scholarly journals Creation of a network model on the basis of a universal sequence of construction works

Author(s):  
Irina V. Karakozova ◽  
Alexander S. Pavlov

Introduction. Building information modeling is the main direction of development of automated design and control systems. An important component of information modeling is the transfer of data into construction management systems. The most complicated issue is the problem of creating the correct graph topology relevant to the process sequence and construction management experience. The development of automated progress schedule compilation system based on the use of a universal sequence developed earlier is examined. Materials and methods. As a result of the analysis of the progress schedule compilation process, the topology creation algorithm is divided into several stages. At the first stage, a text description of the information model is given, which is then converted into a list of building or structure elements. The list of elements should be transformed into the work item list and then supplemented with work items not reflected in the list of elements. This is a separate complex task, which is not examined in this study, and is the direction of further research by the authors. At the next stage, the work items in the list are assigned codes that define the location of the scope of works in time and space. Results. An algorithm for converting the work item list into a coherent work schedule, the topology of which takes into account the spatial location of the work area and the sequence of interrelated processes over time, has been developed. The sequence of works is determined by a preliminarily designed universal list. The list of requirements for the information produced by BIM models is developed. Splitting the algorithm into stages allows for manual correction of the work item list and the properties of work items, if necessary. Conclusions. The developed method allows for automation of the processes of creating construction plans based on the list of building elements and universal work sequence. At any implementation stage, the work item list may be interactively changed and supplemented. In the future, it is necessary to form a set of parameters for structural elements that will allow automating the choice of technological processes.

2020 ◽  
Vol 10 (15) ◽  
pp. 5169
Author(s):  
Juan Jin ◽  
Kyung-Eun Hwang ◽  
Inhan Kim

The purpose of this study is to verify the effectiveness of the constructivism education theory in building information modeling (BIM)/integrated project delivery (IPD) collaboration education by determining education methods that are most relevant to collaboration in the interaction process. We propose a BIM training model that enhances students’ satisfaction in class and collaboration. We aim to identify interrelationships between BIM collaboration education and constructivism theories, examining constructivism methods in BIM/IPD classes to discern which are the most suitable for improving and enhancing collaboration and the proposed education model. A model of the hypothesis “Constructivism Collaboration Process (CCP)” for BIM/IPD collaboration education was derived and a curriculum was created. The hypothesis model was tested by dividing into an experimental group and control group, and finally, prior and post-satisfaction and collaboration level assessments were performed in the BIM and IPD classes. After evaluating and analyzing the improvement in collaboration level and satisfaction, the results were derived for the hypothetical model of the “Constructivism Collaboration Process (CCP)” and the facts that can have a positive impact on BIM/IPD education.


2014 ◽  
Vol 522-524 ◽  
pp. 806-810 ◽  
Author(s):  
Jae Woo Park ◽  
Gi Wook Cha ◽  
Won Hwa Hong ◽  
Hyun Cheol Seo

Recently, BIM (Building Information Modeling) became mandatory in Korea, and BIM started to be implemented in construction area. It is a design tool for maximizing the efficiency of design, construction, and maintenance throughout the entire lifecycle, but there are not many studies about the demolition wastes (DW) in the demolition stage. This study gathered basic data concerning the development of a database of DW disposed in the demolition stage using BIM-based building material database. For this, a BIM software, ARCHICAD, and construction material categories of the item list system of the PPS (Public Procurement Service) were analyzed to select major building materials. Based on the analysis, the disposal routes were analyzed considering the characteristics of DW. The database of DW was developed by examining the disposal routes of 52 major construction materials selected according to the characteristics of each material during demolition and selecting 7 major DW.


2016 ◽  
Vol 7 (3) ◽  
pp. 114-125 ◽  
Author(s):  
Romas Rasiulis ◽  
Leonas Ustinovichius ◽  
Darius Migilinskas ◽  
Jovita Cepurnaite ◽  
Arvydas Virbickas

Modern constructions, either private houses or public buildings, nowadays must be built meeting all the requirements of the European Union [EU] standards and must be highly energy efficient. Still, there are a lot of old inefficient buildings with high energy costs that require renovation. These buildings can be renovated applying a passive house model that helps to minimize buildings’ heating and cooling energy expenses. Moreover, the decisions made in the stages of early design and preconstruction are essential for the sustainability in a building facility. It is possible to perform various analyses with Building Information Modeling (BIM) in order to have an optimized sustainable building design. BIM system can be used to evaluate and control the costs (e.g. renovation, efficiency) as well as to monitor the conditions during the life-cycle of the building.


2018 ◽  
Vol 2018 ◽  
pp. 1-13 ◽  
Author(s):  
Tsenguun Ganbat ◽  
Heap-Yih Chong ◽  
Pin-Chao Liao ◽  
You-Di Wu

International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM) emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 peer-reviewed journal articles for the years 2007–2017. Thus five steps of bibliometric analysis were conducted based on the proposed frameworks of BIM risk management in international construction (BIM-RM-INTL). The results show that the popularization of BIM not only attracts all stakeholders’ interests but also brings some risks. For example, financial factors are hard to detect and control through BIM, information loss during transmission stands out, and BIM has no unified standards and regulations for international construction. The research has mapped existing research results and their relationships for future risk management in BIM-enabled international construction.


