Aerobic granulation and nitrogen removal with the effluent of internal circulation reactor in start-up of a pilot-scale sequencing batch reactor
2012 ◽
Vol 35
(9)
◽
pp. 1489-1496
◽
Keyword(s):
2002 ◽
Vol 46
(9)
◽
pp. 219-227
◽
2012 ◽
Vol 97
(20)
◽
pp. 9235-9243
◽
2018 ◽
Vol 4
(4)
◽
pp. 569-581
◽
Keyword(s):
2011 ◽
Vol 102
(3)
◽
pp. 2536-2541
◽
Keyword(s):
1999 ◽
Vol 22
(12)
◽
pp. 990-996
◽
Keyword(s):
Keyword(s):
2019 ◽
Vol 16
(8)
◽
pp. 4215-4222
◽
Keyword(s):
2004 ◽
Vol 48
(11-12)
◽
pp. 319-326
◽