PERBANDINGAN PERSEDIAAN BAHAN BAKU DAN BAHAN TAMBAHAN DENGAN METODE ECONOMICAL ORDER QUANTITY PADA PT. JAPFA COMFEED INDONESIA tbk

2017 ◽  
Vol 1 (2) ◽  
Author(s):  
putri suwarni ◽  

Abstract The results of initial observation at PT. Japfa Comfeed Indonesia obtained data that the company always buys raw materials and auxiliary materials in large quantities and does not pay any attention to reorder in order not to run out of stock of raw materials and additives. To describe and analyze the optimal inventory and minimize the total cost of raw material inventory and additive then conducted qualitative research extrapolation (descriptive) by using EOQ method. The object of this research is the amount of raw material inventory and additional material at PT. Japfa Comfeed Indonesia. The raw material in this research is Brand Pollard, Stone Flour. Additional materials include Termin and Palm Oil. The results obtained with the optimal buyer Brand Pollard in 2016 amounted to 1,185,906 kg and in 2016 amounted to 1,215,745 kg. The purchase of Stone Flour 2016 is 677,847 kg and in 2016 it is 711,395 kg. The purchase of Palm Oil and Terminal in 2015 amounted to 282,281 liters and 212,776.8 liters respectively. Brand Pollard reorder point in 2015 and 2016 amounted to 139.968 kg Purchase of Stone Flour in 2015 and 2016 amounted to 38,166 kg. Palm Oil and terminal purchases in 2015 and 2016 amounted to 19,200 liters and 16,440 liters respectively. Financially, the company can make inventory cost savings up to Rp 88,043,000.00. The conclusion of this research is the determination of the amount of raw material inventory and additional material with EOQ method which more efficient compared with company policy. The optimal inventory and total inventory cost savings can be obtained by EOQ method so that the company can obtain maximum profit. Suggestion related to this research is company must evaluate applied policy and apply EOQ method in management of raw material inventory and additional material to get maximum profit. Keywords : Raw Material Inventory, Supplementary Material Inventory, Total Quantity Economica

2019 ◽  
Vol 3 (01) ◽  
pp. 47-52
Author(s):  
Ratnawia ◽  
Rio Aurachman ◽  
Saskia Puspa Kenaka

OPQ is a company engaged in the automotive manufacturing industry. The company produces bolts for the safety area, it is related to the lower body of the four-wheeled vehicle. PT. OPQ was established in 2014 and today has already been the supplier for several major automotive companies in Indonesia. The demand of PT OPQ that must be fulfilled is increasing as the amount of consumer is increasing too. Due to the high demand, so the raw material stockout occurs. This make the company's service level is below the standard.   This study involved 48 sku of material raw materials that have normal distributed demand. Inventory policy applied in this research is periodic review (R, s, S) with the aim to minimize total cost of inventory and improve service level of company.   The result of this research was found to decrease total inventory cost by 15% with the value of existing inventory cost Rp1.100.879.479,- to Rp 936.061.349,- . In addition, service level at PT. OPQ has increased with the value of existing conditions 85% to 99%.   Keywords—Raw Material, Periodic Review, Probabilistic, Service Level, Stock out


2020 ◽  
Vol 2 (2) ◽  
pp. 340
Author(s):  
Rizkyani Pratama ◽  
Yulius H Saptomo ◽  
Dirarini Sudarwadi

Controlling and determining of inventory is an important thing in order to produce efficiently and able to make smooth sales. The purpose of this research is to know an analysis of controlling raw material inventoriesin the manufacture of brick by using Economic Order Quantity (EOQ) method to increase efficiency of the total inventory costin Stan Kayu Sinar Sowi. The raw material of brick is rough sand and cements. Type of case study research through a qualitative approach by means of interviews, observation and documentation. Case study on a wood booth business in Manokwari, West Papua. The results of the study that the purchase of raw materials made by the company is considered less efficient, because company policies tend to cause expenditure to be greater in the amount of Rp.606,620,250 for 12 months (1 period), while using the Economic Order Quantity (EOQ) method will issue a fee of Rp.550,712,500 for the same period. Using the Economic Order Quantity (EOQ) method, the order quantity is higher and the order frequency will be lower, resulting in order cost savings and increasing the total inventory cost efficiency.


2021 ◽  
Vol 328 ◽  
pp. 05002
Author(s):  
Dira Ernawati ◽  
Sinta Dewi ◽  
Ni Ketut Sari ◽  
Kurniawan Budianto

Inventory is one of the current assets that can be classified as company assets. But in reality, inventory often turns into an operational problem that can affect the company's overall performance. This problem occurs due to the incorrect determination of the amount of inventory. Both excess and shortage of inventory can lead to cost overruns. This study applies the Wagner Whitin Algorithm and the Silver-Meal method in the lot-sizing process and the ABC (Always Better Control) method in determining the classification of raw materials at PT. X. Using the ABC method, it is known that the ADC-12 Ingot item has a very significant effect to inventory. Inventory optimization using the Wagner Whitin Algorithm and the Silver-Meal method resulted in the optimal frequency of ordering ADC-12 Ingots is 9 times and the total inventory cost is 994,098,000 IDR as well as inventory cost savings of around 18,403,180 IDR or 1.8% of the cost of existing inventory.


