Discussion on Integrated Design of Emergency Storage Facilities for Dangerous Chemicals Transportation Accidents and Bridge Drainage Run off Treatment Facilities of Expressway
Keyword(s):
Run Off
◽
Based on the investigation on the collection and treatment of the runoff from the bridge-deck of some expressways involving sensitive water bodies, this paper proposed an integrated design idea of the emergency storage facility and the bridge-deck rainwater runoff treatment facility for the transportation accident of dangerous chemicals in the expressway. The integrated design idea improves the disadvantages of simultaneous treatment of rainwater and accident-water in the bridge-deck runoff treatment system. The process flow, plane layout, functional unit volume design, conversion device, and control system involved in the integrated design are discussed.