2017 ◽  
Vol 23 (8) ◽  
pp. 1100-1108 ◽  
Author(s):  
Daniel Luiz de Mattos NASCIMENTO ◽  
Elisa Dominguez SOTELINO ◽  
Thiago Pires Santoloni LARA ◽  
Rodrigo Goyannes Gusmão CAIADO ◽  
Paulo IVSON

One of the main problems the construction industry faces is the high cost and slow execution time due to inadequate planning, which results in poor use of human resources. A common solution for reducing time and costs is the adoption of prefabricated components (prefabs). This paper proposes a novel methodology for interdisciplinary man­agement of construction projects by integrating Building Information Modeling (BIM) and Lean Thinking to improve the production planning and control of pipe-rack modules in an industrial facility. The article first presents a literature review to assess the key synergies between BIM and Lean Thinking. These led to the development of a new integrated work methodology named Digital Obeya Room. This model focuses on the required workflows, the analysis of collected data, and the visual management of construction planning and control. A real-world empirical study in the Oil and Gas industry evaluated how the newly devised practices could improve prefabrication and preassembly planning. The pro­posed methodology was capable of reducing the welding-time in 8.7% related on global prefabrication average in con­struction projects from Fails Management Institute (FMI) prefabrication report survey 2017.


2021 ◽  
Vol 4 (1) ◽  
pp. 50-64
Author(s):  
Ja’far A. Aldiabat Al-Btoosh

Variation order (VO) is one of the main issues faced by the construction industry in Jordan. Many researchers had investigated on the causes of VO and proposed procedures to minimize and control this issue; however, the VO is affecting the construction industry badly even at moment. Building Information Modeling (BIM) is a powerful management system that can make a significant difference in the project costs. However, BIM has not been examined as a tool to minimize the VO in Jordan. The main target of this study is to utilize BIM applications in reducing the effect of VO on the governmental projects in Jordan. In order to achieve this target, the researcher has designed a questionnaire to gather data related to VO causes and the BIM capability to solve this problem. The data collected from the questionnaires were analyzed statistically. The result from the analysis found that the consultant initiated the highest VO of 50% followed by the clients and the contractors of 20% and 10% unforeseen variation respectively. Moreover, it is found that BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection and BIM Quantity Take-off and Cost Estimation were significantly capable of minimizing VO. The results show positive relationship with the application of BIM in minimizing VO in the construction industry in Jordan. © 2018. JASET, International Scholars and Researchers Association


2022 ◽  
Vol 27 ◽  
pp. 48-69
Author(s):  
Sahar Y. Ghanem

As the industry transitions towards incorporating BIM in construction projects, adequately qualified students and specialists are essential to this transition. It became apparent that construction management programs required integrating Building Information Modeling (BIM) into the curriculum. By bringing Virtual Reality (VR) technology to BIM, VR-BIM would transform the architectural, engineering, and construction (AEC) industry, and three-dimensional (3D) immersive learning can be a valuable platform to enhance students' ability to recognize a variety of building principles. The study carries out a methodology for implementing the VR-BIM in the construction management undergraduate program. Based on the previous literature review, in-depth analysis of the program, and accreditation requirements, VR-BIM will be implemented throughout the curriculum by combining stand-alone class and integration in the existing courses method. The challenges that may face the program planning to implement VR-BIM are discussed, and few solutions are proposed. The lab classroom layout appropriate for the applications is designed to be adjusted for several layouts to accommodate all learning styles and objectives. A comparison between different Head-Mounted Display (HMD) headsets is carried out to choose the appropriate equipment for the lab.


2020 ◽  
Vol 10 (3) ◽  
pp. 821 ◽  
Author(s):  
Schimanski ◽  
Marcher ◽  
Monizza ◽  
Matt

Many researchers have stated that lean and building information modeling (BIM) have positive synergies. This integrative literature review aims at exploring this body of knowledge within the scope of combinations of BIM and the Last Planner® System, as an important Lean construction method, in the phase of construction execution. The research motivation is to find out whether a comprehensive understanding of how to take advantage of these synergies exists. Eventually, the question arises of how to condense this understanding—if existing—into a robust conceptual model for integration. As a theoretical backbone, we will make use of the original BIM-Lean interaction matrix. The hypothesis is that new BIM functionalities have been evolved since the first formulation of this interaction matrix almost 10 years ago. These new BIM functionalities cause new interactions with existing lean principles. We will focus on interactions that refer directly or indirectly to production planning and control and use them to find the most relevant literature for this review. Within the content analysis, as a part of this review, we focus on existing conceptual models and frameworks for integration of BIM and the Last Planner® System and reveal their shortcomings. Eventually, we will propose a new conceptual model.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Eymen Çağatay Bilge ◽  
Hakan Yaman

PurposeThis study aims to identify the trends that have changed in the field of construction management over the last 20 years.Design/methodology/approachIn this study, 3,335 journal articles published in the years 2000–2020 were collected from the Web of Science database in construction management. The authors applied bibliometric analysis first and then detected topics with the latent Dirichlet allocation (LDA) topic detection method.FindingsIn this context, 20 clusters from cluster analysis were found and the topics were extracted in clusters with the LDA topic detection method. The results show “building information modeling” and “information management” are the most studied subjects, even though they have emerged in the last 15 years “building information modeling,” “information management,” “scheduling and cost optimization,” “lean construction,” “agile approach” and “megaprojects” are the trend topics in the construction management literature.Research limitations/implicationsThis study uses bibliometric analysis. The authors accept that the co-citation and co-authorship relationship in the data is ethical. They accept that honorary authorship, self-citation or honorary citation do not change the pattern of the construction management research domain.Originality/valueThere has been no study conducted in the last 20 years to examine research trends in construction management. Although bibliometric analysis, systematic literature reviews and text mining methods are used separately as a methodology for extracting research trends, no study has used enhanced bibliometric analysis and the LDA topic detection text mining method.