scholarly journals Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation

2019 ◽  
Vol 11 (1) ◽  
pp. 88-98 ◽  
Author(s):  
Wangping Qian ◽  
Taiyue Qi ◽  
Yunjian Zhao ◽  
Yizhou Le ◽  
Haiyang Yi
2018 ◽  
Vol 2018 ◽  
pp. 1-13 ◽  
Author(s):  
Wangping Qian ◽  
Taiyue Qi ◽  
Qing Zhao ◽  
Bingrong Pu ◽  
Jin Zhang ◽  
...  

Shallow buried shield metro tunnels constructed underneath subgrade project of high-speed railways are becoming increasingly common in China, but the lower metro tunnel bears the fatigue effect of dynamic load induced by the upper high-speed railway, so the long-term durability of segmental lining is a nonnegligible problem. The segmental lining structure of metro tunnel is in a state of static-dynamic loads for a long time, especially when a high-speed railway passes above the metro line, and the long-term durability of segmental lining needs further research. Based on theoretical analysis, the effect of different forms of loads on the fatigue life was analyzed, the change law of the static-dynamic loads on segmental lining was summarized, and the method was put forward to evaluate the fatigue life characteristics of segmental lining. The research results reveal that the additional dynamic load is the fundamental reason for the fatigue failure of the structure, and the existence of static load can cause and accelerate the occurrence of structural fatigue failure simultaneously. The results indicate that the fatigue life decreases gradually with the increase of static-dynamic load. Based on coupling analysis of static-dynamic loads of segmental lining, the fatigue life increases first and then decreases with the increase of buried depth of metro tunnel, and it remains unchanged when the depth exceeds a certain value. According to the actual metro tunnel engineering, by using ABAQUS software, a three-dimensional numerical simulation was carried out to analyze the characteristics of the fatigue life and evolution rules of segmental lining. Based on the modified fatigue life formula and metro service life, the optimization design of the buried depth was carried out to determine the most reasonable range of the buried depth. This study provides a valuable reference for safe operation and long-term durability of metro tunnels under high-speed railways.


2012 ◽  
Vol 446-449 ◽  
pp. 2581-2589
Author(s):  
Xiao Bei Shi ◽  
Kai Wei ◽  
Bing Long Wang ◽  
Da Wei Huang

Depending on a project of constructing a tunnel of high-speed railway which crosses underneath the foundation of tall buildings in weathered rock area, the paper analyzes the failure process and its law of anti-seismic mortar anchors under the foundation of tall buildings by simulating the whole process of construction with finite element model. Then the coverage scope, influence rules and extent of tunnel excavation on the anti-pulling effect and stability of mortar anchors are analyzed according to the changes of lateral pressure and axial force of anti-seismic mortar anchors before and after construction. The results show that the influence area can be divided into three parts, of which the main area where the anti-seismic mortar anchors are badly affected is on the top of the tunnel and extends horizontally to a certain range. Finally, the paper gives an applicable method to estimate the area where the anti-seismic mortar anchors should be strengthened by grouting, which also applies to the similar projects in weathered rock area.


2021 ◽  
Vol 2021 ◽  
pp. 1-24
Author(s):  
Yueguan Yan ◽  
Qian Yang ◽  
Zhihui Jia ◽  
Xiaoyi Zhang ◽  
Huayang Dai ◽  
...  

In modern life, metro and high-speed rails have become indispensable transportation and have been playing an important role in many areas, especially in cities. The metro and high-speed rails have varying degrees of impact on the surface and surrounding buildings, which must be carefully understood to minimize the risk of hazards. This work is aimed at investigating the deformation of ground surface and the surrounding structures, caused by the excavation of underground tunnels. Because of the spatiotemporal characteristics of the land subsidence induced by underground tunnel construction, the measurements obtained from InSAR (Synthetic Aperture Radar Interferometry) and leveling techniques are integrated to study the subsidence phenomenon of the ground surface above the shield tunnels and the surrounding buildings. The subsidence-related parameters, including the advance angles, lag angles, and boundary angles, are derived from the deformation results. This study suggests that leveling and InSAR observations can provide technical support to study the subsidence of dense buildings on the surface of shield tunnel excavation and to protect the surrounding environment.


2013 ◽  
Vol 831 ◽  
pp. 423-429
Author(s):  
Xiao Jing Wang ◽  
Kai Xu

This paper is based on one project of Metro shield tunnel across a high-speed railway bridge. In the study the impact of train operations is taken into account, the finite-element method is adopted to analyze effect of shield tunneling. The conclusions indicate that according to the different tunnels and relative positions of pile, the excavation of the tunnels would have different effects on pile foundation. When the construction of shield across the bridge, the nature of the soil and will have an effect on deformation and stress of pile. Due to tunnel excavation of bridge internal force on bridge attached to the forces of good roles and bad role. Additional deformation of the beams and the additional forces are very small, so they will not affect the bridge work.


2012 ◽  
Vol 446-449 ◽  
pp. 1989-1992
Author(s):  
Yun Long Shangguan ◽  
Qing Wang ◽  
Cen Cen Niu ◽  
Ke Wang ◽  
Yan Ge Zhang

With the high speed railway construction in our country, the launch of the railway engineering will inevitably lead to all kinds of engineering geological problems, resulting in the construction and operation of landslides, sudden gushing mud, rock blasting and other diseases. So with geological environment and engineering geological conditions of the station tunnel excavation , analysis and evaluate the influence of the engineering geological conditions of the tunnel, put forward the measures and suggestions for the engineering, and provide the basis for tunnel design and construction .


2021 ◽  
Vol 283 ◽  
pp. 01047
Author(s):  
Qun Luo ◽  
Tianlong Zhao

The study on deformation characteristics of structural plane is the research foundation of structural plane mechanics and hydraulics. In this paper, a calculation method for dynamic evaluation of the stability of slope controlled by structural plane based on deformation characteristics was proposed on the basis of shear reinforcement three-fold line constitutive model, and it was applied to the example of Raytheon landslide in Chongqing-Guizhou high-speed railway. By comparison, the calculated results were in good agreement with the measured displacement results, and the displacement development process of the dangerous rock mass can be well simulated, thus verifying the feasibility and engineering practicality of the method.


2021 ◽  
Vol 325 ◽  
pp. 01005
Author(s):  
Linda Ali ◽  
I Gde Budi Indrawan ◽  
Hendarto Hendarto

This paper presents the investigation of surface geology and subsurface engineering geology to analyze the excavation method and stand-up time of the DK99-DK100 Jakarta-Bandung high-speed railway Tunnel, Indonesia. Rock mass quality, tunnel excavation method, and stand-up time determined using Geological Strength Index (GSI), Basic Quality (BQ) systems, converted to Rock Mass Rating (RMR) and The Japan Society of Civil Engineering (JSCE) for comparison. The result shows that the study area consists of slightly to completely weathered andesite breccia and slightly weathered andesite lava. The rock masses at the tunnel elevation had very poor to poor quality and were associated with high weathering degrees. The recommended rock excavation method based on the GSI is digging. The recommended tunnel excavation method based on RMR is multiple drifts, top heading, and bench, while based on JSCE is bench cut method. The tunnel stand-up time is 30 minutes - 2 hours based on the RMR, while it is predicted to be unstable without support based on the BQ. The recommended design is expected to be applied effectively according to the geological conditions. It is expected to understand better the tunnel excavation method in poor rock masses, especially in Indonesia.


Sign in / Sign up

Export Citation Format

Share Document