Factors affecting the accuracy of cost estimate: case of Jordan

2018 ◽  
Vol 25 (1) ◽  
pp. 113-131 ◽  
Author(s):  
Muhammad T. Hatamleh ◽  
Mohammed Hiyassat ◽  
Ghaleb Jalil Sweis ◽  
Rateb Jalil Sweis

Purpose Cost estimating process is an important element within the project life cycle. Comprehensive information, expanded knowledge, considerable expertise, and continuous improvement are needed to obtain accurate cost estimation. The purpose of this paper is to identify the critical factors that affect accuracy of cost estimation and evaluate the degree to which these factors are important from contractors’ and consultants’ viewpoints. Design/methodology/approach Qualitative and quantitative research approaches were adopted in collecting and analyzing the data, and testing the hypotheses. Based on the literature review, a questionnaire was prepared and then was modified according to the results of face-to-face open-ended interviews conducted with 11 project managers. The final version of the questionnaire was distributed to a random sample of 265 respondents. For analyzing the collected data Kendall’s and Mann-Whitney tests were conducted. Findings The analysis revealed that there is a strong agreement between contractors and consultants in the ranking of the factors related to consultant, contractor, design parameters, and information. A slightly weak agreement between contractors and consultants was noted regarding the factors related to market conditions (external factors) and factors related to project characteristics. Furthermore, the results show that the top ten factors affecting the accuracy of cost estimate are clear and detail drawings and specification, pricing experience of construction projects, perception of estimation importance, equipment (cost/availability/performance), project complexity, clear scope definition, accuracy and reliability of cost information, site constraints (access, storage, services), material availability, financial capabilities of the client, and availability of database of bids on similar project (historical data). Originality/value Offers an original view of the concept of accuracy of cost estimates as it relates to the efficiency of the project relying on both literature review and empirical evidence.

2019 ◽  
Vol 18 (4) ◽  
pp. 787-819
Author(s):  
Tala Hassan Dandan ◽  
Ghaleb Sweis ◽  
Lilana Salem Sukkari ◽  
Rateb J. Sweis

Purpose The purpose of this paper is to identify factors affecting cost estimate accuracy in each of five design stages preceding building construction: order of magnitude, conceptual/schematic, detailed design, construction document and bid phase. Design/methodology/approach Data were collected using an online survey completed by 138 respondents who work in design consultancy firms in Jordan, including project managers, architects and quantity surveyors (QSs). Survey responses were analyzed using descriptive statistics. Confirmatory interviews and case study comparisons were used to confirm the statistical analysis results. Findings The results of this study indicated that each design stage’s cost estimate was affected by several factors. Two significant factors were common across four of the five design stages: client experience and project team experience. In addition, a high level of agreement was observed among the project managers, architects and QSs regarding the factors affecting cost estimate accuracy. Originality/value Accurately estimating building construction costs during the design process has posed a challenge for designers and their clients in Jordan. Despite the care and effort involved in preparing cost estimates in each of the five design stages, deviations are commonly observed. Because the accuracy of building construction cost estimates directly affect the success or failure of a project, the results of this study can be used to reduce uncertainties in building construction cost estimation and subsequently increase the likelihood of project success


2018 ◽  
Vol 8 (3) ◽  
pp. 293-304 ◽  
Author(s):  
Chukwuka Christian Ohueri ◽  
Wallace Imoudu Enegbuma ◽  
Ngie Hing Wong ◽  
Kuok King Kuok ◽  
Russell Kenley

Purpose The purpose of this paper is to develop a motivation framework that will enhance labour productivity for Iskandar Malaysia (IM) construction projects. The vision of IM development corridor is to become Southern Peninsular Malaysia’s most developed region by the year 2025. IM cannot realise this foresight without effective labour productivity. Previous studies have reported that the labour productivity of IM construction projects was six times lower than the labour productivity of Singapore construction projects, due to lack of motivation among IM labourers, and a shortage of local skilled labour. Therefore, there is a need to study how to motivate IM construction labourers, so as to increase their productivity. Design/methodology/approach A quantitative research method was used to collect data from IM construction skilled labourers and construction professionals, using two sets of questionnaire. The respondents were selected using a purposive sampling technique. In total, 40 skilled labourers and 50 construction professionals responded to the questionnaire survey, and the data were analysed using Statistical Package for Social Science software (version 22). Findings The analysis revealed the major factors that motivate labourers participating in IM construction projects. The factors were ranked hierarchically using Relative Importance Index (RII) and the outcome of the ranking indicated that effective management, viable construction practices, financial incentives, continuous training and development, and safe working environment were the most significant motivation strategies that positively influence IM construction labourers. Originality/value The study developed and validated a framework that can be used to boost the morale of IM construction labourers, so that their productivity can be increased. Implementation of the established motivation framework will also lead to career progression of IM construction labourers, based on the training elements in the framework. This career prospect will attract local skilled labourers to participate in IM construction projects.


