scholarly journals Managing information flow and design processes to reduce design risks in offsite construction projects

2019 ◽  
Vol 26 (2) ◽  
pp. 267-284 ◽  
Author(s):  
Monty Sutrisna ◽  
Jack Goulding

PurposeFollowing the increasing need for faster construction, improved quality and evidence value propositions, offsite construction is increasingly being proffered as a viable contender to “traditional” construction approaches. However, whilst evidence supports the move towards offsite, its uptake has been lower than expected. Whilst the precise reasons for this seem to be influenced by a number of issues, including contextual drivers and market maturity; some project stakeholders also view offsite as carrying greater risks. The purpose of this paper is to report on the quality of information flow, in particular, the impact and influence of this on design risks in offsite construction projects.Design/methodology/approachAn existing design risk framework is used as the point of departure for this research. This is further expanded into a specific model for evaluating offsite construction projects design risks, the rubrics of which were informed by two case studies of offsite construction projects in Australia and the UK analysed with a process-tracing technique. Whilst these cases were geographically separated, the constructs were aligned to uncover fundamental design information requirements and concomitant risks associated with offsite.FindingsThe findings of the research reported in this paper include the crucial information feeding into the design process emanating from the lifecycle of offsite construction projects, namely, design, offsite (manufacturing), handling and transporting, site works and installation and also occupancy. These are contextualised within the four categories, namely, client requirements, project requirements, regulation aspects and social aspects and the final outcomes were summarised into a holistic diagram.Originality/valueGiven that the offsite construction has shifted the working paradigm into assigning a significant level of efforts and emphasis at the front end of the construction projects, the importance of its design process and hence design risks management has gone up significantly in construction projects delivered using this technique. This research and paper contributes significantly to the built environment domain by identifying the crucial aspects along the project lifecycle to be considered to minimise the potential occurrence of design risks and hence increasing the confidence of project stakeholders in adopting offsite construction techniques in their projects.

2020 ◽  
Vol 12 (2) ◽  
pp. 530
Author(s):  
Hosang Hyun ◽  
Hyunsoo Kim ◽  
Hyun-Soo Lee ◽  
Moonseo Park ◽  
Jeonghoon Lee

In modular construction projects, unit production and onsite work are conducted concurrently, enabling shorter duration, lower cost, and improved quality. Because of the nature of the work, building design details should be determined early in the design phase, which requires information from participants. However, the design process for stick-built construction does not include such information, which leads to errors in design, such as omissions and conflicts of information from participants, causing reworking in the design phase. To reduce errors, an information flow should be identified representing when/what/how the information should be shared, and with whom. This paper proposes an integrated design process based on the information flow. To identify the flow, a precedence relationship between activities is represented using a dependency structure matrix (DSM). Then, the order of activities is rearranged using a partitioning algorithm. In this manner, unnecessary feedback and reverse information flow, which are related to errors, are reduced. Finally, the rearranged activities are proposed as an integrated design process. To validate the impact of the proposed process and methodology, interviews with experts were conducted. The validation results suggest that the project delivery method should also be considered in the early project phase in practical application.


2018 ◽  
Vol 16 (1) ◽  
pp. 25-43 ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Nermeen Mohamed Amin Abdelwahab

Purpose The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects. Design/methodology/approach A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities. Findings ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP. Research limitations/implications This paper focused only on the integration of RM into ADP. Originality/value The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2015 ◽  
Vol 39 (4) ◽  
pp. 298-314 ◽  
Author(s):  
Simon Smith ◽  
Peter Stokes

Purpose – This paper aims to examine and assess the reputational impact of the logo and symbols of the UK Standard Investors in People (IiP). The extant literature highlights differing opinions in terms of the likely benefits that IiP generates following achievement of the Standard. This paper focuses specifically on the perceptions of reputational claims made regarding existing employees, potential employees and customers. Design/methodology/approach – The debate is explored through 38 interviews using the perceptions of managers and frontline employees within six IiP-accredited firms and one non-accredited firm. Findings – The study indicates that the logo and symbols of the Standard have minimal meaning and significance for the interviewees and their outlook on potential employees and customers. There were some indications, however, that the wider reputational implications of carrying the logo may have some potentially beneficial effects. Originality/value – The paper concludes that the overarching findings present a potentially serious issue for IiP, and that there is a need to understand further the impact and value of the logo and symbols.


