scholarly journals Improving delay management of construction projects by creating a systematic scoring scale to minimise/avoid delays

Author(s):  
Mohammed Ahmed Mohammed Al Jashaami
2019 ◽  
Vol 11 (21) ◽  
pp. 5973
Author(s):  
Edwin Thomas Banobi ◽  
Wooyong Jung

Few studies have verified the different causes of project delays between the owner and contractor perspectives. This article’s goal is to find what the causes of delay are and how to mitigate this delay depending on project performance. Thus, this study investigated 82 owner-side experts and 106 contractor-side experts in Tanzanian power construction projects. In successful projects (less than 10% time delay), the owners and contractors weighted similar causes such as vandalism and permits from authorities. They suggested similar mitigation strategies such as close project supervision, capacity building training, and proper logistics management. While in unsuccessful projects (more than 10% time delay), they exhibited many different responses. In particular, contractors weighted the causes incurred by changes in scope, owner’s poor supervision, delays in approval, failure in planning and designing risk more than contractors. Owners weighted the mitigation strategies such as top management support and timely procurement more than contractors. These findings will help project managers to understand owners’ and contactors’ different concerns and develop better solutions. This study mainly contributes to improving delay management in power construction projects in developing countries.


Author(s):  
Ruveyda Komurlu ◽  
David Arditi

Construction projects are one-time endeavors with three strong constraints i.e., time, cost and quality. Construction management pursues success through the balanced accomplishment of the target levels of these. Since construction management has been and is still being performed to some extent by architects, AIA’s guidance has a strong influence on the profession. Thus, AIA’s “A201-2007 General Conditions of the Contract for Construction” is widely preferred among owners and contractors in the U.S. In Turkey, on the other hand, the government is the owner of a large number of public building projects with a total contract value that accounts for a sizeable portion of the national construction activity. Thus, the “General Conditions for Construction” that is issued by the Ministry of Environment and Urbanization is widely used in the industry. Delays have an important effect on both the owner and the contractor; while the owner experiences cost overruns as a direct result of delays, contractors suffer from excessive overhead. A201-2007 addresses the issue in “Article 8-Time”; the Turkish General Conditions addresses it in “Clause 30-Job Duration and Time Extension”. A literature review is performed in this paper to understand the importance of the deviations from the project duration specified in the contract. The objective of this study is to determine the similarities/differences in the management of delays, as mandated by the general conditions commonly used in the U.S. and Turkey. Recommendations are made in the light of the findings to improve delay management.


2021 ◽  
Vol 147 (3) ◽  
pp. 04021002
Author(s):  
Clara Mariana Katsuragawa ◽  
Gunnar Lucko ◽  
Shabtai Isaac ◽  
Yi Su

The issues of determining the estimated cost of capital construction projects with the involvement of Federal budget funds at the stage of development of project documentation, during verification of the accuracy of determining the estimated cost and the initial (maximum) contract price are considered. On the basis of the assessment of amendments to urban planning legislation for the purpose of implementing a state contract by the contractor ( based on the results of competitive procedures or without competitive procedures by decision of state authorities), the procedure for forming the estimate as part of a state (municipal) contract, the price of which is firm, is presented. For the purpose of mutual settlements between the customer and the contractor for the work performed, the formation of primary accounting documentation, as well as for checking the work performed by regulatory authorities, an example of drawing up an estimate of the state (municipal) contract on the basis of grouping costs according to structural elements and complexes of work is given. The result of the research conducted was the development of regulations and the formation of criteria for their practical application by state bodies, institutions, organizations and other participants in the investment-construction process, as well as recipients of budget funds, who perform the functions of the state (municipal) customer, developer and technical customer.


Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.