scholarly journals URBAN INFRASTRUCTURE PROJECTS AND CHALLENGES, RISK IDENTIFYING FOR EMERGING NEW CITIES OF NEPAL

2018 ◽  
Vol 6 (12) ◽  
pp. 97-108
Author(s):  
Madhav Prasad Koirala

Nepal is beautiful country. According to new geographical structure there are six metropolitan cities, eleven sub-metropolitan cities. Seventeen cities are already urbanized and two hundred and seventy-six municipalities are also newly emerging cities. The objective of this research is mainly urban infrastructure development, its challenges, explore the problems, identify defective coordination within the interdisciplinary ministry, suggest for integrated infrastructure, to aware risk factors associated during urban infrastructures. The methodology adopted was according to various literature reviews and surveys conducted on the sport. Respondent were selected from concerned authorities, this research shows everyone want affordable housing, public hospital, school, college, university, drinking water, communication, drain and sanitation facilities and wide road are prime needs. It was found the defective procurement policy including various risk factors, a lack of adequate government’s act with necessary policies, vision of leader is not globally thinking and locally acting, human resource is not compatible, the poor performance of contactor and consultant, project manager is not being professional and allocating budget is not enough, since one authority built, immediately other authority dig the trench. if government started integrated urban infrastructure projects would better for future and proper risk management plan needs to establish.

2017 ◽  
Vol 7 (2) ◽  
pp. 30-52 ◽  
Author(s):  
Do Tien Sy ◽  
Veerasak Likhitruangsilp ◽  
Masamitsu Onishi ◽  
Phong Thanh Nguyen

The rapidly increasing demand and the inefficacy of financing transportation infrastructure project investments have contributed to various challenges for Vietnam in recent decades. Since the country’s budget is inadequate for investing in all necessary infrastructure projects, the Vietnam government has been inviting other economic sectors, especially the private sector, to participate in infrastructure development. The cooperation between the government agencies and the private entities, called PublicPrivate Partnership (PPP), must encounter various challenges leading to difficulties in attracting private investors. A main reason is that private investors must deal with critical risks concerning PPP investment environment. It is a challenging task for the government to optimally manage such risks to enhance the attractiveness of PPP projects for private investors. This paper examines the critical risk factors that influence the private sector’s investment decisions on PPP transportation projects in Vietnam. Risk factors inherent in typical PPP projects were compiled by comprehensive literature review. To reflect unique characteristics of PPP projects in Vietnam, the compiled risk factors were reviewed by a group of PPP experts from both the public and private sectors in Vietnam through indepth interviews and questionnaire surveys. In addition, ten PPP project case studies in Vietnam were analyzed to derive the risk profile of PPP transportation projects of the nation. These risk factors were quantitatively assessed based on their probabilities and impact levels. We found that the critical risk factors of PPP infrastructure projects in Vietnam are acquisition/compensation problems, approvals and permits, inadequate feasibility studies, finance market issues, subjective evaluation methods, and change in laws and regulations. By performing factor analysis, these critical risk factors were grouped into four categories: (1) bidding process, (2) finance issues, (3) laws and regulations, and (4) project evaluation issues. These critical risk factors represent the obstacles that repel private investors from PPP transportation projects in Vietnam. Thus, the Vietnam government agencies should meticulously address these issues to attract both domestic and foreign private investors in PPP projects.


2009 ◽  
Vol 3 ◽  
pp. 9-15 ◽  
Author(s):  
Don Messerschmidt

‘Risk' is a major point of focus in the literature on resettlement and reconstruction associated with the impacts of major infrastructure development on project affected individuals and families. Previous approaches to risk appear to emphasize the negative consequences of development, and it is no wonder then that project affected people often emphatically resist development and change. This paper proposes that a more pro-active, positive opportunities and benefits approach be taken in dealing with resettlement and reconstruction associated with large scale infrastructure projects. The discussion is focused on the eight ‘risk factors' (or ‘opportunity factors'?) listed in the well known ‘Impoverishment Risk and Reconstruction' (IRR) Model. Three more such factors are added to the list based on field experience in South Asia. The point is that by emphasizing the potential opportunities and benefits, project affected people are more likely to be supportive of projects that may disrupt their lives. Key words: Resettlement, opportunities, risk, IRR model, South Asia, infrastructure development  doi: 10.3126/hn.v3i0.1912 Hydro Nepal: Journal of Water, Energy and Environment Issue No. 3, January, 2008 Page 9-15


2019 ◽  
Vol 15 (2) ◽  
pp. 125-135
Author(s):  
Tatiana S. Minaeva ◽  
Sergey S. Gulyaev

