Application of Tamping Coke on Large-Scale BF Smelting

2013 ◽  
Vol 319 ◽  
pp. 378-384
Author(s):  
Yu Chun Dang ◽  
Wen Dong Shu ◽  
Xiu Yun Zhai ◽  
Fang Lan ◽  
Ming Tong Chen

At present, domestic and international large-scale blast furnace applications of tamping coke is still in its exploratory stage. Part of the BF applications tamping coke, there are some problems, including high-temperature zone upward, feeding speed slows , air flow along edge enhancement and heat exchange being inadequate. Through analysis of tamping coke combustion performance and the effects of tamping coke on the material column permeability, The following measures are suggested; using a suitable charging system to open center airflow, stable gas distribution, combined to increase the oxygen-rich rate, increasing the amount of wind, improving coal injection rate. The stable operation of BF is realized, hot metal increased and coke conserved.

1996 ◽  
Vol 34 (5-6) ◽  
pp. 51-57 ◽  
Author(s):  
John W. Hinks ◽  
Howard Cawte ◽  
David A. Sanders ◽  
Adam Hudson ◽  
Christopher N. Dockree

Large-scale High Recirculation Airlift Reactors have been used to treat biodegradable waste waters since the mid nineteen seventies. The system is particularly attractive for situations where the land to locate wastewater works is restricted. Little is known, however, about the fluid dynamics of the gas-liquid mixture flowing around the reactor. This makes the determination of air injection rates difficult if effluent quality and dynamic stability are to be maintained. When the air injected is not sufficient to maintain stable operation the reactor contents may reverse violently resulting in down time, failure to achieve target discharge quality and possible damage to the reactor itself. As a result many reactor installations operate at air injection rates above those necessary for the biological processes. The extra air injected results in higher capital and process costs. This paper considers the effect of air injection rates on the hydrodynamic stability of Airlift Reactors and a two-phase model is proposed to predict stable operation at a reduced air injection rate. Results are presented which show the effect of reactor design on stability.


Author(s):  
Xu Pei-Zhen ◽  
Lu Yong-Geng ◽  
Cao Xi-Min

Background: Over the past few years, the subsynchronous oscillation (SSO) caused by the grid-connected wind farm had a bad influence on the stable operation of the system and has now become a bottleneck factor restricting the efficient utilization of wind power. How to mitigate and suppress the phenomenon of SSO of wind farms has become the focus of power system research. Methods: This paper first analyzes the SSO of different types of wind turbines, including squirrelcage induction generator based wind turbine (SCIG-WT), permanent magnet synchronous generator- based wind turbine (PMSG-WT), and doubly-fed induction generator based wind turbine (DFIG-WT). Then, the mechanisms of different types of SSO are proposed with the aim to better understand SSO in large-scale wind integrated power systems, and the main analytical methods suitable for studying the SSO of wind farms are summarized. Results: On the basis of results, using additional damping control suppression methods to solve SSO caused by the flexible power transmission devices and the wind turbine converter is recommended. Conclusion: The current development direction of the SSO of large-scale wind farm grid-connected systems is summarized and the current challenges and recommendations for future research and development are discussed.


Energies ◽  
2021 ◽  
Vol 14 (8) ◽  
pp. 2287
Author(s):  
Kaina Qin ◽  
Shanshan Wang ◽  
Zhongjian Kang

With the rapid increase in the proportion of the installed wind power capacity in the total grid capacity, the state has put forward higher and higher requirements for wind power integration into the grid, among which the most difficult requirement is the zero-voltage ride through (ZVRT) capability of the wind turbine. When the voltage drops deeply, a series of transient processes, such as serious overvoltage, overcurrent, or speed rise, will occur in the motor, which will seriously endanger the safe operation of the wind turbine itself and its control system, and cause large-scale off-grid accident of wind generator. Therefore, it is of great significance to improve the uninterrupted operation ability of the wind turbine. Doubly fed induction generator (DFIG) can achieve the best wind energy tracking control in a wide range of wind speed and has the advantage of flexible power regulation. It is widely used at present, but it is sensitive to the grid voltage. In the current study, the DFIG is taken as the research object. The transient process of the DFIG during a fault is analyzed in detail. The mechanism of the rotor overcurrent and DC bus overvoltage of the DFIG during fault is studied. Additionally, the simulation model is built in DIgSILENT. The active crowbar hardware protection circuit is put into the rotor side of the wind turbine, and the extended state observer and terminal sliding mode control are added to the grid side converter control. Through the cooperative control technology, the rotor overcurrent and DC bus overvoltage can be suppressed to realize the zero-voltage ride-through of the doubly fed wind turbine, and ensure the safe and stable operation of the wind farm. Finally, the simulation results are presented to verify the theoretical analysis and the proposed control strategy.


