Collaborative & Multidiscipline Working - From Theory to Practice in 48 Hours

2016 ◽  
Vol 5 (2) ◽  
pp. 55-71 ◽  
Author(s):  
David Comiskey ◽  
Mark McKane ◽  
Eóin O'Shea ◽  
John Hughes ◽  
Sean McNiff ◽  
...  

Latest statistics would indicate that the policy related to Building Information Modelling (BIM) implementation is working, with awareness and usage figures for both the UK and Ireland going over the 50% mark for the first time. However, whilst these results are positive, there is a realisation that there is still a distance to travel before BIM use could be considered comprehensive. This would suggest that there is still a need for a greater number of case studies to promote collaborative working practices, the BIM process and the benefits and challenges associated with its use. This paper intends to assist in this regard by documenting the outcomes from a 48-hour BIM competition in which the authors participated. Although the project was hypothetical, it allowed for collaborative working via a cloud based platform, simulating real world practice and many of the working methods required to deliver BIM Level 2. The paper will focus on providing critical analysis of the challenges faced and the lessons to be learnt from the implementation of BIM processes on this project.

2020 ◽  
Vol 18 (14) ◽  
Author(s):  
Siti Nora Haryati Abdullah Habib ◽  
Syuhaida Ismail ◽  
Sharifah Mazlina Syed Khuzzan

Public Private Partnership (PPP) projects involve stakeholders engaged in various contract structures in a lengthy contract duration. Such situations expose the projects to risks related to collaborative working and information integration. Building Information Modelling (BIM) is seen as a mechanism to improve the collaboration and integration in the PPP projects. However, BIM also exposes its users to additional risk when the barriers in sharing information are reduced. Therefore, the aim of this paper is to investigate the BIM risk factors that have significant impact towards PPP projects implementing BIM. Since the United Kingdom (UK) is considered advanced in practising PPP and BIM, this study investigates the UK industry players’ views on what they considered as significant BIM factors in PPP projects. Consequently, the study has identified six (6) most significant BIM risk factors through questionnaire and experts’ interviews. The findings provide a lesson learnt for Malaysia to consider the BIM risks in implementing BIM in PPP projects.


2016 ◽  
Vol 5 (2) ◽  
pp. 39-54 ◽  
Author(s):  
Mark Kelly ◽  
Mark Costello ◽  
Gerard Nicholson ◽  
Jim O'Connor

Building Information Modelling (BIM) refers to a new collaborative way of working, which places a digital model at the epicentre of the construction process to inform decisions during the entire lifecycle of a project. In the UK, BIM Level 2 is now a mandatory requirement for all centrally-procured government projects. This is not the case in Ireland but there is evidence that clients are driving this transition via the inclusion of Employer Information Requirements in design-phase tender documentation. This move towards BIM Level 2 poses a number of challenges as it marks a significant shift from the way a project has been traditionally procured, designed, constructed and operated. In this challenge lies an opportunity for the higher education sector to respond by developing appropriate learning opportunities, both for students and industry stakeholders. This paper will chart how a close collaboration between the Galway-Mayo Institute of Technology (GMIT) and the RPS Group facilitated the development of a flexible higher education programme in BIM.


Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke ◽  
Martin Crouch

The UK Construction Industry through its Government Construction Strategy has recently been mandated to implement Level 2 Building Information Modelling (BIM) on public sector projects. This move, along with other initiatives is key to driving a requirement for 25% cost reduction (establishing the most cost-effective means) on. Other key deliverables within the strategy include reduction in overall project time, early contractor involvement, improved sustainability and enhanced product quality. Collaboration and integrated project delivery is central to the level 2 implementation strategy yet the key protocols or standards relative to cost within BIM processes is not well defined. As offsite construction becomes more prolific within the UK construction sector, this construction approach coupled with BIM, particularly 5D automated quantification process, and early contractor involvement provides significant opportunities for the sector to meet government targets. Early contractor involvement is supported by both the industry and the successive Governments as a credible means to avoid and manage project risks, encourage innovation and value add, making cost and project time predictable, and improving outcomes. The contractor is seen as an expert in construction and could be counter intuitive to exclude such valuable expertise from the pre-construction phase especially with the BIM intent of äóÖbuild it twiceäó», once virtually and once physically. In particular when offsite construction is used, the contractoräó»s construction expertise should be leveraged for the virtual build in BIM-designed projects to ensure a fully streamlined process. Building in a layer of automated costing through 5D BIM will bring about a more robust method of quantification and can help to deliver the 25% reduction in overall cost of a project. Using a literature review and a case study, this paper will look into the benefits of Early Contractor Involvement (ECI) and the impact of 5D BIM on the offsite construction process.


2013 ◽  
Vol 2 (3) ◽  
pp. 1-15 ◽  
Author(s):  
Volkan Ezcan ◽  
Jack S. Goulding ◽  
Murat Kuruoglu ◽  
Farzad Pour Rahimian

The complex nature of the construction process needs an intensive control and management mechanism in order to manage and process information flow. Current deficiencies in managing construction related information have been highlighted by a range of industry reports, the consensus of which has reinforced the lack of performance in the construction industry. Given this, recent research on the role of Building Information Modelling (BIM) has been proffered as a potential solution for covering these deficiencies, along with improving competitive advantage. Although limited research has concentrated on measuring BIM awareness and use, findings have been somewhat parochial and non-specific. This paper addresses this gap by concentrating on two markets: Turkey and the UK. The aim of the paper is to determine the BIM gap in terms of awareness and use, in order to form a basis for the development of future adoption strategies. A web-based questionnaire was used mirror the National Building Specification (NBS) survey (previously undertaken) in order to capture data from a new context (Turkey). The descriptive analyses of the findings and a comparison of the two countries are presented. The findings identify significant differences in BIM awareness the influence of which could provide insight for both mature and emerging markets.


