The true motives behind the adoption of QLASSIC-CIS 7: 2006

2015 ◽  
Vol 32 (6) ◽  
pp. 603-616 ◽  
Author(s):  
Kenn Jhun Kam ◽  
Ahmad Hilmy Abdul Hamid

Purpose – The purpose of this paper is to investigate contractors’ awareness level and adoption of QLASSIC assessment system in construction industry and to identify the variables that influenced the adoption of QLASSIC assessment system. Design/methodology/approach – Quantitative research method was adopted in order to test the above issues. The questionnaire composed for two parts: awareness and adoption of QLASSIC system; and the factors that influenced the adoption of QLASSIC system. Those contractors who registered under grade 6 and 7 are the scope of respondents in this study. Findings – The adoption of QLASSIC assessment is not significantly affected by the awareness whereas the motivations and barrier factors do. It was discovered that the contractors perception on QLASSIC adoption are basically due to the significant factors; the internal motivations and barrier. The major influencing factors are internal motivation factors, external motivation factors and barrier factors. Originality/value – This study reveals the true motives behind the adoption of QLASSIC assessment in the construction industry, where this finding significantly contributes to the understanding of contractors’ perception on this quality assurance program for the construction industry.

2016 ◽  
Vol 34 (4/5) ◽  
pp. 446-462 ◽  
Author(s):  
Serdar Durdyev ◽  
Syuhaida Ismail

Purpose The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. Design/methodology/approach Questionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels. Findings Consequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. Originality/value It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner.


2016 ◽  
Vol 23 (5) ◽  
pp. 1111-1131 ◽  
Author(s):  
AbdulLateef Olanrewaju

Purpose – The opportunities that the emerging markets present to the players in the construction industry means that the players need to expand on the scope and size of their responsibilities and duties to the stakeholders. Each of the professionals now demands more specialised and sophisticated services from one another. The other players in the construction industry now require more emerging responsibilities and duties from the quantity surveyors. The purpose of this paper is to examine the roles that “modern” quantity surveyors play by measuring the gaps that exist in the services that the quantity surveyors provide. Design/methodology/approach – Primary data are collected through survey questionnaires. In total, 23 roles played by modern quantity surveyors are identified and addressed to the respondents to rank the rate at which quantity surveyors provide these “emerging” services. The collected data were analysed statistically. Findings – The results of the findings led to the conclusion that the quantity surveyors were not meeting the expectations of other players. Therefore, for competitiveness, quantity surveyors need to better meet demand expectations. Research limitations/implications – This findings of this research are constrained to the services or functions that the quantity provide in the construction industry. Practical implications – This knowledge is valuable to academic institutions that offer quantity surveying programmes, to practicing quantity surveyors, governments, and other players in the construction industry. It will allow quantity surveyors to reconcile supply and demand expectations. Originality/value – There is no known conclusive empirical study on services offered by quantity surveyors in any emerging markets. Therefore, the findings offer a fresh understanding on the services of quantity surveyors not only in Nigeria but elsewhere. While some of the services are common, others are peculiar to emerging markets.


Author(s):  
Aly Elgayar ◽  
Salwa Mamoun Beheiry ◽  
Alaa Jabbar ◽  
Hamad Al Ansari

Purpose Over the past decade, the United Arab Emirates (UAE) introduced several green regulatory guidelines, federal decrees, and a considerable number of environmentally friendly initiatives. Hence, the purpose of this paper is to investigate the top green materials and systems used currently in the UAE construction industry as per the new laws dictate as well as see if professionals are switching over to incorporate more green materials, systems, and/or designs. Design/methodology/approach The work involved reviewing internationally popular green materials and systems for construction, developing a questionnaire based on the literature review, surveying professionals in the seven UAE emirates, and ranking the findings based on the relative importance index. Findings Findings found the top used green materials and system in the UAE’s construction industry. As well as identified that there is a communication gap between the design and implementation phases that is possibly hindering the use of more green materials and systems. Originality/value This study sets a baseline to measure the UAE’s progress over the coming years in terms of integrating more green construction materials, systems, methodologies, and trends.


