Managing projects as a mode of temporal ordering. Performative organising of time and temporality in projects

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Yannick Kalff

Purpose Project studies analyse either managing practices or the temporal nature of project management, which leaves open a research gap: the temporality of managing practice. The paper demonstrates that performativity theory with a temporal perspective helps us to understand how managing a project organises limited temporal resources by aligning activities, deadlines or milestones to reach a goal in a given time.Design/methodology/approach The article utilises empirical data and grounded theory methodology. Ten interviews with project managers from two companies support empirically guided theory building and conceptual reasoning.Findings The article extends John Law's “modes of ordering” to a project-specific mode of temporal ordering. This mode of temporal ordering describes the underlying rationale of project managers who assign, order and materialise time to generate the temporal structure of the project.Research limitations/implications The conceptual nature of the paper and its limited empirical data restrict the generalisation of the findings. The article's goal is to initiate further research and to offer a set of tools for such research.Originality/value The contribution links managing practice and temporality in a performativity approach. This link focusses the actual actions of the managers and contextualises them in the temporal flow of the project. Managing projects as a mode of temporal ordering describes how project managers enact temporal structures and how they themselves and their activities are temporally embedded.

2014 ◽  
Vol 7 (3) ◽  
pp. 449-472 ◽  
Author(s):  
Morten Emil Berg ◽  
Jan Terje Karlsen

Purpose – This study provides insight into how project managers can use leadership tools to encourage and develop positive emotions among the project team members toward greater overall project success. The purpose of this paper is to provide the engineering industry with a closer look at how positive emotions can create good team member relations, reduce stress, develop clearer roles, creativity and joy at the workplace. Design/methodology/approach – The empirical data were obtained using in-depth interviews of three experienced project managers. Findings – The empirical data give insight as to how project managers can use their signature strengths. Additionally, the data also show how they can evolve and draw on positive meaning, positive emotions and positive relations. Various examples of positive meaning, positive emotions, positive relations and signature strengths have been identified and discussed. Research limitations/implications – Future research should apply a more comprehensive research design, for example a survey using a larger sample, so that these findings may be generalized. Practical implications – The paper contributes to portray and analyze positive psychology in a project management setting. Additionally, the paper assists understanding the connections among positive meaning, positive emotions, positive relations and signature strengths by presenting and discussing a model. Originality/value – This research extends current understanding of how project managers use their signature strengths to encourage and develop positive emotions in project teams.


2020 ◽  
Vol 24 (2) ◽  
pp. 375-387
Author(s):  
Jenni Mikkonen ◽  
Ira Lahovuo

Prior studies have recognized the importance of events in destination branding, but the focus has been on the roles of mega-events or sport events, while smaller cultural and freetime events have received far less attention. The stakeholder involvement in destination branding has also been attracting interest lately by many researchers, but there is lack of knowledge on how to utilize events in the branding processes. This study aims to fill the research gap through a case study in the South Savo region, eastern Finland. The purpose of this study is to examine the roles events have in destination branding, and how events are involved in cocreating the destination brand. The empirical data were collected through 13 semistructured interviews of event organizers and local tourism developers. The study identified four different roles and several involvement methods. The findings revealed the importance and potential of organized events in the branding, but it also revealed that they are not yet effectively utilized at the destination. However, there is a consensus about the importance of stakeholder involvement and a common will towards involving events in the branding process. The findings of this study can be utilized by tourism developers and stakeholders to improve destination branding processes.


Kybernetes ◽  
2019 ◽  
Vol 49 (4) ◽  
pp. 1083-1102
Author(s):  
Georgios N. Aretoulis ◽  
Jason Papathanasiou ◽  
Fani Antoniou

Purpose This paper aims to rank and identify the most efficient project managers (PMs) based on personality traits, using Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE) methodology. Design/methodology/approach The proposed methodology relies on the five personality traits. These were used as the selection criteria. A questionnaire survey among 82 experienced engineers was used to estimate the required weights per personality trait. A second two-part questionnaire survey aimed at recording the PMs profile and assess the performance of personality traits per PM. PMs with the most years of experience are selected to be ranked through Visual PROMETHEE. Findings The findings suggest that a competent PM is the one that scores low on the “Neuroticism” trait and high especially on the “Conscientiousness” trait. Research limitations/implications The research applied a psychometric test specifically designed for Greek people. Furthermore, the proposed methodology is based on the personality characteristics to rank the PMs and does not consider the technical skills. Furthermore, the type of project is not considered in the process of ranking PMs. Practical implications The findings could contribute in the selection of the best PM that maximizes the project team’s performance. Social implications Improved project team communication and collaboration leading to improved project performance through better communication and collaboration. This is an additional benefit for the society, especially in the delivery of public infrastructure projects. A lot of public infrastructure projects deviate largely as far as cost and schedule is concerned and this is an additional burden for public and society. Proper project management through efficient PMs would save people’s money and time. Originality/value Identification of the best PMbased on a combination of multicriteria decision-making and psychometric tests, which focus on personality traits.


