scholarly journals Construction Project delays in Lusaka, Zambia: Causes and Effects

2014 ◽  
Vol 6 (11) ◽  
pp. 848-857 ◽  
Author(s):  
Aigbavboa C.O. ◽  
Mukuka M.J. .

This paper assesses the construction professionals’ perception on the major causes of construction project delays and there consequential effects of on the Lusaka – Zambia, construction industry. This is due to the fact that the Zambia construction industry is a major key sector in the development and economic growth of Zambia. Despite this belief, the industry has not escaped the challenges facing other countries worldwide in terms of construction projects performance with regards to the delivery of projects on time as stipulated in the contracts. Data used in this study were derived from both primary and secondary sources. The secondary data was collected through a detailed review of related literature. The primary data was collected through a structured questionnaire survey, distributed to construction professionals, who include: architects, quantity surveyors, builders, civil engineers, land surveyors and project managers. Out of the 50 questionnaires sent out, 32 were received back representing 64% response rate. The primary data from the questionnaires was analyzed using descriptive statistics procedures. Hence, findings from the study revealed that delay in progress payments, difficulties in financing projects by the contractor, delay in approving major changes in the scope of work amongst others, were the major causes of construction delays. The study also revealed that extension of project time and cost over runs are the two major effects of construction project delays in Lusaka, Zambia. The study contributes to the body of knowledge on the subject of the causes and the effects of delay construction project delays in Lusaka, Zambia.

Author(s):  
Mulenga Mukuka ◽  
Clinton Aigbavboa ◽  
Wellington Thwala

There are many factors that contribute to the causes of schedule overruns in construction projects. This ranges from factors inherent in the technology and its management, to those resulting from the physical, social, and financial environment. Schedule overruns can give rise to disruption of work and loss of productivity, late completion of project, increased time related costs and third party claims and abandonment or termination of contract. Schedule overruns are costly and often result in disputes and claims. Hence, the need to identify mitigation measures of construction projects overruns that will bring about the timely delivery of construction projects. This paper assesses the measures to mitigate against construction projects schedule overruns in the Gauteng Province construction industry in South African. The data used in this paper were derived from both primary and secondary sources. The primary data were collected through a questionnaire distributed to construction professionals in the study area. Data received from the questionnaires were analyzed using descriptive statistics procedures. Findings revealed that proper project planning and scheduling, effective strategic planning, site management and supervision, amongst others, were the major mitigation measures of construction projects schedule overruns in the Gauteng Province of South Africa. This study contributes to the body of knowledge on the subject of the measures of mitigating against construction project schedule overruns in the Gauteng Province construction industry.


Author(s):  
Murendeni Liphadzi ◽  
Clinton Aigbavboa

The construction industry is one of the major industries in South Africa. Like any other industry, strong leadership is vital for its growth. Moreover in order to stay competitive, South African construction firms must find a way to train their project and construction managers to become competent leaders in their specific disciplines. It is to this end, that the study presents findings on how leaders can be developed in the South African construction industry. The data used in this research were derived from both primary and secondary sources. The secondary data was collected via a detailed review of related literature. The primary data was collected through a structured questionnaire aimed at 150 projects and construction managers in the South African construction industry. From the 150 distributed questions, only 110 questionnaires were received and subsequently data based on the received questionnaire which was analyzed using descriptive statistics. Findings revealed that, education and qualification can help develop leaders in the South African construction industry. This was followed by leadership training courses, taking responsibility, new challenges, and internal motivation, professional and personal development. The study explores leadership and leadership development in the South African construction industry. The study presents a robust background about the construction industry and the importance of leadership.


Author(s):  
Saurav Dixit

Abstract A construction project is like a living entity and requires the interconnection and coordination of several stakeholders and many of them have their objectives, which sometimes create a conflict of interest between the teams and within the teams. The success of any project is repeatable, and a set of attributes for the success of a construction project can be identified, requiring discipline and hard work. The construction sector is the engine of growth for a nation and supplies services and goods to other industries. The objective of the study is to analyse the enabling factors affecting the performance construction projects in Architecture Engineering and Construction industry. The methodology chosen for the study is to collect primary data from the Indian construction industry using structured questionnaire surveys. The collected data are analysed using reliability and factor analyses. The findings of the study provide the value of reliability, that is, Cronbach's alpha value of (0.86) of the data collected using a questionnaire survey. Furthermore, exploratory factor analysis produced five main significant factors based on covariance between the attributes and grouped into factors such as site management and coordination, leadership and financial management, planning, commitment, and coordination having a variance of 17.65, 11.8, 9.1, 8.5, and 7.5%, respectively. This article is the extended version of the paper accepted and presented at CCC2019.