Clean Energy ◽  
2021 ◽  
Vol 5 (2) ◽  
pp. 196-207
Author(s):  
Shoichi Sato ◽  
Yasuhiro Noro

Abstract The introduction of large-scale renewable energy requires a control system that can operate multiple distributed inverters in a stable way. This study proposes an inverter control method that uses information corresponding to the inertia of the synchronous generator to coordinate the operation of battery energy storage systems. Simulation results for a system with multiple inverters applying the control method are presented. Various faults such as line-to-line short circuits and three-phase line-to-ground faults were simulated. Two fault points with different characteristics were compared. The voltage, frequency and active power quickly returned to their steady-state values after the fault was eliminated. From the obtained simulation results, it was verified that our control method can be operated stably against various faults.


Energies ◽  
2021 ◽  
Vol 14 (4) ◽  
pp. 1129
Author(s):  
Huijia Yang ◽  
Weiguang Fan ◽  
Guangyu Qin ◽  
Zhenyu Zhao

With the increasing demand for clean and low-carbon energy, high proportion of renewable energy has been integrated into the receiving-end grid. The grid-side energy storage project can ensure the safe and stable operation of the grid, but it still faces many problems, such as high initial investment, difficult operation and maintenance, unclear profit model, lack of business mode. Therefore, it is of great significance to evaluate the comprehensive benefit of energy storage projects in order to guide the sustainable development of large-scale energy storage projects and power system. By studying the technical and economic characteristics of energy storage, this paper establishes a comprehensive evaluation system from four dimensions of energy efficiency, economic, social, and environmental benefit. Combined with typical business modes and determining the subdivision index system of different modes, the comprehensive benefit evaluation model of grid-side commercial storage project based on Fuzzy-Analytic Network Process (ANP) approach is established. Empirical analysis of a 100-megawatt storage project is carried out to evaluate the project benefits comprehensively, the potential problems of the market development and business mode of the grid-side large-scale storage project are discussed, and the future development orientation and suggestions are put forward.


Author(s):  
I. F. Iskakov ◽  
G. A. Kunitsyn ◽  
D. V. Lazarev ◽  
А. А. Red`kin ◽  
S. A. Trubitsyn ◽  
...  

To use effectively internal raw material base, JSC “Ural Steel” accomplished I category major overhaul of the blast furnace No. 2. The main purpose of the overhaul was to design a rational profile which could ensure an ability to operate with a charge containing 95 % of Mikhailovskii GOK (mining and concentrating plant) pellets having basicity of 0.5 by CaO/SiO2. The blast furnace No. 2 having useful volume of 1232 m3, was constructed by design of Danieli Corus, the Netherlands, and was blown in on December 30, 2020. In the process of guarantee tests, step-by-step increase of Mikhailovskii GOK pellets (Fetotal = 60.5 %, CaO/SiO2 = 0.5) content in the charge iron ore part was being accomplished from 55 to 95.1%. Charging of the blend containing pellets in the amount of 55% of iron ore part, was done by charging system 4OOCC + 1COOCC (Ore - Coke) with filling level 1.5 m. Under conditions of pellets part increase in the blend, the charging system was changed to decrease their content at the periphery, to increase it in the ore ridge zone and make it intermediate between periphery and the ore ridge. At the pellets share in the iron ore raw materials 0.75 the charging system was used as the following: 3OOCC + 1COOC + 1COOCC, while at the content 95.1% the following charging system was used: 2COOC + 2COOC + 1COOCC. It was noted that in the period of guarantee tests the furnace running was smooth. The average silicon content in the hot metal was 0.70% at the standard deviation 0.666. Sulfur content in the hot metal did not exceed 0.024%, the blowing and natural gas consumption figures were 2100 m3/min and 11000 m3/min correspondently, oxygen content in the blowing 26.5%, hot blowing and top smoke pressure figures were 226.5 and 109.8 KPa correspondently. The productivity of the furnace was reached as high as 2358 t/day at the specific coke rate 433 kg/t of hot metal. After guarantee tests completion, the pellets content in the iron ore part was decreased gradually from 95 down to 50%. The decreasing was made by 5% in every 6 hours of operation. Application of the mastered technology of the blast furnace No. 2 with the increased share of pellets will enable to stably supply the blast furnaces No. 1, 3 and 4 by iron ore raw materials in the proportion of 30-35% of pellets and 65-70% of sinter.