2018 ◽  
Vol 16 (1) ◽  
pp. 25-43 ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Nermeen Mohamed Amin Abdelwahab

Purpose The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects. Design/methodology/approach A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities. Findings ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP. Research limitations/implications This paper focused only on the integration of RM into ADP. Originality/value The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2019 ◽  
Vol 121 (2) ◽  
pp. 492-504 ◽  
Author(s):  
Waqar Ahmed ◽  
Arsalan Najmi ◽  
Hafiz Muhammad Faizan ◽  
Shaharyar Ahmed

PurposeThe purpose of this paper is to empirically analyze the factors affecting Muslim consumers’ willingness to pay (WTP) for Halal food, products and operations by employing theory of reasoned action.Design/methodology/approachThis study has used quantitative research methodology and collected data from 350 questionnaires from a densely populated city of Pakistan. Partial least squares-structural equation modeling was used to analyze the data.FindingsThe results show that the concerns about Halal, religiosity, perception of usefulness of Halal and product ingredients have a significant impact on WTP for Halal foods, while attitude has an insignificant impact on WTP. Moreover, the extent of demand for Halal certification is significantly affected by WTP.Originality/valueThe study highlighted the concerns of the Muslim consumers with respect to Halalness of the products and operations despite living in a Muslim country. It is recommended that the policy makers, food authorities and health institutions should conduct regular inspections of foods, products and producers’/manufacturers’ operations to ensure that all the procedures from manufacturing of the raw material till the finished goods follow Islamic principles to make them completely Halal.


2015 ◽  
Vol 6 (3) ◽  
pp. 206-222 ◽  
Author(s):  
Kanda Sorn-in ◽  
Kulthida Tuamsuk ◽  
Wasu Chaopanon

Purpose – The purpose of this paper is to study the factors affecting the development of e-government by using a citizen-centric approach. Design/methodology/approach – This paper is a mixed-methods study consisting of qualitative and quantitative research. Data were collected from government agencies using a structured interview and questionnaire about e-government services. The research was collected from the people responsible for the management of an e-government project in 75 government agencies. In addition, the researcher collected data from 1,400 citizens by using an e-Survey questionnaire that grouped participants by age. Findings – By using a citizen-centric approach, the paper identified the factors affecting the development of e-government. There were five factors from the viewpoint of government agencies and citizen groups: quality of e-government services, policy and governance, information technology infrastructure, organization and economy and society. Research limitations/implications – The research covered the development patterns of e-government for services from government to citizens only. Practical implications – Seeing the importance of environmental factors for both service providers and service users would facilitate continuous improvement of e-government service provision by government agencies. Social implications – The results reflect citizens’ need for e-government services; quality is their priority. Hence, government agencies must consider the quality of the delivery of information and e-government services as they relate to the lifestyles and needs of citizens. Originality/value – The creation of knowledge from merging e-government concepts with citizen-centric principles is a modern government sector management theory. This research stresses the need for the government sector to see the need for e-government and to recognize the factors for its successful development. This means the design and development of e-government services should respond to the increasing needs of the citizens.


2019 ◽  
Vol 27 (1) ◽  
pp. 17-43 ◽  
Author(s):  
Patrick Velte

PurposeThe purpose of this paper is to summarize the key findings of meta-analyses in accounting, auditing and corporate governance research.Design/methodology/approachA structured literature review on 63 meta-analyses related to financial accounting, management accounting, auditing, and corporate governance is conducted.FindingsMost of the previous meta-analyses have been focused on the topic of corporate governance with a clear focus on board composition as an independent variable and by integrating research- and country-specific moderating variables. Meta-analyses in management accounting are rare; furthermore, no meta-analysis in tax accounting has been published yet.Originality/valueMeta-analyses on these topics are expected to become increasingly important in the following years because of the increased number of empirical quantitative research. This literature review gives useful insights for research, practice and regulation.


