Design of Y422 Retrievable Fracture Bridge Plug and Analysis of Slip Characteristics

2010 ◽  
Vol 139-141 ◽  
pp. 1064-1067
Author(s):  
Dian Xin Li ◽  
Hong Lin Zhao ◽  
Xian Long Liu ◽  
Shan Jun Zheng ◽  
Dai Geng ◽  
...  

According to the demand of exploiting the poor-thin oil layer in Daqing oilfield, Y422 retrievable fracture bridge plug is designed. Match usage of this bridge plug and other instruments can fracture multiple oil reservoirs with one-trip string, which is characterized by simple technology and safety operation. This bridge plug has realistic significance and practical value for improving oilfield economic benefits and provides an extensive application prospect. After setting process, the slips brace the bridge plug whose performance have a directly influence on the oil well productivity and production safety. In order to make sure that the bridge plug slips can meet the anchoring requirement, the actual working state of the slips system was analyzed by using finite element software, and the stress distribution rules were obtained. The results provide theoretical basis for optimizing slip structure and improving working reliability.

Geofluids ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-15
Author(s):  
Guannan Zhou ◽  
Zijiang Zhao ◽  
Zhanping Song ◽  
Hongjian Wang

Due to poor engineering geological conditions of Liujiazhuang tunnel on Shanghai-Kunming Passenger Dedicated Line, the large deformation of weak rock occurs repeatedly during tunnel construction. In this paper, the large-scale finite element software ABAQUS is used to simulate the construction process of a large-section tunnel in weak surrounding rock. It is found that when tunnel face passes through the coal seam, the displacement and stress simulated by the bench method increase abruptly. The maximum stress reaches up to 18 MPa, and displacement reaches 45 mm, which is about twice when without crossing coal seam. It is technically feasible to use the bench method for tunnel construction, under the condition when large settlements is allowed; additionally, the bench method has better technical and economic benefits than that of the CD method. Through the comparative analysis of onsite monitoring data and numerical simulation results, it can be seen that the tunnel is in a dangerous state when passing through the coal seam and measures such as strengthening support or auxiliary advance support should be taken immediately to control the surrounding rock and to ensure tunnel construction safety.


2020 ◽  
Vol 10 (2) ◽  
pp. 61-72
Author(s):  
John Karanikas ◽  
Guillermo Pastor ◽  
Scott Penny

Downhole electric heating has historically been unreliable or limited to short, often vertical, well sections. Technology improvements over the past several years now allow for reliable, long length, relatively high-powered, downhole electric heating suitable for extended-reach horizontal wells. The application of this downhole electric heating technology in a horizontal cold-producing heavy oil well in Alberta, Canada is presented in this paper. The field case demonstrates the benefits and efficacy of applying downhole electric heating, especially if it is applied early in the production life of the well. Early production data showed 4X-6X higher oil rates from the heated well than from a cold-producing benchmark well in the same reservoir. In fact, after a few weeks of operation, it was no longer possible to operate the benchmark well in pure cold-production mode as it watered out, whereas the heated well has been producing for twenty (20) months without any increase in water rate. The energy ratio, defined as the heating value of the incremental produced oil to the injected heat, is over 20.0, resulting in a carbon-dioxide footprint of less than 40 kgCO2/bbl, which is lower than the greenhouse gas intensity of the average crude oil consumed in the US. A numerical simulation model that includes reactions that account for the foamy nature of the produced oil and the downhole injection of heat, has been developed and calibrated against field data.  The model can be used to prescribe the range of optimal reservoir and fluid properties to select the most promising targets (fields, wells) for downhole electric heating as a production optimization method. The same model can also be used during the execution of the project to explore optimal operating conditions and operating procedures. Downhole electric heating in long horizontal wells is now a commercially available technology that can be reliably applied as a production optimization recovery scheme in heavy oil reservoirs. Understanding the optimum reservoir conditions where the application of downhole electric heating maximizes economic benefits will assist in identifying areas of opportunity to meaningfully increase reserves and production in heavy oil reservoirs around the world.


2014 ◽  
Vol 494-495 ◽  
pp. 289-292
Author(s):  
Xin Can Li

Electric furnace roof is an important device for electric steel making, whose heat preservation performance and life-span have a direct impact on the economic benefits of iron and steel enterprise. Considered contact behavior between prefabricate block, this paper establishes the complete CAD/CAE model of the electric furnace roof with finite element software based on the theory of transferring heating subject, and respectively calculates the stable temperature and stress field of the firebrick roof and the prefabricate block roof in last melting stage, as is advantageous to analyze the level and the distribution of temperature and stress of electric furnace roof.


