Schedule Risk Management of Railway Station Project
2014 ◽
Vol 587-589
◽
pp. 1830-1835
Keyword(s):
Railway station is a comprehensive transportation hub. Its design and construction is far more complex than common public buildings, so as the construction management. This paper mainly explores the schedule risk management of railway station, including risk factors, risk indentation, risk evaluation and risk management. As many similar projects are under construction, Delphi technique method is most favorable for risk indentation. For risk evaluation, risk matrix method and CIM model are recommended to quantify the schedule risk. In the final part, the paper talks about the management of schedule risk. As schedule risk is abstract and its damage relatively slight, the risk prevention and mitigation are most suitable means.
2020 ◽
Vol 109
◽
pp. 103-116
2021 ◽
Vol ahead-of-print
(ahead-of-print)
◽
2012 ◽
Vol 209-211
◽
pp. 1350-1354
Keyword(s):
2002 ◽
Vol 21
(2)
◽
pp. 39-56
◽
Keyword(s):
2021 ◽
Vol 18
(16)
◽
pp. 8266
1981 ◽
Keyword(s):
2018 ◽
Vol 73
(2)
◽
pp. 143-146
Keyword(s):