2014 ◽  
Vol 26 (3) ◽  
pp. 235-252 ◽  
Author(s):  
Caroline Bayart ◽  
Sandra Bertezene ◽  
David Vallat ◽  
Jacques Martin

Purpose – The purpose of this paper is to investigate if the use of “serious games” with students can improve their knowledge acquisition and their academic performance. Design/methodology/approach – The research is an exploratory investigation resorting to the use of a serious game to evaluate the evolution of the students’ competencies in project management, through questionnaires processed using a structural “learning model.” Findings – This research shows indeed that the use of “serious games” improves the knowledge acquisition and management competencies of the students with the evidencing of significant factors contributing to this improvement. Practical implications – The findings of this research show that serious games can be an effective tool to be used in teaching students particularly as traditional methods are less and less accepted by today's students. Originality/value – Although the use of games is not something new in education, it is still limited in teaching practices in higher education. This experiment can help lecturers and trainers to resort to them in their pedagogy and to conceive them according to variables that can enhance their effectiveness.


2018 ◽  
Vol 25 (2) ◽  
pp. 241-256 ◽  
Author(s):  
Haytham Besaiso ◽  
Peter Fenn ◽  
Margaret Emsley ◽  
David Wright

Purpose The standard forms of construction contract are receiving greater attention in the management of projects scholarship as they probably influence the project success and project disputes. The extant literature suggests that the standard forms of construction contract are one of the top sources of disputes. The purpose of this paper is to examine the effectiveness of the standard forms of construction contract, FIDIC and NEC, in reducing disputes in the Palestinian construction industry. Design/methodology/approach The researchers have used qualitative methods to collect data and more specifically have undertaken 12 semi-structured interviews. Findings The study reveals that the standard forms of construction contract can be a tool to minimise disputes, but certainly not to eradicate them, and NEC appears to be more capable than FIDIC to do so. Originality/value This study contributes to knowledge by bringing an industrial perspective into the role of standard forms of contract in disputes creation and avoidance. The interviewees, recurrent users of FIDIC contract, criticised certain features and expressions and proposed some solutions.


2018 ◽  
Vol 36 (1) ◽  
pp. 77-92 ◽  
Author(s):  
Mazen J. Al-Kheetan ◽  
Mujib M. Rahman ◽  
Denis A. Chamberlain

Purpose The purpose of this paper is to investigate the performance of new and innovative crystallising materials, so-called moisture blockers, in protecting masonry structures from water ingress. Design/methodology/approach Two masonry wells were constructed: one with lime mortar and the other with cement-based mortar in order to hold water inside, and then a moisture blocking product was applied at dry and wet conditions to the negative hydrostatic pressure side. The moisture levels of both, the surfaces and the substrate, were then observed for 14 days. Findings Results demonstrated that moisture blocking materials are effective methods in reducing the levels of surface moisture for bricks, mortar-brick interface and mortar. Originality/value Moisture blockers use the available water in the masonry to block the passage of water to the surface of the masonry, filling pores, cracks and spaces at the interface between mortar and bricks. This approach will deliver a wider understanding of how water-based moisture blockers work and the scenarios in which they are best applied. The pursuit of possible environmentally friendly and sustainable materials for use in the construction industry is the key driver of this research.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohamed Marzouk ◽  
Heba Elsaay ◽  
Ayman Ahmed Ezzat Othman

PurposeThis research is built up upon exploring the concepts of building information modeling (BIM) adoption and strategy formulation with the aim to develop a strategy for implementing BIM in the Egyptian construction industry.Design/methodology/approachThe development of the BIM implementation strategy was based on two pillars, namely the literature review and results of the survey questionnaire and interviews. First, the review of literature helped investigating the BIM challenges and international strategies developed to implement BIM worldwide.FindingsThe research presented recommendations to assist policymakers in Egypt to facilitate BIM implementation.Originality/valueAlthough multiple frameworks have been proposed to aid in BIM implementation, a practical strategy to implement BIM in Egypt is still lacking. Moreover, current market scale studies neglect nonsoftware aspects of BIM adoption, do not identify market gaps or reflect market-specific criteria. As such, it cannot be used by policymakers to facilitate BIM diffusion.


