PROMETHEE-based ranking of project managers based on the five personality traits

Kybernetes ◽  
2019 ◽  
Vol 49 (4) ◽  
pp. 1083-1102
Author(s):  
Georgios N. Aretoulis ◽  
Jason Papathanasiou ◽  
Fani Antoniou

Purpose This paper aims to rank and identify the most efficient project managers (PMs) based on personality traits, using Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE) methodology. Design/methodology/approach The proposed methodology relies on the five personality traits. These were used as the selection criteria. A questionnaire survey among 82 experienced engineers was used to estimate the required weights per personality trait. A second two-part questionnaire survey aimed at recording the PMs profile and assess the performance of personality traits per PM. PMs with the most years of experience are selected to be ranked through Visual PROMETHEE. Findings The findings suggest that a competent PM is the one that scores low on the “Neuroticism” trait and high especially on the “Conscientiousness” trait. Research limitations/implications The research applied a psychometric test specifically designed for Greek people. Furthermore, the proposed methodology is based on the personality characteristics to rank the PMs and does not consider the technical skills. Furthermore, the type of project is not considered in the process of ranking PMs. Practical implications The findings could contribute in the selection of the best PM that maximizes the project team’s performance. Social implications Improved project team communication and collaboration leading to improved project performance through better communication and collaboration. This is an additional benefit for the society, especially in the delivery of public infrastructure projects. A lot of public infrastructure projects deviate largely as far as cost and schedule is concerned and this is an additional burden for public and society. Proper project management through efficient PMs would save people’s money and time. Originality/value Identification of the best PMbased on a combination of multicriteria decision-making and psychometric tests, which focus on personality traits.

2016 ◽  
Vol 8 (2) ◽  
pp. 113-132 ◽  
Author(s):  
Soroush Maghsoudi ◽  
Colin Duffield ◽  
David Wilson

Purpose Unlike manufacturing and research and developments, major infrastructure projects rarely emphasize or drive their objectives on the basis of innovation. This is in part because of a risk-averse culture, yet conceivably great benefits and opportunities are being lost because of this behavior. Design/methodology/approach The case for focusing on innovation in infrastructure projects is that the reasons driving innovation are not fully understood, and this impedes the effective implementation of lessons learned for the numerous innovative projects into practice more generally. The purpose of this study was to discover how innovation is produced and captured in major infrastructure projects in Australia and to understand how innovation may be replicated for future projects through refinement of design, project management, finance and procurement. Findings Engineering and project managers may find this paper helpful to better understand how innovation might happen in infrastructure projects and what different forms it can take. Originality/value The findings of this study demonstrate that people and culture drive consistent successful infrastructure outcomes more than simply the development of new products or processes.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Isaac Akomea-Frimpong ◽  
Xiaohua Jin ◽  
Robert Osei-Kyei ◽  
Augustine Senanu Kukah

PurposeThe contribution of the public–private partnership (PPP) model towards the achievement of the United Nation (UN)'s Sustainable Development Goals (SDGs) has been widely acknowledged. However, limited studies have shed light on the connection between PPPs and the achievement of these coveted goals in Ghana. In this study, the authors aimed at analysing and synthesising the existing literature on the use of PPP to achieve sustainability in infrastructure projects in the country.Design/methodology/approachA three-step approach was used to retrieve and review 60 selected articles aided by content analysis.FindingsThe analysis showed that all existing relevant publications on the application of the PPP model to attain UN’s SDGs in the country are organised around dominant themes, such as poverty alleviation, urban development, waste management and risk management. However, the review revealed little studies exist on pertinent issues relating to PPPs and sustainable development goals, such as climate action, critical resilience, sustainable finance and clean energy.Research limitations/implicationsAlthough the study is limited to 60 articles in Ghana, the results reveal pertinent gaps for further research studies to achieve sustainable infrastructural development in Ghana and other countries.Practical implicationsHolistically, the outcome of this study will serve as a guide to project managers to understand essential issues on attaining sustainability on public projects.Originality/valueThis article contributes to the literature and practice on the significance of PPP in mainstreaming UN's SDGs in public infrastructure projects.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
E.M.A.C. Ekanayake ◽  
Geoffrey Qiping Shen ◽  
Mohan Kumaraswamy ◽  
Emmanuel Kingsford Owusu