2015 ◽  
Vol 20 (3) ◽  
pp. 235-251 ◽  
Author(s):  
Olugbenga Jide Olaniran

Purpose – This paper aims to present the outcome of a study conducted on the impact that cost-based contractor selection (CBCS) might have on construction project performance. Several criteria are normally used to select construction contractors, competitiveness of the quoted prices of the prospective contractors is one such important criterion. However, choosing contractors solely on the basis of the quoted price may cause poor performance in the construction project. Design/methodology/approach – A quantitative approach was adopted. A critical review of the literature was conducted to develop 50 survey questions relating to the problems that CBCS might have on construction project performance. Findings – Analysis of close data obtained from the survey of construction experts showed the nature of project performance problems associated with the CBCS to be project time delays and non-compliance with construction standards. The major reason they occurred was found to be the reduced profit margin for contractors. Research limitations/implications – The research sample size is small and restricted to construction professionals in Brunei. Practical implications – The study findings present updated information to construction professionals about the inherent impacts of choosing contractors based on cost. Furthermore, this study enhances the approach of selecting contractors within the construction industry. Originality/value – The study made strong and unique arguments about the problems associated with choosing construction contractors based on cost. This study contributes to the body of knowledge relevant to the management of construction projects.


Buildings ◽  
2021 ◽  
Vol 12 (1) ◽  
pp. 26
Author(s):  
Mohammed Albattah ◽  
Amna Shibeika ◽  
Muhammad Sami Ur Rehman

The construction industry in the United Arab Emirates (UAE) is faced with negative project performance, including low productivity, higher costs, delays in project completion, and defects during construction. One of the main reasons for these issues is the engagement of unskilled craft workers. Despite these labor issues, demand for construction projects in the UAE has been explosively increasing, in part due to Dubai winning the hosting of Expo 2020, which has given rise to an unprecedented demand for skilled construction craft workers. This study aimed to investigate the views and experiences of construction project managers regarding the reasons and challenges associated with the hiring of skilled craft workers in the construction labor market of the UAE. To fulfill the study purpose, the authors conducted structured open-ended interviews with UAE construction project managers. The results revealed several reasons for hiring craft workers despite a clear lack of qualifications and suggest some potential solutions.


2018 ◽  
Vol 2 (6) ◽  
pp. 1-10
Author(s):  
Zaina Ahmed Hameed ◽  

The purpose of the research is to identify the factors that contributes to cost escalation and delay of PPP construction projects in Maldives and to identify the significant factors in the perspective of the actors (client, contractor and consultant). In this quantitative research, a survey comprising the actors who have had previous experience in the field of PPP construction projects were used. The data analysis was carried out using Relative and Important Index (RII). The key findings indicate that the most significant factor for cost escalation is scope changes, followed by schedule delay and technical challenges and the most significant factor for project delay was delayed payments, followed by financial process, changes in drawings and poor supervision. The study contributes to the body of knowledge in construction industry by identifying the most significant factor which contributes to cost escalation and project delay in Maldives. The study is particularly useful for policymakers as a guide for planning and implementing PPP projects in the construction industry of Maldives.