Introduction. The organization of transport links and the bridge building in cities located on the banks of wide rivers has always been one of the most important tasks of the local administration. The study of the history of bridge building allows not only to trace the process of modernization of different regions of the country, but also to help in solving similar problems of our time. Nevertheless, the history of Russian bridge building is poorly studied. The purpose of the article is to determine the characteristics and features of the organization of bridge building in big cities of the European North of Russia as a way to solve one of the problems of urban infrastructure in the early XX century. Materials and Methods. The sources for this study are the documents of the State archive of the Arkhangelsk region, published documents on the history of Vologda, articles in the local periodicals of the early XX century. The analysis of the studied problem used a systematic approach, the method of economic analysis, historical and historical-comparative methods. Results and Discussion. The building of permanent bridges was a need for the development of Arkhangelsk and Vologda. In Vologda the two wooden bridges were built in the middle of XIX century on city funds and in the future these bridges were repaired or rebuilt. The Arkhangelsk city authorities did not hurry to solve a problem of city infrastructure by own efforts and a long time they used the floating bridge. The lack of experience in the building of large bridges and the desire to save money led to the rapid destruction of the first permanent bridge in Arkhangelsk. Conclusion. The Development of trade and industry in cities of the European North of Russia, such as Arkhangelsk and Vologda, led to the expansion of their territory and the emergence over time, the so-called third parts of the cities. Despite the comparable size of the population of the districts located across the river, the process of connecting them with bridges to the rest of the city went at different rates, which depended on the attitude of the local administration to the problem of urban infrastructure.


2020 ◽  
Vol 18 (4) ◽  
pp. 765-779
Author(s):  
E.V. Popov ◽  
K.A. Semyachkov ◽  
K.V. Zhunusova

Subject. This article explores the basic elements of the engineering infrastructure of smart cities. Objectives. The article aims to systematize theoretical descriptions of the engineering infrastructure of a smart city. Methods. For the study, we used a logical analysis and systematization. Results. The article highlights the main areas of infrastructure development of smart cities. Conclusions. Improving process management mechanisms, optimizing urban infrastructure, increasing the use of digital technologies, and developing socio-economic innovation improve the quality of the urban environment in a digitalized environment. And improving the efficiency of urban planning and security, studying its properties and characteristics, and forming an effective urban information system lead to its functional transformations.


Author(s):  
Alvin J. X. Lee ◽  
Karin Purshouse

AbstractThe SARS-Cov-2 pandemic in 2020 has caused oncology teams around the world to adapt their practice in the aim of protecting patients. Early evidence from China indicated that patients with cancer, and particularly those who had recently received chemotherapy or surgery, were at increased risk of adverse outcomes following SARS-Cov-2 infection. Many registries of cancer patients infected with SARS-Cov-2 emerged during the first wave. We collate the evidence from these national and international studies and focus on the risk factors for patients with solid cancers and the contribution of systemic anti-cancer treatments (SACT—chemotherapy, immunotherapy, targeted and hormone therapy) to outcomes following SARS-Cov-2 infection. Patients with cancer infected with SARS-Cov-2 have a higher probability of death compared with patients without cancer. Common risk factors for mortality following COVID-19 include age, male sex, smoking history, number of comorbidities and poor performance status. Oncological features that may predict for worse outcomes include tumour stage, disease trajectory and lung cancer. Most studies did not identify an association between SACT and adverse outcomes. Recent data suggest that the timing of receipt of SACT may be associated with risk of mortality. Ongoing recruitment to these registries will enable us to provide evidence-based care.


2021 ◽  
Vol 14 (3) ◽  
pp. 92
Author(s):  
Mohammad Ajmal Nikjow ◽  
Li Liang ◽  
Xijing Qi ◽  
Samad Sepasgozar

Engineering procurement and construction (EPC) is a normative practice globally approved since China has been engaging in international cooperation under the Belt and Road Initiative (BRI) infrastructure development. EPC has been adopted in the delivery of BRI infrastructure projects in other countries. Compared to the domestic method of contract, EPC remains at a low level in management practice, such as a lack of coordinating diverse project stakeholders, high cost of information communication, and risk in complex environments in West Asia (WA). However, no research has conducted a strategic analysis of the current situation of EPC for BRI infrastructure projects in West Asian countries. This study aims to understand the current status quo of EPC for BRI projects in WA by performing a strength, weakness, opportunity, and threats (SWOT) analysis and with the support of data collected from the literature review and semi-structured interviews with EPC stakeholders. The study brings awareness along which internally and externally circumstances of the EPC for BRI infrastructure projects can be perceived by major stakeholders participating. The four critical strategies presented based on the SWOTs identified could help EPC firms develop and promote EPC to implement BRI infrastructure projects in WA at the strategic level.