PurposeIndustrialized construction (IC) has been recognized as a game-changing approach in Hong Kong (HK). However, the increasing risks of disruptions in IC supply chains (SCs) raise SC vulnerability levels, prompting attention to developing supply chain resilience (SCR). Since SCR is only attainable through overcoming critical supply chain vulnerabilities (CSCV) with enhanced SC capabilities, this study first aimed to determine the most CSCV of ICSCs by addressing this current research gap and practical need.Design/methodology/approachDrawing on SCV factors identified from a precursor literature review, an empirical study of IC in HK was conducted using a questionnaire survey and interviews with industry experts. Focussed significance analysis of the data collected through questionnaire survey enabled the selection of 26 CSCV as appropriate to IC. Next, factor analysis was conducted, enabling the grouping of these CSCV under five components. The results were verified and reinforced by interview findings.FindingsThe results revealed 26 CSCV pertinent to resilient ICSCs in HK with five underlying components: economic, technological, procedural, organizational and production-based vulnerabilities. Loss of skilled labour is the most critical vulnerability, whereas organizational SCV is the most critical component identified.Originality/valueFindings of this study would motivate IC project professionals to appreciate and address the CSCV in the context of five components and thereby develop adequate specific capabilities to successfully withstand these CSCV. This should trigger future studies to map CSCV with appropriate capabilities in developing an envisaged powerful assessment model for evaluating the SCR in IC in HK.


2020 ◽  
Vol 10 (3) ◽  
pp. 453-468
Author(s):  
Florence Y.Y. Ling ◽  
Zhe Zhang ◽  
Wei Ting Wong

PurposeThis research investigates the dominant personality traits of construction project managers (PMs) and how their personality influences their management styles.Design/methodology/approachAn industry-wide survey with 70 PMs was conducted in Singapore. The survey data were subjected to inferential statistical tests. In-depth interviews were conducted with four subject matter experts.FindingsMajority of the sample PMs are male with age, education level and experience well spread. The dominant personality traits of PMs are found to be: high in Extraversion, Agreeableness, Conscientiousness and Openness and low in Neuroticism. PMs adopt “team leadership” style in which they place high emphasis on both the work that they need to complete and the people they lead. Their Agreeableness and Conscientiousness may improve over time.Research limitations/implicationsThe correlations and regressions cannot prove causality.Practical implicationsIt is discovered that PMs who have high conscientiousness and high openness personalities are more likely to be leaders who are concerned for both the people that they lead and production outcomes. The implication is that employers may wish to conduct personality tests at the time of hiring to ensure good job match.Originality/valueThis study is novel because it integrated two areas of knowledge – personality traits and management style. The regression analysis discovered that Openness and Conscientiousness traits may be used to predict PMs' management styles. This suggests that if personality tests are administered at hiring stage, the outcomes may be used to match potential hires to the jobs that they are being considered for.


2019 ◽  
Vol 13 (3) ◽  
pp. 616-647
Author(s):  
Haoran Li ◽  
Zhenzhi Zhao ◽  
Ralf Müller ◽  
Jingting Shao

Purpose Followership is the free will recognition of leadership in the commitment toward realization of the collectively adopted organization vision and culture. The purpose of this paper is to identify the relationship between project managers’ leadership and their followership. Most project managers are both leaders and followers at the same time, but research typically investigates only their leadership. This ignores followership as an important aspect in understanding and predicting behavior, and further in the selection of project managers. Design/methodology/approach The method used for this paper is the explanatory in nature and a deductive approach, within which the above research hypothesis is tested through quantitative techniques. Data are collected through a nation-wide survey in China. Data analysis was done through factor analysis, canonical correlation analysis and multiple regression analysis. Findings The results show that transformational leadership is positively correlated with transformational followership and transactional followership, and that transactional leadership is negatively correlated with transactional followership. Research limitations/implications The paper supports a deeper investigation into leadership and followership theories. A model for both leadership and followership is developed. The findings from this paper will guide organizations to choose the project managers. Originality/value The originality lies in the new way to examine the relationship between leadership and followership. It is the first study on the relationship of project managers. Its value is new insights, which introduced a new perspective to understand leadership and followership.


