RESEARCH METHODOLOGY OF RAILWAY ROUTE DOBOJ – ZENICA, SECTION km 103+500 – MAGLAJ
Researched section of the railway route presents a part of the route from Sarajevo to Doboj, built withtwo tracks. First track was built in 1947, and the second in 1978. In construction methods are presentdifferences, considering the time when it was constructed and the way of construction. Both tracks wereused for years for movement of trains of various purposes and speeds up to 100 km/hour. Over time,the railroad worsened, especially at the beginning of the nineteenth century, when the train speed wasreduced on some sections to less than 40 km/hour. Revitalization of the railway was done by sectionswith the task to prepare it for train speed of 120 km/hour.Evaluation of railway route situation is given based on surveys carried out in the field andlaboratory tests of taken samples. The route was researched rigorously in its corridor, since it has amovement restriction on its wider area. Regular train lines were maintained which slowedinvestigations and some research works could not have been applied. Therefore, were appliedresearches that were possible to realize in high quality.