Study on the coupling system of high prestress cable truss and surrounding rock on a coal roadway

2010 ◽  
pp. 643-646
Author(s):  
Fulian He ◽  
Dongping Ying ◽  
Hong Yan ◽  
Hongqiang Han ◽  
Kaiqing Li
2010 ◽  
pp. 643-646
Author(s):  
Fulian He ◽  
Dongping Ying ◽  
Hong Yan ◽  
Hongqiang Han ◽  
Kaiqing Li

2012 ◽  
Vol 524-527 ◽  
pp. 360-363
Author(s):  
Shou Yi Dong ◽  
Qi Tao Duan ◽  
Fu Lian He ◽  
Qi Li ◽  
Hong Jun Jiang

The coal side deformation and sliding can not be effectively controlled by use of the traditional bolt or cable support in the high stress crushed surrounding rock and large section roadway. For solving this problem, the new prestressed truss support technology is put forward, and its supporting principles of roof and two walls are stated. The mechanical model of cable-channel steel truss is established, and then the tensile strength of the cable and the maximum deflection of the channel steel are derived. By way of field investigation, mechanics theory analysis and actual production condition, the scheme is defined and applied in the replacement roadway. Measurement results of surrounding rock behavior show that the coal side displacement is no more than 254mm and the roof convergence is less than 172mm. Apparent economic and technical profits have been achieved.


2021 ◽  
Vol 13 (8) ◽  
pp. 4412
Author(s):  
Houqiang Yang ◽  
Nong Zhang ◽  
Changliang Han ◽  
Changlun Sun ◽  
Guanghui Song ◽  
...  

High-efficiency maintenance and control of the deep coal roadway surrounding rock stability is a reliable guarantee for sustainable development of a coal mine. However, it is difficult to control the stability of a roadway that locates near a roadway with large deformation. With return air roadway 21201 (RAR 21201) in Hulusu coal mine as the research background, in situ investigation, theoretical analysis, numerical simulation, and engineering practice were carried out to study pressure relief effect on the surrounding rock after the severe deformation of the roadway. Besides, the feasibility of excavating a new roadway near this damaged one by means of pressure relief effect is also discussed. Results showed that after the strong mining roadway suffered huge loose deformation, the space inside shrank so violently that surrounding rock released high stress to a large extent, which formed certain pressure relief effect on the rock. Through excavating a new roadway near this deformed one, the new roadway could obtain a relative low stress environment with the help of the pressure relief effect, which is beneficial for maintenance and control of itself. Equal row spacing double-bearing ring support technology is proposed and carried out. Engineering practice indicates that the new excavated roadway escaped from possible separation fracture in the roof anchoring range, and the surrounding rock deformation of the new roadway is well controlled, which verifies the pressure relief effect mentioned. This paper provides a reference for scientific mining under the condition of deep buried and high stress mining in western China.


Geofluids ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Hongjun Guo ◽  
Ming Ji ◽  
Dapeng Liu ◽  
Mengxi Liu ◽  
Gaofeng Li ◽  
...  

In order to further explore the deformation and failure essence of the deep coal body, based on the characteristics of surrounding rock stress adjustment before and after solid coal roadway excavation, an experiment of unloading confining pressure and loading axial pressure of the coal body was designed and conducted in this study. Based on test results, the failure mechanics and energy characteristics of the coal body were analyzed through experiments. Rapid unloading is considered a key factor contributing to lateral deformation and expansion failure, which exacerbates the deterioration of coal body and reduces the deformation energy storage capacity of coal. On the other hand, the larger loading rate tends to shorten the accumulation time of microcracks and cause damage to the coal body, resulting in strengthening the coal body and improving energy storage. Under the circumstance that the coal body is destroyed, the conversion rates of the internal deformation energy and dissipated energy are more significantly affected by unloading rate. The increasing unloading rate and rapid decreases in the conversion rate of deformation energy make the coal body more vulnerable to damage. Under the same stress conditions, the excavation unloading is more likely to deform, destroy, or even throw the coal than the experiment unloading. In order to reduce or avoid the occurrence of deep roadway excavation accidents, the understanding of the excavation unloading including possible influencing factors and the monitoring of the surrounding rock stress and energy during the excavation disturbance should be strengthened. It can be used as the basis for studying the mechanism of deformation and failure of coal and rock and dynamic disasters in deep mines, as well as the prediction, early warning, prevention, and control of related dynamic disasters.


