Forensic Project Management: Simulation Modelling of Rework in Construction Projects

Author(s):  
P.E.D. Love

The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2021 ◽  
Vol 13 (4) ◽  
pp. 1932 ◽  
Author(s):  
Reza Kiani Mavi ◽  
Denise Gengatharen ◽  
Neda Kiani Mavi ◽  
Richard Hughes ◽  
Alistair Campbell ◽  
...  

This paper aims to identify the major research concepts studied in the literature of sustainability in construction projects. Two bibliometric analysis tools—(a) BibExcel and (b) Gephi, were used to analyze the bibliometrics indices of papers and visualize their interrelations as a network, respectively. Therefore, a research focus parallelship network (RFPN) analysis and keyword co-occurrence network (KCON) analysis were performed to uncover the primary research themes. The RFPN analysis clustered the studies into three major categories of evaluating sustainability, project management for sustainability, and drivers of sustainable construction. The KCON analysis revealed that while each paper had a different focus, the underlying concept of all clusters was sustainability, construction, and project management. We found that while ‘sustainability’ was the leading keyword in the first cluster, i.e., evaluating sustainability, it was the second top keyword with the eigenvector centrality of over 0.94 in the other two clusters. We also found that the concept of sustainability should be included in construction projects from the early stages of design and feasibility studies and must be monitored throughout the project life. This review showed that previous researchers used a variety of statistical and mathematical techniques such as structural equation modelling and fuzzy decision-making methods to study sustainability in construction projects. Using an integrated approach to identifying the research gaps in this area, this paper provides researchers with insights on how to frame new research to study sustainability in construction projects.


2011 ◽  
Vol 480-481 ◽  
pp. 1197-1200
Author(s):  
Feng Liu ◽  
Jun Min Wang

In recent years, in order to reduce building energy consumption in China, and vigorously promote the development of ecological construction, the paper studies disadvantages of the cost of traditional project management applications in the ecological construction projects, exploring specific cost management adapt to the ecological construction project.


2013 ◽  
Vol 17 (1) ◽  
pp. 21-31 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Nerija Banaitienė

This paper aims to identify a comprehensive list of critical success factors for construction projects in Lithuania. Based on the available literature review, this paper identified 71 success factors under 7 broad groups. Based on the survey results, ten factors including project manager competence, project management team members' competence, project manager coordinating skills, client clear and precise goals/objectives, project value, project management team members' relevant past experience, project manager organising skills, project manager effective and timely conflict resolution, client ability to make timely decision, and project manager experience were determined as the most important success factors for construction projects. These critical success factors are of great significance both to researchers and industry practitioners.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Marios Stanitsas ◽  
Konstantinos Kirytopoulos

PurposeThis study aims to investigate the underlying factors that give rise to the set of sustainability indicators which are used for the implementation of sustainable construction projects and eventually the production of sustainable built assets.Design/methodology/approachTo accomplish the purpose of this research, an online questionnaire survey was administered to a sample of 200 experts. By employing the statistical method of exploratory factor analysis (EFA), five distinct dimensions (factors) of stakeholders' attitudes were revealed.FindingsThe findings indicate that the sustainability indicators are based on five underlying factors, namely (1) sustainable competitiveness; (2) stakeholder engagement; (3) sustainable economic growth; (4) social sustainability; and (5) resource conservation and environmental policy.Research limitations/implicationsMore studies would be welcome to verify the underlying factors revealed in this paper.Practical implicationsThe knowledge of the underlying factors enables senior management to maintain a balance of choices during the project management (PM) phase in order to implement and deliver sustainable construction projects. Furthermore, the findings deepen the understanding toward sustainable PM practices by providing insights on its core attributes.Originality/valueAs a theoretical contribution to knowledge, this study enhances the body of knowledge by revealing the underlying factors that give rise to the predefined set of the 82 sustainability indicators which are used to enable sustainable construction projects. In practice, the findings aid senior management in adopting strategies that enhance the delivery of sustainable construction projects.


2013 ◽  
Vol 671-674 ◽  
pp. 2973-2977
Author(s):  
Jaeh Yun Choi ◽  
Kyu Sung Lee

As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner.


2021 ◽  
Vol 236 ◽  
pp. 05002
Author(s):  
Longbo Zhang ◽  
Hao Liu

BIM technology can participate in the entire process of building construction projects, using a three-dimensional way to restore all links involved in the process of building production. This intuitive and clear presentation method helps architects correct and quickly repair existing loopholes in a timely manner, ensure the smooth development of construction projects, improve efficiency and reduce losses due to project delays.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.


Author(s):  
Žanesa Ljevo ◽  
Mladen Vukomanović ◽  
Suada Džebo

AbstractAlthough the quality of a process affects the quality of the end product, there is currently an insignificant amount of knowledge about the quality of project management (PM) processes that directly affect the quality of the delivered product (constructed building). This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the constructed building. The quality of the PM process is represented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project participants (with different managerial perspectives) in terms of the indicators of quality of the delivered product. All participants, regardless of managerial perspective, believe that the most important indicator of the quality of products for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046%) of the basic set of variables.


Companies try to use better techniques to deal with complex projects. The maturity of companies to apply these better techniques can guarantee project success or not. The environment, where the engineering and construction project is developed, also has influence over the success. The maturity of a company's project management processes is also a factor of success. This chapter aims to talk about concepts related to engineering and construction initiatives.


Sign in / Sign up

Export Citation Format

Share Document