Subject Economic update. Significance Landlocked and with meagre infrastructure relative to its large size, Chad depends heavily on oil for export earnings. Under 18s make up more than half of the country’s population of 15.5 million, and poverty levels are high. President Idriss Deby has been in power for nearly 29 years and will have noted with some concern the sustained protest campaign in neighbouring Sudan which led to the ouster of its long-standing president earlier this year. Impacts Allegations or revelations about corruption could prompt the government to initiate new anti-graft measures, albeit likely symbolic. Public infrastructure projects will be hamstrung by financing shortages. Oil output is unlikely to grow significantly.


2020 ◽  
Vol 45 (4) ◽  
pp. 373-386
Author(s):  
Solomon Olusola Babatunde ◽  
Damilola Ekundayo ◽  
Chika Udeaja ◽  
Uthman Olawande Abubakar

Purpose Although several studies have been undertaken on sustainability within infrastructure projects, limited attention has paid to the drivers for, and the barriers to, the incorporation of sustainability in public–private partnership (PPP) infrastructure projects through empirical study, particularly in Nigeria. Therefore, this study aims to identify and examine the drivers that promote sustainability in Nigerian PPP infrastructure projects and assess the barriers to the full integration of sustainability practices into current Nigerian PPP infrastructure projects. Design/methodology/approach Primary data were collected using a questionnaire survey. The questionnaire survey was targeted on four different stakeholders’ organizations. They were public sector authorities, concessionaires, consultants and banks already undertaking PPP infrastructure projects in Lagos State, Nigeria. The obtained data were analyzed using frequency, percentage, mean score, standard deviation and the Kruskal–Wallis test. Findings The study identified 17 drivers that promote the incorporation of sustainability in PPP infrastructure projects. The analysis of the total ranking of the drivers in Nigeria revealed the top five ranked drivers to be: consideration of long-term performance; contractual arrangements; incentives for new market penetration; award criteria; and selection criteria, respectively. The study further identified 11 barriers to sustainability integration in PPP infrastructure projects and the top five ranked barriers in Nigeria are as follows: comprehensive sustainability procurement guidelines; no enabling environment; education needs; uncertain economic environment; and a lack of clear government policy, respectively. The results of the Kruskal–Wallis test conducted on both the 17 identified drivers for, and the 11 barriers to, the incorporation of sustainability in Nigerian PPP infrastructure projects revealed that there is no significant statistical difference in both rankings from the perceptions of the aforementioned four different respondents’ groups. Research limitations/implications The study provides empirical insights on the knowledge and awareness of drivers which could lead to a greater uptake in sustainability measures by the stakeholders in Nigerian PPP projects; it also identified barriers to overcome. Originality/value The importance of the incorporation of sustainability in public procurement cannot be over-emphasized. It is anticipated that the study will be of great value to PPP stakeholders involved in sustainability decision-making processes when delivering sustainable PPP projects.


2017 ◽  
Vol 24 (6) ◽  
pp. 1690-1708 ◽  
Author(s):  
Solomon Olusola Babatunde ◽  
Srinath Perera

Purpose The presence of previous awarded public-private partnership (PPP) infrastructure projects that significantly delays reaching financial close constrain the likely success of new PPP projects. However, effort at investigating financial close delays of PPP projects through empirical studies by the research community received scant attention. Thus, the purpose of this paper is to identify and assess the factors causing delays in PPP projects from reaching financial close in developing countries. Design/methodology/approach The study adopted literature review and questionnaire survey. In order to capture a broad perception, a questionnaire survey was adopted, which was administered to three different primary stakeholder categories comprised public sector authorities (i.e. ministries, department, and agencies), concessionaires, and lenders/banks already involved in PPP infrastructure projects implementation in Nigeria. The data obtained were analysed using mean score, Kruskal-Wallis test, and factor analysis. Findings The study revealed the mean score ranking of 39 identified causes of financial close delays in PPP projects, and the mean score values for all the identified 39 causes of financial close delays are very high. The study, through factor analysis, categorised the 39 identified causes of financial close delays into eight principal factors. The factors are: decreased bankability of PPP projects; unstable economic policy; weak financial, technical, and managerial capabilities of the concessionaires; weak public institutions; lack of creditworthiness of both the project sponsors and active partner; unfavourable economy of the host country; weak legal and unfavourable environment; and high contingent liabilities, respectively. Practical implications The identification and evaluation of the factors delaying PPP projects development from reaching financial close in a reasonable time manner would be useful for PPP primary stakeholders to develop strategies to safeguard the present and future PPP projects implementation in developing countries. Originality/value The study findings would be useful for both policymakers considering PPP projects and private investors seeking to finance PPP projects in developing countries. This study is crucial as not many empirical studies have been conducted in developing countries.