2022 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benjamen Sunkanmi Adeyemi ◽  
Clinton Ohis Aigbavboa

PurposeThis study aims to evaluate impacts of construction professionals (CPs) conflict on performance in the Nigerian construction industry (NCI).Design/methodology/approachA quantitative method was used for this research. Questionnaires were sent to various CPs in Southwestern part of Nigeria. A total of 150 questionnaires were sent out, while 135 were gotten back from the partakers. The data received from the partakers were computed by applying descriptive and exploratory factor analysis.FindingsIn this study, conflict leads to the abandonment of the CPs’ task being rated highest by the participants. This was followed by conflict that results in insufficient communication, generates job pressure, results to frustrations and displeasure among the CPs, helps in early problem identification, causes work damage among professionals, helps in solving professional organization problems, improves productivity of professionals, improves communication among the professionals and so on.Research limitations/implicationsThis paper is limited to CPs that are members of professional bodies in Nigeria, and only 135 participants participated. Though, this paper suggests that a mixed-method approach should be utilized in further studies with a wider coverage.Practical implicationsThe findings from this paper will increase the understanding of CPs in Nigeria on various impacts of conflict on performance in the construction industry, most specifically the professional bodies. Moreover, this study will increase the knowledge of CPs to always avoid whatever that leads to the abandonment of their tasks. Additionally, this study will benefit the CPs to avoid insufficient communication among themselves, in order to accomplish great performance and efficiency in their respective professional bodies.Originality/valueSince previous studies on impacts of construction conflict in Nigeria were only focused on contractors and consultants in construction project, this current study filled the gap by evaluating the impacts of CPs’ conflict on performance in the NCI. Also, the method of analysis used for this study is exemptional because previous studies have overlooked the method. However, it is recommended that CPs must communicate more with others so as to ensure favorable conflict effects on performance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tong Lin ◽  
Sainan Lyu ◽  
Rebecca Jing Yang ◽  
Linda Tivendale

PurposePrefabricated housing has become a boom industry across the world; however, the uptake of offsite construction (OSC) approaches in Australian low-rise buildings is rather low compared with high-rise buildings in other countries. This study aims to investigate and analyse the adoption of different levels of OSC approaches and the selection of different procurement options in Australian low-rise residential buildings.Design/methodology/approachThe research objectives were pursued through a mixed research method. An empirical questionnaire survey was carried out with 35 professionals in the Australian building and construction industry. Semi-structured interviews were conducted with 20 interviewees and analysed using thematic analysis method in NVivo software.FindingsThe research results found that the most suitable OSC level for Australian low-rise buildings is components-based prefabrication and identified the barriers to OSC uptake for each OSC level. The study also showed that the best option of procuring prefabricated products is from Australian manufacturers, followed by Australian suppliers/dealers and overseas manufacturers. Panelised prefabrication and components-based prefabrication are ranked as the most suitable OSC approaches for Australian manufacturers. Modular prefabrication is regarded as the most suitable for overseas manufacturer, while components-based prefabrication is the most suitable for Australian suppliers/dealers.Originality/valueThe selection of various OSC approaches and different procurement options in the low-rise residential buildings are scarcely explored topic, and thus, this study provides knowledge of interest for both researchers and practitioners.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Chipozya Kosta Tembo ◽  
Franco Muleya ◽  
Emmanuellie Phiri

PurposeThis research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance.Design/methodology/approachThe approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients.FindingsFindings revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations.Originality/valueForeign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.


Sign in / Sign up

Export Citation Format

Share Document