Simulation of CHP System Based on Micro Gas Turbine With Inverted Brayton Cycle
In the present work mathematical modeling of a CHP system based on Micro Gas Turbine (MGT) with Inverted Brayton Cycle (IBC) (also known as subatmospheric) is provided. Nominal electric power of the facility is 10 kW. Engineering calculation based modeling is conducted to determine optimal parameters of each component, electrical and total efficiency at full load. Further dynamic modeling is provided for the components with determined optimal parameters. With chosen optimal parameters of the scheme components and coolant temperature the dynamic (time-dependent) modeling of disturbance from the nominal state with no control, ramp down and ramp up of power load (a) and heat load (b) with the activated control system was provided. An iteration based approach of MGT modeling is suggested. The difficulties in the system control under reduction of heat consumption are revealed and challenged. The final objectives of the research are comparison of the IBC with the conventional Brayton cycle for MGT application from the electric efficiency, dynamic behavior and controllability points of view, creation of the control system for such a facility.