2019 ◽  
Vol 19 (3) ◽  
pp. 298-320 ◽  
Author(s):  
Maria Christina Georgiadou

Purpose This paper aims to present a state-of-the-art review of building information modelling (BIM) in the UK construction practice. In particular, the aim is to examine the scope, value and practical implications of BIM implementation in residential projects by evaluating practitioners’ perspectives working in the Greater London Area (GLA). Design/methodology/approach The paper outlines the general status quo of BIM adoption and maturity in the UK. It then discusses the feasibility of BIM use in residential projects drawing on an online survey and complementary semi-structured interviews with building professionals. The cross-comparison between the evidence base and literature review uncovers the specific benefits, challenges and risks to BIM implementation in the house building sector. Findings BIM is an evaluation methodology that helps the management of digital information throughout the project lifecycle. At a conceptual level, a BIM-enabled project offers quality assurance and on-time delivery, collaboration and communication improvement, visual representation and clash detection and whole lifecycle value. The findings, however, suggest that the most frequently reported benefits are related to collaboration and the blend of product (software) and process innovation, whilst lifecycle thinking and waste reduction are often overlooked. At present, there is widespread awareness on BIM but with a financial barrier to invest in developing digital capabilities, particularly for small- and medium-sized enterprises. Practical implications The paper concludes with a critical commentary on the lack of strategic leadership in both the supply and demand side. The role of policy to streamline commercial drivers for whole lifecycle costing in procurement is endorsed to drive the change management required to address the short-term mind-set of senior management and wider fragmentation of the construction industry, also serving as a research question for further research and development in the field. Originality/value There are relatively few studies evaluating BIM perspectives in UK residential projects. This paper explores the feasibility and “real-life” value of BIM in housing practice, drawing on views and experiences of building professionals in GLA. In particular, the research findings provide an evidence base evaluating the extent to which the house building industry has the expertise and capability to operate in a BIM environment and to comply with the Level 2 mandate and explore which of the generic barriers and drivers of BIM-readiness are more relevant to the design and construction of housing projects.


Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke

It is clear that challenging economic times inspire innovative abilities and solutions in the construction industry. In particular many of these innovations focus on cost implications, saving project time, reducing or eliminating waste, increasing productivity or redefining value. There is increasing pressure in the UK construction industry for new construction innovations, technology and processes with ability to lever a significant impact relative to disrupting the existing status quo; creating solutions that promote construction efficiencies deploying means to exploiting offsite construction approaches. The increased concern and challenge globally is that as knowledge and experience grows, the offsite manufacturers and suppliers are expected to demonstrate absolute innovative solutions that will heighten the proportion of project value being delivered through the use of offsite solutions on the bases that it makes sound project and business sense. Unparalleled huge cost saving benefits to clients and end users which is more than just creating a model is yet to be realized.


2021 ◽  
Vol 26 ◽  
pp. 758-762
Author(s):  
Nashwan Dawood ◽  
Farzad Pour Rahimian

This special issue of ITCON brought together ten papers on Construction 4.0 related topics. These papers are drawn from papers presented at the 20th International Conference on Construction Applications of Virtual Reality (CONVR 2021) held at Teesside University, Middlesbrough TS1 3JN, the UK, in October 2020. CONVR is one of the world-leading conferences in the areas of Virtual Reality, augmented reality and building information modelling. Each year, more than 100 participants from all around the globe meet to discuss and exchange the latest developments and applications of virtual technologies in the architectural, engineering, construction and operation industry (AECO). The conference is also known for having a unique blend of participants from both academia and industry. The overarching theme for CONVR2020 was "Enabling the development and implementation of Digital Twins."


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sukhtaj Singh ◽  
Ezekiel Chinyio ◽  
Subashini Suresh

Purpose Project managers still face challenges with managing stakeholders. Using building information modelling (BIM) has further increased these challenges. Meanwhile, there is a paucity of research specifically focussing on the techniques which organisations are adopting to manage stakeholders within BIM-implemented projects and the associated benefits which they can reap. Thus, this paper aims to identify the key techniques, enablers and benefits of managing stakeholders within BIM-implemented projects. Design/methodology/approach An exploratory approach was adopted due to the paucity of the variables on the topic. In total, 23 semi-structured interviews were conducted in the UK through purposive and snowball sampling. The data was analysed using content analysis and the “NVivo 11 Pro” software. Findings Two key techniques and two enablers required to manage stakeholders within BIM-implemented projects were identified. Nine benefits of managing stakeholders were identified which split into interim and eventual benefits. Originality This paper provides a richer understanding of the enablers and techniques which organisations should focus on while strategising for minimum resistance from stakeholders in their BIM implemented projects.


2020 ◽  
Author(s):  
Reuben Moreton

Forensic face matching evidence has been presented in UK courts for over 30 years to provide crucial identification evidence in criminal investigations. To be admissible as evidence in UK courts, this evidence must be conducted by a suitably qualified expert using scientifically validated procedures. Contrary to this notion, however, the field has been largely self-regulated, with little empirical investigation into the validity of face matching procedures, with extensive criticism of forensic face matching procedures in the scientific literature. Practitioner working groups are now addressing these criticisms and standardising working practices, but further effort is required to ensure that the procedures used for forensic face matching are reliable and the limitations known. This chapter will provide a critical analysis of the forensic face matching procedures used in the UK and internationally by forensic face examiners, alongside studies and case examples that have challenged and tested the reliability and accuracy of these procedures.


Sign in / Sign up

Export Citation Format

Share Document