scholarly journals IoT and 5G enabled construction detection model

2021 ◽  
Vol 1209 (1) ◽  
pp. 012009
Author(s):  
H Begić

Abstract The Fourth Industrial Revolution (4IR) introduced positive changes to some industries, while for most construction industries it is still enthusiastically anticipated. The 4IR focusing on the construction industry in literature is known as Construction 4.0. The Construction 4.0 concept is invoked to transform the current ways the construction industry operates while ensuring benefits, such as reduced overall construction projects’ costs and duration, improved quality and work safety, etc. Due to the increasing web usage, it is anticipated that the 4IR technologies will achieve full potentials by the uprising of the fifth generation technology standard for broadband cellular networks (i.e. 5G). One of the most important 4IR technologies is found to be the Internet of Things (IoT). In this perspective, a construction monitoring approach, more precisely a model for construction detection and object spatial/time positioning, is presented in this paper. While still in its initial phase, the model was tested and verified in the laboratory environment for small-scale object detection. It was found that the quality of the model will be significantly improved with the use of the 5G network, while the objects’ pool, as big data required for the model’s deep learning, is highly dependent on the IoT.

Author(s):  
Reneiloe Malomane ◽  
Innocent Musonda ◽  
Chioma Sylvia Okoro

The fourth industrial revolution (4iR) technologies offer an opportunity for the construction industry to improve health and safety (H&S) compliance. Therefore, implementing the technologies is of top priority to improve the endless H&S incidents in construction projects, which lead to poor quality of work, late project delivery, and increased labour injury claims. Central to improving the nature of work and other industrial processes, the 4iR technologies have emerged. Concurrent with this trend is the importance of 4iR technologies in enhancing health and safety performance on construction sites. However, the implementation of 4iR technologies in the construction industry is faced with various challenges. Therefore, this paper reports on a study aimed at examining the challenges associated with implementing 4iR technologies in the construction sector in South Africa towards effective management of H&S. The study followed a systematic literature review, data collection using a questionnaire survey and thereafter, descriptive, and inferential analyses were conducted. The findings revealed that the implementation of 4iR technologies is challenged by a lack of adequate relevant skills, the unavailability of training capacities, expensive technologies, and negative perceptions such as fear of job loss by industry professionals. The findings are essential for the advancement of H&S research and implementation. In addition, the findings are important to industry decision-makers in order to elevate their awareness and promote the use of 4iR technologies to manage construction activities. The study implications include the need for the construction industry to collaborate with higher education institutions to conduct research and include 4iR in the curriculum.


Author(s):  
Peter Dodzi Kwasi Agbaxode ◽  
Sitsabo Dlamini ◽  
Ehsan Saghatforoush

A meta-synthesis approach was used to identify, synthesize, and categorize appropriately factors in the literature that contribute to design documentation quality. The categories include factors on quality attributes, quality indicators, and quality-influencing factors. Findings indicate that the quality of design documentation in practice is unsatisfactory, therefore, there is a need for collaboration between the owner, designers, and end-users to improve design documentation quality. The results offer pragmatic data on design documentation quality in the construction industry between the years 1992 and 2019. However, further research on the significant impacts of poor-quality design documentation on construction projects is recommended.


2020 ◽  
Vol 2020 ◽  
pp. 1-10
Author(s):  
Thu Anh Nguyen ◽  
Phong Thanh Nguyen ◽  
Sy Tien Do

The construction industry has played an essential role in the process of modernization and industrialization and it has also been a major factor in determining the development of the infrastructure for other economic sectors. Construction companies consider the measurement of work progress, which often wastes time and has a low resolution, to be one of the most challenging problems faced by project management. Therefore, this research aimed to propose practical solutions by applying recent technological achievements of the 4.0 industrial revolution to improve the efficiency of the quantity management process. By utilizing the advantages and features of a BIM model and 3D laser scanning, this paper proposes that adopting a BIM model and 3D laser scanning has the potential to improve the accuracy and efficiency of the quantity management process. The case study demonstrated some typical tasks to evaluate accuracy and efficiency as well as to showcase the research proposal.