2016 ◽  
Vol 16 (3) ◽  
pp. 307-322 ◽  
Author(s):  
Hossein Karimi ◽  
Timothy R.B. Taylor ◽  
Paul M. Goodrum ◽  
Cidambi Srinivasan

Purpose This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications The projects used to construct the database are heavily weighted towards industrial construction. Practical implications There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Davide Contu ◽  
Elgilani Eltahir Elshareif

Purpose This paper aims to estimate willingness to accept (WTA) hypothetical nuclear energy projects and the impact of net perceived benefits across three countries: Italy, a country without nuclear plants in operation; the UK, a country with nuclear plants in operation and the United Arab Emirates (UAE), which has more recently opted for the inclusion of nuclear energy in its energy mix. These valuations can support cost-benefit analyses by allowing policymakers to account for additional benefits and costs which would be otherwise neglected. Design/methodology/approach Data collection was conducted through online nationwide surveys, for a total of over 4,000 individuals sampled from Italy, the UK and the UAE. The surveys included choice experiments designed to elicit preferences towards nuclear energy in the form of WTA, indicating estimated compensations for welfare worsening changes and questions to measure perceived risks and benefits. Findings The average WTA/Km is the lowest for the case of the UAE. What is more, perceived net positive benefits tend to decrease the WTA required by the UAE respondents? Moreover, across the cases, albeit to a lesser extent with regard to Italy’s case, there is evidence that a more positive benefit perception seems to increase the valuation of environmental and public benefits offered as part of the experiment. Originality/value The contribution of this study is primarily twofold: first, it provides a comparison of WTA values in a context where the availability of choice experiment data is scant; second, it assesses whether and to what extent perceived net positive benefits of nuclear energy impact WTA of nuclear energy projects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Prabod Dharshana Munasinghe ◽  
D.G.K. Dissanayake ◽  
Angela Druckman

Purpose The process of fashion design varies between market segments, yet these variations have not yet been properly explored. This study aims to examine the fashion design process as practised at the mass-market level, as this is the most vibrant and the largest market segment in terms of production volumes and sales. Design/methodology/approach It is observed that 15 semi-structured interviews were conducted with mass-market fashion designers. Key activities of the mass-market design process were identified and a comparative analysis was conducted with the general design process. Findings The mass-market design process is found to prioritise profits rather than aesthetic aspects, with the buyer exercising more power than the designer. This hinders creativity, which, in turn, may impede a move towards more environmentally benign designs. Originality/value The clothing industry is responsible for high environmental impacts and many of these impacts arise through decisions made in the design stage. In particular, the mass-market for clothing because of its high volume of sales and fast throughput, accounts for a great deal of the impact. However, little is understood about the design process that is practised in the mass-fashion market. This paper fills the gap by developing a framework that describes the mass-market design process. Understanding the design process will enable progress to be made towards achieving the United Nations Sustainable Development Goal 12: Responsible Consumption and Production.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Steve Lambert ◽  
Dean Wilkinson

Purpose The outbreak of the severe acute respiratory syndrome coronavirus 2 virus and subsequent COVID-19 illness has had a major impact on all levels of society internationally. The extent of the impact of COVID-19 on prison staff and prisoners in England and Wales is unknown. Testing for COVID-19 both asymptomatic and symptomatic, as well as for antibodies, to date, has been minimal. The purpose of this paper is to explore the widespread testing of COVID-19 in prisons poses philosophical and ethical questions around trust, efficacy and ethicacy. Design/methodology/approach This paper is both descriptive, providing an overview of the widespread testing of COVID-19 in prisoners in England and Wales, and conceptual in that it discusses and argues the issues associated with large-scale testing. This paper provides a discussion, using comparative studies, of the issues associated with large-scale testing of prisoners across the prison estate in England and Wales (120 prisons). The issues identified in this paper are contextualised through the lens of COVID-19, but they are equally transferrable to epidemiological studies of any pandemic. Given the prevalence of COVID-19 globally and the lack of information about its spread in prisons, at the time of writing this paper, there is a programme of asymptomatic testing of prisoners. However, there remains a paucity of data on the spread of COVID-19 in prisons because of the progress with the ongoing testing programme. Findings The authors argue that the widespread testing of prisoners requires careful consideration of the details regarding who is included in testing, how consent is gained and how tests are administered. This paper outlines and argues the importance of considering the complex nuance of power relationships within the prison system, among prisoner officers, medical staff and prisoners and the detrimental consequences. Practical implications The widespread testing of COVID-19 presents ethical and practical challenges. Careful planning is required when considering the ethics of who should be included in COVID-19 testing, how consent will be gained, who and how tests will be administered and very practical challenges around the recording and assigning of COVID-19 test kits inside the prison. The current system for the general population requires scanning of barcodes and registration using a mobile number; these facilities are not permitted inside a prison. Originality/value This paper looks at the issues associated with mass testing of prisoners for COVID-19. According to the authors’ knowledge, there has not been any research that looks at the issues of testing either in the UK or internationally. The literature available details countries’ responses to the pandemic rather and scientific papers on the development of vaccines. Therefore, this paper is an original review of some of the practicalities that need to be addressed to ensure that testing can be as successful as possible.