Author(s):  
Ratna Wia ◽  
Rio Aurachman ◽  
Saskia Puspa Kenaka

PT. OPQ is a company engaged in the automotive manufacturing industry. The company produces bolts for the safety area, it is related to the lower body of the four-wheeled vehicle. PT. OPQ was established in 2014 and today has already been the supplier for several major automotive companies in Indonesia. The demand of PT OPQ that must be fulfilled is increasing as the amount of consumer is increasing too. Due to the high demand, so the raw material stockout occurs. This make the company's service level is below the standard. This study involved 48 sku of material raw materials that have normal distributed demand. Inventory policy applied in this research is periodic review (R, s, S) with the aim to minimize total cost of inventory and improve service level of company. The result of this research was found to decrease total inventory cost by 15% with the value of existing inventory cost Rp1.100.879.479,- to Rp 936.061.349,- . In addition, service level at PT. OPQ has increased with the value of existing conditions 85% to 99%.


2019 ◽  
Vol 1 (2) ◽  
pp. 415-423
Author(s):  
Elia Rahayu R ◽  
Nor Norisanti ◽  
Acep Samsudin

The purpose of this study is to control the supply of raw materials using the Economic Order Quantity (EOQ) method in Tahu Nugraha Jaya Sukabumi UKM. The data analysis method used is quantitative descriptive to describe and describe the data to be examined and then processed using EOQ. This study uses the EOQ method to determine the total inventory cost. The data needed in this study are the number of purchases of raw materials, the amount of use of raw materials, storage costs, and ordering costs. The results of this study indicate that by applying the EOQ method can further optimize the supply of raw materials by minimizing raw materials with increased inventory. With the application of the Economic Order Quantity (EOQ) method it shows more efficient than conventional methods of the company. Conclusions, seen from the difference in the TIC of the two methods, the more efficient method is the Economic Order Quantity (EOQ) method that is equal to 244,392.94 while the calculation used by the company is 374,325. so that it can be obtained that there is a difference between the Company TIC and the EIC method TIC. Keywords: Raw Material Inventory, Production Process


2018 ◽  
Vol 1 (1) ◽  
pp. 21-27
Author(s):  
Desi Rahma Yani ◽  
Mega Amelia Putri ◽  
John Nefri

Inventory management has an important role in a company because inventory management can decrease production cost. Economic order quantity using to minimize the production cost. Inventory management of flour in bread company Nikki Echo not been seen clearly prove by  so many booking amount. It can giving addition of cost. The purpose of this research is (1) Analyzing optimal flour stock by using EOQ method in bread company Nikki Echo, (2) Analyzing reorder point raw material inventory by using EOQ method in bread company Nikki Echo, (3) Analyzing total raw material inventory cost by using EOQ method in bread company Nikki Echo. This research be held from February 20 until April 19 2018 in bread company Nikki Echo, Tanjung Pauh, Payakumbuh city, West Sumatera province. Flour stock by using EOQ method as much 17.394 kg it means the amount greater than company policy. That amount increase 79,6% from the amount set by company. Frequency of booking less than company policy that is 7 times booking. Amount of reorder by using EOQ method is 10.251 kg with the inventory lead time for 3 days. Total inventory cost by using EOQ method as many Rp 11.445.513. This value small than total inventory cost issued by company policy. Decreasing cost amount 98% from company policy. That cause by ordering amount reduced 33 times or same with 82,5% from the amount before


2018 ◽  
Vol 3 (1) ◽  
Author(s):  
Puspandam Katias ◽  
Achmad Affandi

The increasing competition in the manufacturing industry caused increasing inconsumer demand of the quality and quantity of a good product. Therefore, manufacturing companies must have reliable services, policies and product qualities to satisfy its customers. So it needs to be supported by efficient production system and inventory system. To able to create an efficient production system then need a good raw material inventory planning. This research aims to compere how efficiently in planning raw materials inventory between Wagner-Within Algorithm with the actual concept that applied to PT X, Sidoarjo. The methodology of this research is qualitative descriptive research. The findings this research is engaged in packaging (woven bag and jumbo bag) with main raw materials such as plastic ore and supporting material in inner, thread, additive, and pigment. Based on the result of the analysis is known that the actual concept of the company gives the total inventory cost IDR 3.151.000.000 with the frequency of ordering 12 times while WagnerWithin Algorithm method provides a more efficient total inventory cost of Rp. 2.685.821.101 with8 times the frequency of ordering and can savings of 14.8% of total raw material inventory cost.