2018 ◽  
Vol 63 ◽  
pp. 955-986 ◽  
Author(s):  
Adrian Goldwaser ◽  
Andreas Schutt

We consider the torpedo scheduling problem in steel production, which is concerned with the transport of hot metal from a blast furnace to an oxygen converter. A schedule must satisfy, amongst other considerations, resource capacity constraints along the path and the locations traversed as well as the sulfur level of the hot metal. The goal is first to minimize the number of torpedo cars used during the planning horizon and second to minimize the time spent desulfurizing the hot metal. We propose an exact solution method based on Logic based Benders Decomposition using Mixed-Integer and Constraint Programming, which optimally solves and proves, for the first time, the optimality of all instances from the ACP Challenge 2016 within 10 minutes. In addition, we adapted our method to handle large-scale instances and instances with a more general rail network. This adaptation optimally solved all challenge instances within one minute and was able to solve instances of up to 100,000 hot metal pickups.


Processes ◽  
2021 ◽  
Vol 9 (11) ◽  
pp. 1994
Author(s):  
Yanchen Liu ◽  
Minfang Peng ◽  
Xingle Gao ◽  
Haiyan Zhang

The prevention of cascading failures and large-scale power outages of power grids by identifying weak links has become one of the key topics in power systems research. In this paper, a vulnerability radius index is proposed to identify the initial fault, and a fault chain model of cascading failure is developed with probabilistic attributes to identify the set of fault chains that have a significant impact on the safe and stable operation of power grids. On this basis, a method for evaluating the vulnerability of transmission lines based on a multi-criteria decision analysis is proposed, which can quickly identify critical transmission lines in the process of cascading failure. Finally, the proposed model and method for identifying vulnerable lines during the cascading failure process is demonstrated on the IEEE-118 bus system.


2013 ◽  
Vol 2 (1) ◽  
pp. 78-100 ◽  
Author(s):  
Hassan Bevrani ◽  
Mehrdad Gholami ◽  
Neda Hajimohammadi

Economical harvesting of electrical energy on a large scale considering the environmental issues is a challenge. As a solution, Microgrids (MGs) promise to facilitate the widely penetration of renewable energy sources (RESs) and energy storage devices into the power systems, reduce system losses and greenhouse gas emissions, and increase the reliability of the electricity supply to the customers. Although the concept of MG is already established, the control strategies and energy management systems for MGs which cover power interchange, system stability, frequency and voltage regulation, active and reactive power control, islanding detection, grid synchronization, following contingencies and emergency conditions are still under development. Like a conventional power system, a Micro-grid (MG) needs emergency control and protection schemes to have secure and stable operation. Since MG can operate in both grid-connected and islanded mode, in addition to the control loops and protection schemes, extra issues must be considered. Transition between two operation modes requires an extra control plan to eliminate and stabilize transients due to mode changing. This paper presents an overview of the key issues and new challenges on emergency control and protection plans in the MG systems. The most important emergency control and protection schemes such as load shedding methods that have been presented over the past years are summarized.


2017 ◽  
Vol 103 (10) ◽  
pp. 564-569
Author(s):  
Osamu Ishiyama ◽  
Kyosuke Hara ◽  
Masaru Matsumura ◽  
Kenichi Higuchi ◽  
Seiji Nomura
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document