2019 ◽  
Vol 26 (4) ◽  
pp. 337-351 ◽  
Author(s):  
Jacob Brix

PurposeThe purpose of the study is to investigate how the processes of exploration and exploitation have developed in parallel in the literature of organizational ambidexterity and organizational learning, since James March published his seminal paper in 1991. The goal of the paper is to provide a synthesis of exploration and exploitation based on the two areas of literature.Design/methodology/approachThe study is conceptual and no empirical data have been used.FindingsThe study advances current understanding of exploration and exploitation by building a new model for organizational ambidexterity that takes into account multiple levels of learning, perspectives from absorptive capacity and inter-organizational learning.Originality/valueThe study’s novelty lies in the creation and discussion of a synthesis of exploration and exploitation stemming from organizational ambidexterity and organizational learning.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Shazia Nauman ◽  
Ata Ul Musawir ◽  
Hina Munir ◽  
Imran Rasheed

PurposeThis study examines the mechanisms and conditions that influence how transformational leadership affects project success through the lens of social information processing theory.Design/methodology/approachA dual-stage moderated mediation model was proposed wherein the effect of transformational leadership on project success is mediated by team building, and empowering climate moderates the direct and indirect effects at both the first and second stages. The model was tested based on 370 survey responses of project management practitioners from Pakistan's IT industry. The measurement model was analyzed using confirmatory factor analysis (CFA). Moderated mediation analyses were conducted using Hayes' PROCESS macro.FindingsThe findings suggest that team-building partially mediates the effect of transformational leadership on project success. Furthermore, the conditional indirect effect of transformational leadership on project success via team-building is strengthened at both the first and second stages at higher levels of empowerment climate.Practical implicationsIt is recommended that project managers and project-intensive organizations should strive to cultivate an empowerment climate to fully realize the beneficial effects of transformational leadership behaviors in enhancing positive team outcomes and, consequently, overall project performance.Originality/valueThis study broadly contributes to the literature on the influence of project managers' leadership styles on project outcomes. Specifically, we elucidate the role of empowerment climate as an important boundary condition that enhances the beneficial effects of transformational leadership. Furthermore, we extend the application of social information processing theory to the context of projects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2021 ◽  
Vol 31 (3) ◽  
pp. 468-490
Author(s):  
Saad Zighan ◽  
Ziad Alkalha ◽  
David Bamford ◽  
Iain Reid ◽  
Zu'bi M.F. Al-Zu'bi

PurposeThe purpose of this study is to investigate the structural changes needed for project-based organisations (PBOs) to synthesise their project operations and services following the servitisation strategy. It addresses the question of how PBOs should change their organisational structure fitting with service provision strategy.Design/methodology/approachThis study followed an exploratory research method using a single in-depth case with evidence collected from 51 project managers from five different industry sectors: construction, oil and gas, IT, logistics and health careFindingsCapitalising on organisational design theory, it has been found that successfully extending PBOs' outcomes into a system of both project output and extra services requires an adjustment of organisational structure that creates greater value for both companies and customers. This required adjustment has been divided into five main categories: (1) collaboration cross-project and customers; (2) flexible workflow, (3) decentralised decision-making, (4) wide span of control and (5) project governance. However, the findings indicate that success can only be ensured by particular mutually coordinated organisational designs with a suitable balance of products and servicesPractical implicationsThis study presents vital indicators to PBOs practitioners when deploying servitisation within their operational strategy by adjusting the organisation's design.Social implicationsServitisation could add both economic and social values for a diverse set of project stakeholders. However, the sustainability performance of servitisation in servitised project-based organisations is an outcome of reducing the discrepancy between project operation and service provision activities.Originality/valueThis study contributes to the body of knowledge and proposes a structural alteration process in PBOs to help align project operations and service provision activities. It explains how project-based organisations reconfigure their resources to provide services.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  