2020 ◽  
Vol 18 (2) ◽  
Author(s):  
Khoirul Hidayat ◽  
Jainuril Efendi ◽  
Raden Faridz

<em>The increase in the food industrial sector over the year making food producers experience tighter competition. In this era of intense competition in the food industry, raw material inventory control in PT. Surya Indah Food Multirasa is still facing a problem of lacking raw material in potatoes and curly potatoes every year, which affects in sale loss. This study is conducted to find out the precise amount of order in every raw material purchase, so there is no lack of raw material, at a lower cost. This study uses the Economic Order Quantity (EOQ) method for analyzing raw material control for potatoes and curly potatoes. Comparing the uses of company policy and EOQ. EOQ analysis calculation followed by conducting safety stock (SS) analysis, maximum inventory (MI) analysis, Total Inventory Cost (TIC) analysis, and reorder point (ROP) analysis, therefore, optimal stock for the company can be discovered. The result of EOQ analysis showed that the EOQ method is more efficient than company policy with TIC average difference for potato’s raw material that is Rp. 856.124 and curly potatoes raw material that is Rp. 1.065.989. The average EOQ value of potato’s raw material is 344 kg while curly potatoes are 234 kg. Next is the average SS value for potato raw material is 75 kg while curly potatoes are 35 kg, and the average ROP value for potato raw is 123 kg while curly potatoes are 58 kg. This research also performs forecasting using Winter’s method so that data demand for the year of 2019 can be discovered. The forecast result with the EOQ method for the year 2019 is 371 kg for potato's raw material and 258 kg for curly potatoes.</em>


BISMA ◽  
2021 ◽  
Vol 15 (1) ◽  
pp. 65
Author(s):  
Eka Bambang Gusminto ◽  
Didik Pudjo Musmedi ◽  
Ariwinata Kriswardhana

This study aims to determine the optimal amount of raw materials inventory needs and the reorder point of raw materials in UD Purnama Jati Jember. UD Purnama Jati Jember is a company engaged in the production of Jember Regency speciality food and souvenirs. Due to not having a standard method, there are problems of raw material inventory in the production process, including overproduction and excess or shortage of raw materials. Data were obtained by interviewing the company owner and observing the company's production process. Data analysis were performed using least square forecasting, JEOQ, safety stock, and reorder points method. The results of the study showed that the optimal raw material needs are 4,644.772 kg of tape, 2,491.411 kg of wheat flour, 3,967.927 kg of egg, 1,439.623 kg of butter, and 3,519.371 kg of sugar. The total inventory cost of raw material is Rp. 281,296,067 indicated a more efficient inventory cost than the previous method. Meanwhile, the amount of raw materials inventory for the reordering point is 417.39 kg of tape, 231.29 kg of wheat flour, 358.88 kg of eggs, 131.78 kg of butter, and 318.99 kg of sugar. Keywords : JEOQ, raw materials control, reorder point, total inventory costs


2020 ◽  
Vol 2 (1) ◽  
pp. 22
Author(s):  
Sandi Wardani ◽  
Sri Rahayuningsih ◽  
Ana Komari

This study aims to analyze the availability of raw materials at PT. Akasha Wira Internasional Tbk, analyzes the total cost of raw material inventories, analyzes to reorder point raw materials, analyzes the amount of safety stock of raw materials, analyzes raw material inventory control. The analytical method used is the Economic Order Quantity method, which is to find out the optimal order or purchase quantity with the aim of minimizing inventory costs consisting of ordering costs and storage costs. The results showed that the purchase of optimal ades 1500 ML label raw materials according to the Economic Order Quantity method during the 2017 period for each message was greater than what the company did. The optimal purchase of raw materials that must be done by the company in 2017 is 397 m with the frequency of ordering that must be done as much as 2 times. The safety stock quantity that must be available in the warehouse is 480.15 m and the Re Order Point according to the Economic Order Quantity is at the time of the inventory in the warehouse is 512.91 m. The total inventory cost for the production process incurred according to the Economic Order Quantity method is smaller than the total inventory cost incurred by the company. Keywords: Inventory, Raw Materials, Economic Order Quantity  Penelitian ini bertujuan untuk menganalisis ketersediaan bahan baku di PT. Akasha Wira Internasional Tbk, menganalisis total biaya persediaan bahan baku, menganalisis untuk melakukan pemesanan kembali (reorder point) bahan baku, menganalisis jumlah persediaan pengamanan barang  (safety stock) bahan baku, menganalisis pengendalian persediaan bahan baku. Penggunaan pendekatan yaitu metode Economic Order Quantity sebagai cara menyimpan bahan baku untuk ketersediaan biaya pesan dan biaya simpan bahan baku. Data yang diperoleh adalah data primer dan data sekunder. Pada bahan baku  ades 1500 ML tahun 2017 memiliki tingkat pemesanan yang lebih tinggi. Pembelian bahan baku optimal yang harus dilakukan perusahaan pada tahun 2017 adalah sebesar 397 m dengan frekuensi pemesanan yang harus dilakukan adalah sebanyak 2 kali. Kuantitas persediaan pengaman yang harus tersedia digudang adalah sebesar 480,15 m dan titik pemesanan kembali menurut Economic Order Quantity yaitu saat persediaan digudang tinggal 512,91 m. Maka dalam proses produksi menurut EOQ lebih kecil diabnding dengan total pembiayaan dari perusahaan.  Kata Kunci :  Persediaan , Bahan Baku, Economic Order Quantity