2017 ◽  
Vol 15 (2) ◽  
pp. 166-180 ◽  
Author(s):  
De-Graft Owusu-Manu ◽  
David John Edwards ◽  
E.K. Kutin-Mensah ◽  
Angela Kilby ◽  
Erika Parn ◽  
...  

Purpose Investment in power and electricity generation for replacing aging infrastructure with new represents a major challenge for developing countries. This paper therefore aims to examine infrastructure projects’ characteristics and how socio-political and economic investment environments interplay to influence the degree of private sector participation (PPP) in infrastructure delivery in Ghana. Design/methodology/approach Using World Bank Public-private infrastructure advisory facility (PPIAF) and private participation in infrastructure (PPI) project database data from 1994 to 2013, binary logistic regression was used to: determine the probability of a higher or lower degree of PPP; and examine the significance of factors that are determinants of private investments. Findings The findings reveal that the private sector is more likely to invest in a higher degree of PPP infrastructure projects through greenfield and concession vehicles as opposed to management and leasing contracts. From the extant literature, drivers of PPP included infrastructure project characteristics and the social–economic–political health of the host country. However, the significance, direction and magnitude of these drivers vary. Originality/value This paper identifies investment drivers to PPP advisors and project managers and seeks to engender discussion among government policymakers responsible for promoting and managing PPP projects. Direction for future work seeks to explore competitive routes to infrastructure debt and equity finance options that finance energy projects.


2017 ◽  
Vol 15 (4) ◽  
pp. 552-570 ◽  
Author(s):  
Solomon Olusola Babatunde ◽  
Onaopepo Adeniyi ◽  
Oluwaseyi Alabi Awodele

Purpose The land is a critical resource for public-private partnerships (PPPs) in infrastructure development. However, acquisition of land for PPP infrastructure projects implementation increasingly becomes problematic in developing countries. Yet, effort at investigating the factors causing a delay in land acquisition for PPP infrastructure projects through an empirical method in developing countries received scant attention. Therefore, the purpose of this study is to identify and critically assess the factors predisposing PPP projects implementation to land acquisition delay in Nigeria using an empirical approach. Design/methodology/approach The study adopted literature review and questionnaire survey. For instance, literature review was used to identify the factors causing delay in land acquisition for PPP projects in developing countries, which was used to design the questionnaire survey culminating in data analysis. To capture a broad perception, the questionnaires were administered to three different primary stakeholder groups comprised public sector authorities (i.e. ministries, department, agencies), concessionaires and lenders/banks involved in PPP projects implementation in Nigeria. Data collected were analysed using mean score, Kruskal–Wallis test and factor analysis. Findings The study revealed the mean score ranking of 22 identified factors causing a delay in land acquisition for PPP projects in Nigeria. The result of factor analysis grouped the 22 identified factors into 4 principal factors, namely, resettlement issues with political interference; non-availability of land with a higher cost of land transactions; weak planning institutions; and rehabilitation issues with extensive legal delays. Practical implications These study findings have implications for both policymakers considering PPP projects and private investors seeking to finance a PPP project in developing countries. Also, the study findings would be useful for the governments in Nigeria and other developing countries to formulate clear policies framework that facilitates the smooth acquisition of land for PPP projects. Originality/value The study will be beneficial to the potential local and foreign private investors and governments by broadening their awareness on impediments in land acquisition for PPP projects in Nigeria and developing countries at large. These study findings are crucial, as not many empirical studies have been conducted in Nigeria and many other developing countries.