Purpose This paper aims to review the latest management developments across the globe and pinpoint practical implications from cutting-edge research and case studies. Design This briefing is prepared by an independent writer who adds their own impartial comments and places the articles in context. Findings The study takes empirical data from three case studies of projects that have faced setbacks to explore the impact of project manager signature strengths on team resilience and finds that four signature strengths, leadership, open-mindedness, persistence and hope, were present in project managers across all three case studies. Originality The briefing saves busy executives and researchers hours of reading time by selecting only the very best, most pertinent information and presenting it in a condensed and easy-to-digest format.


2018 ◽  
Vol 16 (4) ◽  
pp. 413-428
Author(s):  
Charles Amoatey ◽  
Doreen Danquah

Purpose The purpose of this paper is to analyse project risks in Ghana’s real estate construction industry in terms of likelihood of occurrence, severity of impact and controllability. Design/methodology/approach A quantitative research approach was used in this study to address the research objective. The study population consisted project managers, architects, surveyors and contractors from 17 members of the Ghana Real Estate Developers Association (GREDA) in Ghana. Random stratified sampling technique was used to select 97 participants from these firms. A structured questionnaire was used to collect primary data, whereas descriptive statistics were used to present findings. Findings All risks identified have some level of likelihood of occurrence, extent of severity of impact and controllability. Market risks, technical risks and environmental risks are more likely to occur. Market risks, technical risks and environmental risks had the highest severity of impact. Financial risks, market risks, managerial risks and technical risks are the most controllable. Among all risks, environmental risks are the direst because they have high likelihood of occurrence and severity of impact but very low controllability. Real estate construction firms (developers) are therefore expected to prioritize remedy of environmental risks. Research limitations/implications The study is based on self-reported perception of project parties on the likelihood, severity of impact and controllability of real estate project risk factors. Firms outside of GREDA were not included in the survey. Therefore, generalisation of these risk factors for the entire construction industry should be done with caution. Practical implications The research results show that Ghanaian real estate developers are aware of the existence of the risks which impact on the performance of the industry. To effectively and efficiently manage these risk factors, project parties must understand the likelihood of occurrence, severity of impact and controllability of the risk factors, as well as individual firm’s responsibilities and capabilities to manage them. Such knowledge helps project managers to prioritise risks in managing them in the face of scarce resources. From an academic research perspective, the paper contributes to a conceptual risk assessment framework for the real estate industry. Originality/value The paper’s main contributions relate to the introduction of real estate construction sector-specific factors to project risk management modelling.


2019 ◽  
Vol 12 (2) ◽  
pp. 242-266 ◽  
Author(s):  
Derek Walker ◽  
Beverley Lloyd-Walker

Purpose The purpose of this paper is to explore recent literature on the impact of changes in the workplace environment and projected trends through to the year 2030. This allows the authors to identify and discuss what key trends are changing the nature of project organising work. The authors aim to identify what knowledge and which skills, attributes and experiences will be most likely valued and needed in 2030. Design/methodology/approach This paper is essentially a reflective review and is explorative in nature. The authors focus on several recent reports published in the UK and Australia that discuss the way that the future workforce will adapt and prepare for radical changes in the workplace environment. The authors focus on project organising work and the changing workplace knowledge, skills, attributes and experience (KSAE) needs of those working in project teams in 2030 and beyond. The authors draw upon existing KSAE literature including findings from a study undertaken into the KSAEs of project alliance managers working in a highly collaborative form of project delivery. Findings The analysis suggests that there is good and bad news about project workers prospects in 2030. The good news is that for those working in non-routine roles their work will be more interesting and rewarding than is the case for today. The bad news is that for workers in routine work roles, they will be replaced by advanced digital technology. Research limitations/implications Few, if any, papers published in the project organising literature speculate about what this discipline may look like or what KSAEs will be valued and needed. Practical implications This paper opens up a debate about how project management/project organising work will be undertaken in future and what skills and expertise will be required. It also prompts project managers to think about how they will craft their careers in 2030 in response to expected work environment demands. This will have professional and learning implications. Social implications The issue of the future workplace environment is highly relevant to the social context. Originality/value This paper is about a projected future some 12 years onward from today. It bridges a gap in any future debate about how project organising jobs may change and how they will be delivered in the 2030s.