2018 ◽  
Vol 4 (4) ◽  
pp. 513-526 ◽  
Author(s):  
Daniel Baxter ◽  
Jenny Flinn ◽  
Lucrezia Flurina Picco

Purpose The purpose of this paper is to investigate major event related terrorism and the resulting challenges that event professionals may face when hosting major events in cities as part of a destination marketing strategy. Design/methodology/approach The research was based in the UK due to the significant rise in terrorist activities that have taken place in its urban cities in recent years. The exploratory nature of this study utilised semi-structured interviews with UK event professionals, enabling a preliminary, in-depth investigation of the challenges that events professionals face as a result of major event related terrorism. Findings The research findings identify three challenges faced by event professionals when organising major events: knowledge and understanding in relation to major event related terrorism; the impact of major event related terrorism in terms of responsibility and accountability; and managing for major event related terrorism in budgetary terms. Research limitations/implications The research is limited to the UK, other destinations will pose their own unique challenges when hosting and managing events. It is suggested that this research be evaluated against similar studies in other destinations. This is a preliminary study and each of the topics identified within the findings warrant further exploration in their own right. Originality/value The paper offers an insight into the challenges faced by event professionals in the UK when delivering major events as part of a destination marketing strategy. With the increase in major event related terrorism in cities the findings of this research are of relevance not only to event professionals but anyone with a role in destination and tourism development.


2019 ◽  
Vol 12 (2) ◽  
pp. 242-266 ◽  
Author(s):  
Derek Walker ◽  
Beverley Lloyd-Walker

Purpose The purpose of this paper is to explore recent literature on the impact of changes in the workplace environment and projected trends through to the year 2030. This allows the authors to identify and discuss what key trends are changing the nature of project organising work. The authors aim to identify what knowledge and which skills, attributes and experiences will be most likely valued and needed in 2030. Design/methodology/approach This paper is essentially a reflective review and is explorative in nature. The authors focus on several recent reports published in the UK and Australia that discuss the way that the future workforce will adapt and prepare for radical changes in the workplace environment. The authors focus on project organising work and the changing workplace knowledge, skills, attributes and experience (KSAE) needs of those working in project teams in 2030 and beyond. The authors draw upon existing KSAE literature including findings from a study undertaken into the KSAEs of project alliance managers working in a highly collaborative form of project delivery. Findings The analysis suggests that there is good and bad news about project workers prospects in 2030. The good news is that for those working in non-routine roles their work will be more interesting and rewarding than is the case for today. The bad news is that for workers in routine work roles, they will be replaced by advanced digital technology. Research limitations/implications Few, if any, papers published in the project organising literature speculate about what this discipline may look like or what KSAEs will be valued and needed. Practical implications This paper opens up a debate about how project management/project organising work will be undertaken in future and what skills and expertise will be required. It also prompts project managers to think about how they will craft their careers in 2030 in response to expected work environment demands. This will have professional and learning implications. Social implications The issue of the future workplace environment is highly relevant to the social context. Originality/value This paper is about a projected future some 12 years onward from today. It bridges a gap in any future debate about how project organising jobs may change and how they will be delivered in the 2030s.


2019 ◽  
Vol 35 (1) ◽  
pp. 1-2 ◽  
Author(s):  
John J. Oliver ◽  
Newton Velji

Purpose This paper aims to discuss the emerging theme of risk aversion in entrepreneurs following high levels of industry consolidation. Design/methodology/approach This paper is a viewpoint on the authors’ opinion and interpretation of industry consolidation. Findings The UK Independent TV Production Industry has experienced a remarkable degree of consolidation with corporate acquisitions and mergers changing the size, shape and revenue distribution among firms in the industry. In addition, entrepreneurs appear to be more risk averse in terms of entering the industry. Practical implications If the trend in entrepreneurs in the UK TV Production Industry being more risk averse continues, then the number of new startup firms will fall and that could put the future of the industry at jeopardy. Originality/value This paper presents an interesting observation on the impact of consolidation of the UK Independent TV Production Industry, in so far as, entrepreneurs appear to be becoming more risk averse.