2020 ◽  
Vol 1 (01) ◽  
pp. 45-52
Author(s):  
Susanti Susanti ◽  
Zukryandry Zukryandry ◽  
Hertini Rani

The trend consumption foods of ready to cook and ready to eat  is an alternative choice for the community and increasing public awareness about nutrition and health encourages people to live healthier lives by consuming nutritious foods and have a healthy effect. Processing nuggets production of the Tanjung Jati Women's Farmers Group is quite well received by consumers but the processing of this product is still done with simple technology. Improvements or technological touches need to be done so that the resulting nugget products have added value. The current problem causes the economic benefits that should have been obtained from this production activity can not be felt optimally. Community service is carried out in Tanjung Jati Pekon, Kota Agung Timur District, Tanggamus Regency. Activities in the form of counseling, socialization and practice of nugget product processing and packaging techniques are located at the Balai Rakyat Pekon Tanjung Jati, Kota Agung Timur District, Tanggamus District and the time to carry out activities in January 2020. The nugget training procedures include: a preliminary survey, counseling for the development of nugget product processing for Wanita Tani Pekom Tanjung Jati, socialization of the regulations of the head of the Indonesian drug and food regulatory body regarding packaging and labeling, technical guidance on processing and packaging of nuggets, and technical guidance on business plans and marketing of nuggets. The results of the activities showed the average value of the initial and final evaluation scores of the trainees was 34.77 and 82.50. If viewed from the increase in the score, it appears that an increase in score of 47.8 points. This shows that the training activities went quite well. The training activities were able to motivate the Tanjung Jati Pekon Women Farmers Group in Tanggamus Regency to develop the region's businesses. Advice from the training activities of making and packaging nuggets require further assistance to develop various local resource-based businesses


1971 ◽  
Vol 11 (1) ◽  
pp. 14
Author(s):  
Reg C. Sprigg ◽  
S. McEwin

Coastal pollution, particulaly in estuaries, has already reached serious proportion in some areas of Australia. Public health, fish farming (principally oyster culture), fishery nursery areas, bird rookeries and subtidal faunal and floral communities are endangered. Pesticide levels, algal overgrowths, depleted oxygen levels and rising water temperatures may constitute lethal pollution.The dumping of industrial wastes and sewerage effluents, the construction of restricting barrages, and uncontrolled tourism, spear fishing, excessive shell collecting, careless operation of all-terrain vehicles and other damaging influences are spreading destruction or modifying natural balances in an ever expanding range of coastal environments.Oil pollution, principally by refinery discharges and the cleaning of oil tankers at sea by less responsible operators, often under cover of "flags of convenience", is intensified by the increasing incidence of tanker mishaps at sea. The dangers of accidental oil well blow-outs on the Great Barrier Reef, should drilling be resumed, have been grossly exaggerated by educated people who should have more concern for the facts. In fact many advantages accrue by the research facilities offered by the offshore operations. Such potential dangers recede to insignificance by comparison with scientists' claims as to the depredation of the Reef by the "Crown of Thorns" starfish, about which comparatively little is being done in Australia, and the damage to sensitive life chains from chlorinated hydrocarbons and fertilisers entering the sea via rivers.Mining operations do cause ecological damage or modification in the coastal perimiters, despite reclamation and artificial beautification schemes. The immediate economic benefits, however, must be properly balanced in relation to the overall community needs.Responsible scientific opinion, based on factual data, rather than extremist emotionalism, will continue to strengthen public consciousness, and will continue to encourage mining and oil companies to expand their own conservation programmes and to support C.S.I.R.O. and governmental and university-based research generally. Such public companies are already leaders in the fight against pollution, and employ increasing numbers of research biologists and related scientists in these endeavours. In the ultimate analysis, the public itself must be educated to be prepared to pay more for protection of its coastal inheritance, and to insist that Government Administrative services are streamlined to handle the problems on a national scale.The need for a co-ordinated inter-governmental and Australia-wide authority charged with the responsibility of zoning the coast in order of priority, with provision for wild life protection, public recreational needs and industrial complexes, is of primary importance.Government and Industry must unite in an all-out effort to arrest coastal deterioration and to speed the biological and ecological mapping of the coastal zone.Geosurveys of Australia Pty. Limited — AdelaidePriorities for coastal use and biological "bench marks" must be drawn up as a basis for monitoring and protecting the estuaries and other areas where population and industrial and recreational activities concentrate.