Author(s):  
Iván Galtier ◽  
Antonieta Nieto ◽  
María Mata ◽  
Jesús N. Lorenzo ◽  
José Barroso

ABSTRACT Objective: Subjective cognitive decline (SCD) and mild cognitive impairment (MCI) in Parkinson’s disease (PD) are considered as the risk factors for dementia (PDD). Posterior cortically based functions, such as visuospatial and visuoperceptual (VS-VP) processing, have been described as predictors of PDD. However, no investigations have focused on the qualitative analysis of the Judgment of Line Orientation Test (JLOT) and the Facial Recognition Test (FRT) in PD-SCD and PD-MCI. The aim of this work was to study the VS-VP errors in JLOT and FRT. Moreover, these variables are considered as predictors of PDD. Method: Forty-two PD patients and 19 controls were evaluated with a neuropsychological protocol. Patients were classified as PD-SCD and PD-MCI. Analyses of errors were conducted following the procedure described by Ska, Poissant, and Joanette (1990). Follow-up assessment was conducted to a mean of 7.5 years after the baseline. Results: PD-MCI patients showed a poor performance in JLOT and FRT total score and made a greater proportion of severe intraquadrant (QO2) and interquadrant errors (IQO). PD-SCD showed a poor performance in FRT and made mild errors in JLOT. PD-MCI and QO2/IQO errors were independent risk factors for PDD during the follow-up. Moreover, the combination of both PD-MCI diagnosis and QO2/IQO errors was associated with a greater risk. Conclusions: PD-MCI patients presented a greater alteration in VS-VP processing observable by the presence of severe misjudgments. PD-SCD patients also showed mild difficulties in VS-SP functions. Finally, QO2/IQO errors in PD-MCI are a useful predictor of PDD, more than PD-MCI diagnosis alone.


Healthcare ◽  
2021 ◽  
Vol 9 (6) ◽  
pp. 778
Author(s):  
Ann-Rong Yan ◽  
Indira Samarawickrema ◽  
Mark Naunton ◽  
Gregory M. Peterson ◽  
Desmond Yip ◽  
...  

Venous thromboembolism (VTE) is a significant cause of mortality in patients with lung cancer. Despite the availability of a wide range of anticoagulants to help prevent thrombosis, thromboprophylaxis in ambulatory patients is a challenge due to its associated risk of haemorrhage. As a result, anticoagulation is only recommended in patients with a relatively high risk of VTE. Efforts have been made to develop predictive models for VTE risk assessment in cancer patients, but the availability of a reliable predictive model for ambulate patients with lung cancer is unclear. We have analysed the latest information on this topic, with a focus on the lung cancer-related risk factors for VTE, and risk prediction models developed and validated in this group of patients. The existing risk models, such as the Khorana score, the PROTECHT score and the CONKO score, have shown poor performance in external validations, failing to identify many high-risk individuals. Some of the newly developed and updated models may be promising, but their further validation is needed.


2017 ◽  
Vol 27 (1) ◽  
pp. 60-64
Author(s):  
U. R. Sharma

 Forest conversion has been identified as one of the several bottlenecks affecting upon the major infrastructure projects in Nepal, especially in the energy and transport sectors. Nepal’s policy requires at least 40% of its land cover under forest. This means if any forest land is converted to non-forest land, it must be compensated with an equivalent area, preferably in the similar ecotype in the nation. In addition, a specified number of trees must be planted for the number of trees felled in the project site, and the site must be managed and protected for five years by the developers. These provisions have led to growing resentment between the developers and the Ministry of Forests and Soil Conservation (MFSC), leading to delay in providing forest lands for infrastructure projects. With a view to develop mechanisms for the government to rapidly provide forest land for nationally important infrastructure projects, the Government databases were examined to analyze the forests handed over to the developers for non-forestry uses. The data showed that a total of 14,028.4 ha of forest area were handed over to the developers for non-forestry uses until the end of 2015. On an average, 263.8 ha forest area was found to be handed over to the developers between the period of 2010–2013. However, there is a declining trend of forest handed over for non-forestry purposes in the recent years. The decline could be due to the strict enforcement of the legal provision which limits the conversion of forest areas to non-forest areas except in the case of the “national priority projects”. It has been recommended that the conversion of forest for infrastructure development should be examined with a holistic perspective by taking all the related components of forest conversion into consideration, from providing forest land for replacement planting. It is recommended that the Forest Product Development Board (FPDB), a parastatal organization under the MFSC, should be entrusted with the work of plantation related to forest conversion. The fund for this work should flow directly from the developers to the FPDB. The possibility of forming a land bank to facilitate the work of the FPDB is also recommended.Banko Janakari, Vol. 27, No. 1, Page: 60-64


Author(s):  
Leandro Benmergui

As the number of favelas and poor residents of Rio de Janeiro grew quickly by the mid-20th century, they became the object of policymaking, social science research, real estate speculation, and grassroots mobilization. After a decade in which local authorities recognized the de facto presence of favelas but without legally ascertaining the right of permanence, the 1960s and early 1970s witnessed the era of mass eradication. Seemingly contradictory—but complementary—policies also included the development of massive low-income housing complexes and innovative community development and favela urbanization experiences empowered by community organizations with the assistance of experts committed to improving the lives of poor Cariocas (residents of Rio). Favelas in Rio were at the crossroads of a particular interplay of forces: the urgent need to modernize Rio’s obsolete and inadequate urban infrastructure; the new administrative status of the city after the inauguration of Brasilia; and the redefinition of the balance of power between local, municipal, and federal forces in a time of radical politics and authoritarian and technocratic military regimes, Cold War diplomacy, and the transnational flows of expertise and capital.