Investigating Project Managers’ Waste Reduction Behavior in Construction Projects

ICCREM 2017 ◽  
2017 ◽  
Author(s):  
Hongping Yuan ◽  
Jing Wang
2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2021 ◽  
Vol 11 (9) ◽  
pp. 4122
Author(s):  
Young-Jun Park ◽  
Chang-Yong Yi

Construction quality is one of the primary management objectives relating to duration and cost for construction projects. Project managers struggle with minimizing duration and cost while maximizing quality for construction projects. In construction projects, duration and cost have management priorities. On the other hand, quality is considered a matter of achievement only when it reaches a certain level. Although the importance of quality control in construction management has been constantly discussed, it has still been sacrificed under the goal of shortening construction duration and reducing costs. This study presents a method for estimating the quantitative quality performance of construction operations in which the level of detail is breaking into the work task level for intuitive quality performance evaluation. For this purpose, quality weights of resources that have a proportional quality importance weight and quality performance indexes of resources are utilized for estimating the quantitative quality performance of construction operations. Quality performance estimation and the resource allocation optimization system is presented and validated using a construction simulation model.


Buildings ◽  
2021 ◽  
Vol 11 (5) ◽  
pp. 214
Author(s):  
Ann T. W. Yu ◽  
Irene Wong ◽  
Zezhou Wu ◽  
Chi-Sun Poon

Hong Kong is a densely populated city with high-rise developments, and as in other metropolitan cities, the amount of waste generated from construction projects in the city is increasing annually. The capacity of existing landfills is expected to be saturated by the 2020s. Construction waste management has been implemented for years but the performance is still not satisfactory. The aim of this research paper is to explore and formulate strategies and measures for effective construction waste management and reduction in highly urbanized cities such as Hong Kong. A desktop study on construction waste management practices was carried out for a preliminary understanding of the current situation in Hong Kong. Semistructured interviews and focus group meetings were further conducted to shed light on how to improve construction waste reduction and management in Hong Kong. The main contributions of this research study are the potential short-term, medium-term, and long-term strategies, which are related to the design stage, tender stage, construction stage, and government support. The five major strategies recommended are financial benefits to stakeholders, public policies in facilitating waste sorting, government supports for the green building industry, development of a mature recycling market, and education and research in construction waste minimization and management.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2021 ◽  
Vol 56 (3) ◽  
pp. 473-484
Author(s):  
Zulkifli Lubis

The biggest threat that results in the project not being successful is failure to build a stakeholder project. Based on research on construction projects in developing countries, the lack of communication among workers due to cultural uniformity and the uniqueness of their respective regions can become work constraints that can affect implementation performance and productivity, namely, there is a 69.61% decrease in time performance. The main objective of this research is to analyze the role of communication management in improving the performance of construction project managers in developing countries, particularly the role of construction managers in implementing a construction project. This research uses a qualitative approach and a case study method. Sampling using purposive sampling. Forum Group Discussion to see how the opinions of construction project managers in Indonesia view the importance of communication management in the success of construction projects. The study results explain that the need for Public Relations Infrastructure management plays a role in ensuring various policies and communication to the public. This is a reflection of the effective function of public relations in the implementation of infrastructure development. In carrying out the construction, the construction project manager must pay attention to communication dynamics to support the success of infrastructure development projects. Contractors and other parties involved in infrastructure development must raise awareness of the essence of effective communication in fostering trust in the public concerned with infrastructure development.


2021 ◽  
Vol 13 (23) ◽  
pp. 13085
Author(s):  
Jan Kowalski ◽  
Mieczysław Połoński ◽  
Marzena Lendo-Siwicka ◽  
Roman Trach ◽  
Grzegorz Wrzesiński

Exceeding the approved budget is often an integral part of the implementation of construction projects, especially those where unforeseen threats may occur. Therefore, each construction investment should contain elements of risk forecasting, mainly in terms of the cost of its implementation. Only a small number of institutions apply effective cost control methods, taking into account the specifics of a given industry. Especially small construction companies that participate in the structure of the implementation of large construction projects as subcontractors. The article presents a method by which it is possible to determine, with certain probability, the final cost of railway construction investments carried out in Poland. The method was based on a reliable database of risk factors published in sources. In this article, the main presumptions of the original method are presented, which take into account the impact of potential, previously recognized, risks specific to railway investments, and enable project managers to relate them to the conditions where the implementation of a specific object is planned. The authors assumed that such a relatively simple method, supported by a suitable computational program, would encourage teams that plan to implement railway projects to use it and increase the credibility of their schedules.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.


2010 ◽  
Vol 163-167 ◽  
pp. 4564-4569 ◽  
Author(s):  
Ahmad Firman Masudi ◽  
Che Rosmani Che Hassan ◽  
Noor Zalina Mahmood ◽  
Siti Nazziera Mokhtar ◽  
Nik Meriam Sulaiman

Estimation of construction and demolition (C&D) waste amount is crucial for implementing waste minimization program. Estimation of C&D waste amount generated is a mean in assessing the potential for waste reduction. Thus, a better understanding of C&D waste generation in terms of causes and sources can be achieved. The aim of this paper is to conduct a review on available construction waste quantification methods from previous studies, which have been utilized in certain countries, while attempting to choose the most suitable and applicable method, and to direct future studies for better quantification methods. This review is applicable only for building construction projects and did not include civil/infrastructure, demolition, renovation, and excavation projects. Six quantification methods and/or waste audit tool available from literatures are discussed, which include their limitation and future direction for this study. It is believed that some combination of these quantification methods could make a good impact in accurate numerical estimation of construction waste amount generated in building construction projects. A strong and accurate database as presented by Soliz-Guzman, combined with effective, vital, and resourceful estimation suggested by Jalali’s Global Index (GI), also with the aid of user-friendly software tool like the SMARTAudit could provide an effective and reliable waste quantification.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.