2014 ◽  
Vol 1065-1069 ◽  
pp. 1191-1194
Author(s):  
Zhen Yu Liang ◽  
Lin Geng

Recently, polygon hole castellated steel beams have been studied and applied which had better social and economic benefits. But it brings more difficulties to extend castellated steel components that less studies of castellated bending members. In this essay, ANSYS that is a kind of finite element software had been used to analyze castellated bending members, and characteristics of stability bearing capacity in moment plane of regular hexagon hole castellated steel components had been studied that can provide references to engineering design.


2011 ◽  
Vol 317-319 ◽  
pp. 97-101
Author(s):  
Ze Cheng Song ◽  
Tian Long Zhang ◽  
Chao Zhang ◽  
Xin Hang Song

Electricity transformer is an important, widely used electrical equipment. Current the iron beam sectional of the electricity transformer is based on experienced standards which can not achieve the best economic benefits. According to practical technology, we build a basic optimization model about multistep iron beam section. And we also give a reasonable design on the tolerance zone between the diameter of iron beam sectional circumcircle and the diameter of the winding steel-flue, as well as the arrangement about the oil path in the iron beam, which has a big realistic significance and application value. We come up with five reasonable model assumptions to simplified the problem, turning the tolerance zone design problem into the function extreme one. We adopt "Ideal assumption first, specific modification second" method on designing the oil path, considering all kinds of situations to obtain optimization. The core algorithm is dynamic programming which is much faster, much more stable than using Lingo. All the solving and analyzing on math models are based on C++ programming language.


2013 ◽  
Vol 850-851 ◽  
pp. 262-265
Author(s):  
Yuan Wang ◽  
Quan Jie Gao ◽  
Fei Long Zheng

The slips on packer play an important role on supporting packer and locking rubber tube after they have been anchored, and their performance directly affects the oil yield and production safety. In this paper, the contact between a type of packer slips and casing is analyzed using the finite element software Abaqus, the stress and displacement fringe graphs of the casing under working conditions are obtained, and it offers the guidance on optimal design for packer slips.


2021 ◽  
Vol 236 ◽  
pp. 01023
Author(s):  
Dan Han ◽  
Debin Zhang

The reservoir passes the peak of reserves.The reserves of new investment and development are decreasing year by year. The reserve resources are insufficient. Some of the main development units have entered the stage of secondary or tertiary oil recovery. The dependence of stable oil and gas production on measure production increases continuously. Under this background, the workload of oil well measures increases year by year. It is difficult to control the operation cost of measures. As a result, the overall economic benefits of oilfield enterprises have been declining year by year.The cost of ineffective measures has become an important factor restricting the economic development of oilfields. Through the construction of measures benefit evaluation system.Strengthen the controllability and predictability of each stage of implementation. Special attention should be paid to the pre control management of high cost wells and the transformation of production mode of low efficiency wells. Strictly follow the "ex ante argument, adjustment in matters, and post evaluation optimization" measures to run the management mode. Realize the reasonable allocation of workload and cost, and improve the effective rate of return of funds.


2021 ◽  
Vol 16 (4) ◽  
pp. 153-175
Author(s):  
Xin Jiang ◽  
Xiaoli Chen ◽  
Yongguo Fu ◽  
Hanyan Gu ◽  
Jinming Hu ◽  
...  

An elastoplastic numerical model for calculating the consolidation settlement of wide embankment on soft ground is established using PLAXIS finite element software to investigate the settlement behaviour of soft ground under the wide embankment. The distribution rules are analysed and compared to narrow embankments, such as surface settlements of ground and embankment, lateral displacement of soft ground at the foot of embankment slope and excess pore pressure in soft ground. The influence rule of elastic modulus of soft ground on the settlement of soft ground under wide embankment is discussed. The results show that the settlement distributions of wide and narrow embankments on soft ground are “W” and “V” shapes, respectively. The maximum settlement of wide embankment is near the foot of the embankment slope, which is unequal to the settlement at the centreline of the embankment. The lateral displacement distribution rules of soft ground are both “belly” shaped at the foot of two types of embankments slope. However, the lateral displacement of the wide embankment is larger in each corresponding stage. During the construction period, the excess pore pressure in the soft ground under the wide embankment is much higher than that of the narrow embankment, so the post-construction consolidation time of the wide embankment is longer. Moreover, the macroscopic settlement rule of the wide embankment is still the same with the increase of elastic modulus of soft ground.


Sign in / Sign up

Export Citation Format

Share Document