2016 ◽  
Vol 47 (6) ◽  
pp. 44-55 ◽  
Author(s):  
Tarila Zuofa ◽  
Edward Ochieng

Accomplishing sustainability-related targets in construction projects is progressively becoming popular. While some stakeholders generally recognize it as important, there are others with differing opinions. This article reports the results of an exploratory study involving interviews with 25 senior project managers from the construction industry who are involved in sustainability in some way. The main findings suggest that holistic sustainability practices and initiatives during the life cycles of projects in the construction industry have not been fully embraced. Although all interviews were carried out in Nigeria, the results may be applicable or interesting to other countries as well.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ernest Kissi ◽  
Kofi Agyekum ◽  
Theophilus Adjei-Kumi ◽  
Debrah Caleb ◽  
Ekow Donkor Micheal

PurposeReligiousness is evident in every aspect of life, and its impact on construction project performance is undeniable. However, little has been done to fully understand the influences one's religiosity has on performance factors. This paper aims to explore the influence of religious elements on performance factors in the Ghanaian construction industry (GCI).Design/methodology/approachUsing a desk survey and closed-ended questionnaire, data were obtained from the three religious' bodies (Christianity, Islamic and Traditionalist) in Ghana. The analysis of the collected data was done using mean score ranking and regression analysis.FindingsIt was revealed that most of the religious bodies were aware of the presence of the seven factors identified for measuring construction project performance. The findings suggested that there was a significant and positive relationship between the religious elements (of all the three religions) and cost as well as schedule performance. Islam recorded the highest relationship in influencing public construction project performance relative to cost performances. Specifically, 1% increase in Islamic elements accounted for an 82.7% increase in cost performance. Traditionalists and the Christian religion had minimal significance in influencing cost performance. Furthermore, a 1% progress in Islamic elements accounted for a 45.8% increase in the schedule performance of construction projects and among construction professionals.Research limitations/implicationsThis study has provided better understanding of the religious views on project performance. This research has also provided pragmatic directions to project stakeholders to encourage religious groups to take critical look at the other performance factors that were seen not to be significant.Originality/valueThis paper represents a novel attempt to measure the influence of religious elements on project performance factors in the construction industry. A key contribution to the body of knowledge is that the study has proven that religious element has tendencies to influence cost performance and schedule performance in the construction industry.


2021 ◽  
Vol 9 (4) ◽  
pp. 49-53
Author(s):  
A Sangamithra ◽  
S Vishnu

According to the World Health Organization (WHO), each year universally, about 14 million people have realized that they have cancer and eight million individuals die from cancer. Cancer is a term for a group of diseases that can affect any part of the human body. Some more terms used are malignant tumors and neoplasms. Defining cancer is the quick creation of abnormal body cells that develop outside their usual borders and occupy adjoining parts of the body and extent to another organ of the body. The study aims to assess the cost incurred for Treatment among cancer patients in Coimbatore. The research source is from both primary and secondary data. The primary data was collected from two hospitals in Coimbatore through constructed exit interview schedule and secondary sources from from other various journals and articles.


Unity Journal ◽  
2021 ◽  
Vol 2 ◽  
pp. 251-262
Author(s):  
Sumitra Karki

Nepal has been a home to diversified settlement in terms of ethnicity, religion, dialect and culture since its outset in civilization. It also lies between two great military and economic giants of Asia – India and China – that are hostile to each other. While these bring abundant opportunities for Nepal, it possesses several internal and external security threats. Nepal suffers from cyber-attack, environmental degradation, pandemic, ethnic, racial or religious conflicts, inequality and poverty, extremism, human trafficking, corruption, migration and trans-boundary crime. In addition, Nepal also faces several security threats, traditional and non–traditional, including terrorism and insurgency. These threats possess serious implications on peace and security of Nepal and the South Asian region. There is a need of serious study about the major internal and external security challenges that Nepal faces in recent decades. This study aims at examining some of the major security challenges, explore the factors behind it, and attempt to suggest few policy recommendations to the government of Nepal to deal with them. The study is conducted by reviewing the primary and secondary sources of data. The primary data includes documents of the government agencies, press release, joint statement and organizational reports. It also includes the interviews with security experts, bureaucrats, policy makers and academicians. Similarly, secondary data includes books, news reports, academic journals, seminars report and reports of research institutes and think tanks. The study highlights that Nepal should prepare itself to meet with the emerging internal and external security challenges what have emerged in recent times. With the rise of India and China, two adversarial powers in the region, Nepal possess extreme challenges in days to come. Similarly, hardly any countries of the world had prepared itself to deal with recent pandemic like COVID-19 that has shattered even the most powerful countries of the world. Taking lessons from these, it is time for Nepal to learn and prepare to mitigate the challenges.