2021 ◽  
Vol 2021 ◽  
pp. 1-12
Author(s):  
Yajuan Wang ◽  
Dongji Lei ◽  
Yuanyuan Zheng ◽  
Tao Ma

In order to solve the problems such as coal burst and abnormal gas overrun caused by the fracture of surrounding rock in the process of mining in the coal roadway, the ESG microseismic monitoring system is built on the driving face of 8005 transportation roadway of Wuyang Coal Mine to carry out a real-time, continuous, and omnidirectional dynamic state monitoring. In this way, the characteristics of time-frequency evolution and energy distribution of the acquired signals are systematically analyzed, and the location of the roadway microseismic events is studied. The results show the following: (1) influenced by mining activities, the localized microseismic events are mostly distributed in front and on both sides of the working face. Due to mining activities and geological changes, the equilibrium of original stress in coal and rock mass is broken. The stress thus is released accompanied by fracture before reaching a new equilibrium. (2) By comparing the coal and rock fracture signals with the interference signals, it is found that the fracture signals have short duration and large amplitude with obvious abrupt change characteristics. The interference signals have long duration and relatively small amplitude with less obvious change. (3) Fourier transform analysis shows that the main frequency of coal rock fracture signals is 100–200 Hz with large total energy concentrated in the first frequency band, while that of interference signals is mostly less than 100 Hz with small total energy. The research results can effectively identify the coal and rock dynamic disasters, provide technical support for the prediction and early warning of hidden danger, and guide the safe and efficient production.


2021 ◽  
Vol 257 ◽  
pp. 03024
Author(s):  
Zhonghua Wang

In order to explore the distribution characteristics of the overlying rock stress field in the floor roadway at different locations, FLAC3D software was used to simulate and analyze the surrounding rock directly above the floor roadway and the surrounding rock within 15m on both sides of the floor roadway when the distance between the floor roadway and the coal roadway and the horizontal distance were changed. The stress field distribution characteristics are obtained, and the stress field distribution characteristics of different areas directly above and on both sides of the floor roadway are obtained, which provides a theoretical basis for the location selection and support of the floor roadway.


2014 ◽  
Vol 568-570 ◽  
pp. 1684-1689
Author(s):  
Zhong Han Chen

To solve the problem of underground tunneling face from the empty top, using FLAC3D analysis software, surrounding rock stability for coal roadway 2-1121 of Ganhe Coal Mine are analyzed in numerical calculation. (1) During the tunneling, distance drivage face head-on 0.5-1m at the roof of roadway deformation and destruction features are more obvious, the two sides of roadway are even more significant. (2) Ganhe Coal Mine roof deformation has been established with different empty the experience formula of the zenith distance, obtained Ganhe underground tunneling face reasonable empty zenith distance is 3.5m. (3) Temporary support can obviously reduce roof deformation, reduce thickness of plastic zone of the top, to improve the stability of surrounding rock tunneling faces.


2013 ◽  
Vol 353-356 ◽  
pp. 252-257
Author(s):  
Ren Liang Shan ◽  
Xiang Song Kong ◽  
Ji Jun Zhou ◽  
Wen Feng Zhao ◽  
Yu Tao ◽  
...  

Scientific supporting design is of great significance to ensure coal roadway stability. The three-step supporting design method is put forward for coal roadway support: The first step is preliminary design, determine the range of each supporting parameter according to the theoretical calculation and supporting experiences; the second step is numerical simulation calculation, choose the reasonable one through the comparison of schemes; the third step is field monitoring, verify the scheme applicability. After applying the three-step supporting design method to study 3# coal seam roadway in Guandi mine, the optimal supporting scheme is obtained, and good results of underground roadway are achieved, which ensure the stability of roadway surrounding rock. Meanwhile, some rules are summarized which provide references for future roadway supporting design.


2012 ◽  
Vol 214 ◽  
pp. 287-291 ◽  
Author(s):  
Hong Yan ◽  
Teng Fei Xu ◽  
Jun Wang

The coal roadways with water spraying usually have large surrounding rock deformation or roof abscission layer, especially to the roadways with compound rock strata roof, which could lead to sudden roof caving accidents, so it is imperative to research the roof characters and the corresponding controlling methods. In this paper, we firstly analyze the main reasons and characters of the roof deformation or its stability failure with bolt and cable supporting, and then the mechanical properties of the roof are tested in the lab, which could afford detailed datum to the further analysis. Based on the comprehensive researching results of this complex roof, a set of measuring device for the value of water spraying in single roof hole is developed and then applied to a typical coal roadway. Finally, some effective controlling methods are put forward to prevent from the large deformation of the roadways.