2020 ◽  
Vol 9 (1) ◽  
pp. 1
Author(s):  
Qian Yang

<p>With the rapid development of social economy, the demand for new energy is also increasing, and then the problem of large consumption also has a negative impact on the development of the construction industry. Under the concept of green building, the design and construction units pay more attention to energy conservation and environmental protection, so they actively use photovoltaic new energy in the field of electrical energy conservation of construction projects, so as to improve people's quality of life. Starting from the principles and characteristics of building electrical energy conservation, this paper discusses the methods of building electrical energy conservation, and analyzes how to use photovoltaic new energy in the field of building electrical energy conservation, hoping to better practice the concept of energy conservation.</p>


2021 ◽  
Vol 2 (4) ◽  
Author(s):  
Mansur Hamma-adama ◽  
◽  
Abdul-Basit Sa’eed Ahmad ◽  

Construction Industry is evolving amid the fourth industrial revolution. Transportation, commerce, manufacturing and many other industries ripened the current technological advancement and are striving to utilise every development in the IT sector. The procurement of construction works is known to be very conventional and backward in the adoption of digitalisation. The construction industry's procurement and supply chain are blamed for the most inflated cost of construction projects, mainly attributed to a lack of transparency and trust between the industry stakeholders. This research explores the challenges of E-procurement adoption in the industry and identifies the potential opportunities for its usage. This investigation's data are acquired through interviews, and the data are analysed using qualitative content analysis. This study reveals compounding challenges (i.e., corruption and lack of commitment) that lead to the failure of such efforts in Nigeria and the potential prospects (i.e., transparency and efficiency). This study is essential in developing a more effective and transparent process of procurement so that the Nigerian construction industry is not be left behind in the fast-digitalising markets.


Author(s):  
Phudit Ampririt ◽  
Ermioni Qafzezi ◽  
Kevin Bylykbashi ◽  
Makoto Ikeda ◽  
Keita Matsuo ◽  
...  

The fifth generation (5G) network is expected to be flexible to satisfy quality of service (QoS) requirements, and the software-defined network (SDN) with network slicing will be a good approach for admission control. In this paper, the authors present and compare two fuzzy-based schemes to evaluate the QoS (FSQoS). They call these schemes FSQoS1 and FSQoS2. The FSQoS1 considers three parameters: slice throughput (ST), slice delay (SD), and slice loss (SL). In FSQoS2, they consider as an additional parameter the slice reliability (SR). So, FSQoS2 has four input parameters. They carried out simulations for evaluating the performance of the proposed schemes. From simulation results, they conclude that the considered parameters have different effects on the QoS performance. The FSQoS2 is more complex than FSQoS1, but it has a better performance for evaluating QoS. When ST and SR are increasing, the QoS parameter is increased. But, when SD and SL are increasing, the QoS is decreased. When ST is 0.1, SD is 0.1, SL is 0.1, and the QoS is increased by 32.02% when SR is increased from 0.3 to 0.8.


2018 ◽  
Vol 44 ◽  
pp. 00057
Author(s):  
Xeniya Malinina ◽  
Juriy Shamara ◽  
Zhanna Petukhova

In this article we carry out the analysis of the possible directions and consequences of transformations of the existing models for implementation of investment-construction projects in relation with integration of information technologies and the construction industry in modern Russia. Such integration is considered as the most useful tool to solve such chronicle problems of the construction industry as low quality of works, missed deadlines and sustaining the best ratio “price-quality” for the customer. The basis for such integration is the technologies of informational modeling of construction objects. We investigated two basic models: disintegrated purchases and integrated purchases whose transformation will be directed towards development of mechanisms of partnership between participants of investment-construction projects, expanded use of “integrated” contracts in the system of state purchases of construction works and further centralization of control in the system of construction for state purposes.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2007 ◽  
Vol 34 (1) ◽  
pp. 19-36 ◽  
Author(s):  
Yasemin Nielsen ◽  
Bilge Erdogan

Quality of communication is a key factor in the success of construction projects. Visualization technologies can play an important role in improving the quality of data by improving human comprehension and increasing the depth of the information delivered. Visualization has for some time been identified as one of the major technology themes allowing development of construction processes. However, visualization has not been embraced as a strategic tool by construction companies, and they generally fail to take full advantage of available visualization tools. This paper aims to evaluate the extent of visualization as a communication tool in the construction industry and to determine potential benefits to be gained through implementation of visualization. The current state of the use of visualization for communication in Turkish architecture, engineering, and construction companies is mapped through surveys and interviews. Information flow contents and types are analysed to determine the types of information in the construction process that may benefit from visual representation. According to the priorities of the expectations ranked by the users and the potential of different visualization tools, the level of visualization required for each data flow is determined by a quality function deployment (QFD) based approach.Key words: visualization, construction, visual communication, quality.


2020 ◽  
Vol 5 (9) ◽  
pp. 1049-1053
Author(s):  
Onyekachukwu G. Odenigbo ◽  
Koleola T Odusami ◽  
Kevin C. Okolie ◽  
Vincent C. Okafor

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.