2021 ◽  
Vol 9 (3) ◽  
pp. 52-57
Author(s):  
Yasir Mohamed Hassan Amin ◽  
Mohamed Abdulla Nugdalla Ahmedi

Quality management is considered one of the most important obstacles facing the construction industry in Sudan. The application of a quality assessment system contributes to the development of quality in projects as it is possible to measure the quality in projects. This paper aims to introduce one of the quality assessment systems, which is the system followed and applied in the Singapore (CONQUAS). This system assesses quality based on structural, architectural, mechanical and electrical work. The paper also aims to study the factors affecting the application of the quality assessment system in Sudan. The study is carried out in the region of Khartoum. The study is focusing on the construction projects. The study is carried out by questionnaires and other literature review. The respondents are consultants and contractors. The data has been distributed and analyzed by using the Average Index. From the study it was found that CONQUAS standard is assessed the building based on workmanship standards by the assessors from the BCA on site using standard score sheets. The assessment is done throughout the construction process for structural, mechanical and electrical works, and from questionnaire results the main factors affect construction industry in Sudan is lack of standardization in Sudan. The author recommended that more study shall be conducted to identify factors affecting quality in Sudanese construction industry and how to improve the quality.  


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Soud Alelaimat

Purpose This study aims to identify the factors affecting the political participation of Jordanian university students, especially their voting in national and local elections. The study examines the impact of gender, age, family income and regional affiliation that represent important social and economic factors affecting political participation on the voting of Jordanian university students. Design/methodology/approach Quantitative research method was used in this study. The study population contained three Jordanian universities representing the various segments of the Jordanian society: Al-Al Bayt University (Northern Region), Jordanian University (Central Region) and Mu'tah University (Southern Region). The study relied on a purposive sample of 900 students, 300 students per university (150 males and 150 females). The survey was conducted in the academic year 2018-2019. A questionnaire reviewed by two jurors (peer reviewers) was used to collect the data. Findings The study concluded that the gender, age, family income and regional affiliation factors affect the voting of Jordanian university students in national and local elections. The more the gender varies, the more the voting shifts in favor of males students. The more the age varies, the more the voting shifts in favor of older students. The more the family income varies, the more the voting shifts in favor of high-income students. The more the regional affiliation varies, the more the voting shifts in favor of Jordanians students. Originality/value This study is an approach to interpret the factors affecting voting of Jordanian university students, such as gender, age, family income and regional affiliation, which led to different voting in the national and local elections.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Qian Chen ◽  
Daniel Mark Hall ◽  
Bryan Tyrone Adey ◽  
Carl Thomas Haas

PurposeManaging stakeholders' reciprocal interdependencies is always a challenging issue. Stakeholders need to find out different ways to communicate information and coordinate material flows during the supply chain processes. Many recent studies have advanced construction supply chain coordination from multiple perspectives. However, the field still lacks a comprehensive analysis to summarize existing research, to explicitly identify all the possible enablers for coordination and to investigate how the enablers can be carried out at the supply chain interfaces. To fill the gap, this study aims to conduct a systematic review in order to examine the relevant literature.Design/methodology/approachA systematic literature review process was conducted to identify and synthesize relevant publications (published in the past 20 years) concerning the coordination of construction supply chain functions. These publications were coded to link main research findings with specific enabler categories. In addition, how these enablers can be used at the interfaces across supply chain processes was reviewed with an in-depth analysis of reciprocal communications between stakeholders at design-to-production, production-to-logistics and production-to-site-assembly phases.FindingsThe coordination enablers were classified into three categories: (1) contractual enablers (including subtopics on relational contracts and incentive models), (2) procedural enablers (including subtopics on multiagent knowledge sharing systems and the last planner system) and (3) technological enablers (including subtopics on linked databases for design coordination, design for manufacturing software platforms and automated monitoring technologies). It was found that interfacing different functions requires a certain level of integration of stakeholders for quick response and feedback processes. The integration of novel contractual forms with digital technologies, such as smart contracts, however, was not adequately addressed in the state of the art.Research limitations/implicationsThe scope of the systematic review is limited to the static analysis of selected publications. Longitudinal studies should be further included to sharpen the inductions of enablers considering organizational changes and process dynamics in construction projects.Practical implicationsDifferent enablers for coordination were summarized in a concise manner, which provides researchers and project stakeholders with a reinforced understanding of various ways to manage reciprocal interdependencies at different supply chain interfaces.Originality/valueThis study constitutes an important input for research on the construction supply chain by illuminating the thematic topic of coordination from inductively developed review processes, which included a holistic framing of the emerging coordination enablers and their use across supply chain functions. Consequently, it closes some identified knowledge gaps and offers additional insights to improve the supply chain performance of construction projects.


Sign in / Sign up

Export Citation Format

Share Document