constrained critical path methods, the eRCPM has the advantage of identifying resource links irrespective of the applied RCS technique because it is based on the result rather than the RCS process. Further, this study presents a Microsoft (MS) Excel-based half-automated prototype system that is linked using file export and import functions to both P6 and MS Project software packages. The detailed process of the eRCPM algorithm and the operation process of the prototype system are described using an example schedule. Through a case study, it was demonstrated that eRCPM appropriately identifies the necessary resource links and provides reliable total floats.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


2017 ◽  
Vol 26 (2) ◽  
pp. 241-249 ◽  
Author(s):  
Jarosław Górecki ◽  
Jadwiga Bizon-Górecka ◽  
Karol Michałkiewicz

A paper focuses on analyzing the impact of Big Data (BD) on minimizing the risk in investment and construction projects. The work presents the aspects of risk occurring during the execution of the construction project. It presents an on-line survey which was aimed at knowing the opinion of Polish construction companies on the BD, and checking their readiness to implement technologies supporting manipulation of the data. It was underlined that results of the BD analysis provide a powerful tool for risk management, however, it is hardly noticed by the Polish respondents.


Author(s):  
Tuan Nguyen Anh ◽  
Tuong Le Manh ◽  
Tung Huynh Van

A country is called developed when the capacity and progress of science and technology have created products that always meet the requirements and increasing needs of people, ensuring stability and development of the nation in particular and the movement of the world in general. In Vietnam, the quality of goods is still modest. This exists not only from a macro perspective but also from a micro perspective and the transition from macro to micro because of a lack of orientation, or can be called the lack of "Product quality planning” [21,25] in terms of space. This paper will discuss the concepts of quality, expand the concept of quality with the aim of achieving good quality, meeting increasing requirements, need to perform the "quality planning" work under the space degree. The paper uses a mathematical tool based on the Cartesian coordinate system to determine the optimal value of product quality in order to demonstrate quantitatively according to the spatial frameworks when the quality is desired to achieve the required perfection through the magnitude of the "quality demand.” In a similar way, in order to get the construction project achieve the maximum quality, there must be adjustment solutions in 3 aspects. However, at present, in Vietnam in particular and the world in general, there have not been many in-depth studies on the formation of quality and the factors affecting the quality, especially the industrial construction projects [3]. Through the success or failure of investment projects in the form of public private partnerships (PPP) of countries around the world, including developed countries, the author thinks that in order for the project to be successful, it is necessary to apply construction product quality planning.


Author(s):  
Saurav Dixit

Abstract A construction project is like a living entity and requires the interconnection and coordination of several stakeholders and many of them have their objectives, which sometimes create a conflict of interest between the teams and within the teams. The success of any project is repeatable, and a set of attributes for the success of a construction project can be identified, requiring discipline and hard work. The construction sector is the engine of growth for a nation and supplies services and goods to other industries. The objective of the study is to analyse the enabling factors affecting the performance construction projects in Architecture Engineering and Construction industry. The methodology chosen for the study is to collect primary data from the Indian construction industry using structured questionnaire surveys. The collected data are analysed using reliability and factor analyses. The findings of the study provide the value of reliability, that is, Cronbach's alpha value of (0.86) of the data collected using a questionnaire survey. Furthermore, exploratory factor analysis produced five main significant factors based on covariance between the attributes and grouped into factors such as site management and coordination, leadership and financial management, planning, commitment, and coordination having a variance of 17.65, 11.8, 9.1, 8.5, and 7.5%, respectively. This article is the extended version of the paper accepted and presented at CCC2019.


Author(s):  
Meili Wu

Bidding is a key link during the implementation of a construction project. For the same construction project, there are usually multiple construction companies bidding together to obtain the right to contract for the project. However, there are still various irregularities in the bidding stage. This article analyzed the above problems and proposed a management strategy for the optimization of bidding, looking forward to improving the quality of bidding management of construction projects, solving various illegal bidding problems, and purifying the environment of bidding management.


2015 ◽  
Vol 9 (1) ◽  
pp. 73-81
Author(s):  
Wirach Hirun

The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1) trip rates for all vehicles, 2) trip rates for classified vehicles, and 3) trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.